Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Andrew Yishun

Members
  • Content Count

    8
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Andrew Yishun

  • Rank
    Member

Previous Fields

  • Gender
    Male

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. I am currently using Nick to renovate my house. I leave everything to him cos I trusted him will do the best for me.
  2. Grill only at the windows facing the common corridor. (I.e. dinning & study room at the lower level). i used all transparent glass for all my windows.
  3. This is an update from my previous blog. I dunno why I can’t find my initial blog. here are the recent photos
  4. This is an update from my previous blog. I dunno why I can’t find my initial blog. here are the recent photos of my house renovation done by Renoguyz, the famous Nicholas. The toilet tiles are all done up. I used blinking white Mosaic tiles as my feature wall for master bedroom toilet. The common toilet at level 2 I use grey tiles as the whole house will be grey, Black & white theme. Black frame with transparent glass brightens up the house allowing natural light from the external environment to pass thru the house. I also hacked down the full wall of one of the bedroom at level 2. This will be a full glass bedroom with black coated frame. It will be meant for our working / entertainment usage. A seater was also constructed at the balcony area. (Yet to complete) this is meant for cosy corner & place for housemate / visitors to smoke here. Electrical wiring, aircon trunking has been done up. Next week will be the installation of false ceiling. Really looking forward....✌️✌️✌️ Water storage heater tank has been installed as well. I find the circular shape tank to be bulky so I opted for the squarish one. Construction false ceiling in progress Boxing up of staircase railing done First coat of painting done A view from the top Flooring done✌️✌️✌️ Flooring of living room & bedroom (at lower floor) done. Balcony will be another colour. Polishing of rooms & staircase done After polishing then mark the beginning of the extensive carpentry work which lasted 2 weeks for installation. Study table @ study /entertainment room Tv feature wall + Console @ living room Toilet cabinet under construction Wardrobe at master bedroom Completed full glass panel study cum entertainment room at upper level Shoe Rack at entrance (70% complete) Kitchen cabinet done pending for table top wardrobe at one of the bedroom Completed wardrobe with black tinted glass Glass Display Shelves + shoe rack Thanks to Renoguyz for their Creative ideas Master bedroom bed frame.
×