10th October 2010 – Confirmed Renovator ID and paid 20% deposit.

15th October 2010 – Confirmed Aircon system - Daikin System 4 by Gavin Care

16th October 2010 – Floor design layout is out.

Selection of wall paints and cupboard laminates

Aircon engineer came down to collect deposit and discuss tubing plans and take measurements.

Went to Italu to select whole house lightings. Abt 20 lightings.

18th October 2010 - Gavin Care came to install Aircon. Mansory works in kitchen started and done up. Wiring started and done up too.

Living Room

livingrm.jpg

http://i443.photobucket.com/albums/qq156/s...18_860865_n.jpg

Service Yard

http://i443.photobucket.com/albums/qq156/s...serviceyard.jpg

Kitchen

http://i443.photobucket.com/albums/qq156/s...HOME/fridge.jpg

Bedroom 2

http://i443.photobucket.com/albums/qq156/s...ME/bedroom2.jpg

 

Share this post


Link to post
Share on other sites
Hi, Very nicely and fast done up.

So nothing is done for the MBR? and the other rooms? 20k quoted is for what items?

Able to email me your quotation? kenlim_76@hotmail.com.

I am still waiting for my keys for Blk 306D. :)

yup..alan's renovation is very fast..now only waiting for the mirror and tempered glass which takes abt 10 days for it to arrive.

i find master bedroom a bit small..so we only did a wardrobe and getting a new bedframe and side table fm seahorse.

quotation is handwritten on a invoice, as alan was able to give us the price immediately based on our requirement....so hard for me to copy and paste.. but basically the quotation is for the items of the pic posted. of cuz excluding lights and air con.

the sink/tap, hob and hood is inclusive of the quotation, but we did a slight top up for the hob and hood as we wanted a change of colour.

the most expensive items are the mirrors in living room, tempered glass door in master bedroom toilet & kitchen and tempered glass for kitchen walls between the cabinets.

 

Share this post


Link to post
Share on other sites
yup..alan's renovation is very fast..now only waiting for the mirror and tempered glass which takes abt 10 days for it to arrive.

i find master bedroom a bit small..so we only did a wardrobe and getting a new bedframe and side table fm seahorse.

quotation is handwritten on a invoice, as alan was able to give us the price immediately based on our requirement....so hard for me to copy and paste.. but basically the quotation is for the items of the pic posted. of cuz excluding lights and air con.

the sink/tap, hob and hood is inclusive of the quotation, but we did a slight top up for the hob and hood as we wanted a change of colour.

the most expensive items are the mirrors in living room, tempered glass door in master bedroom toilet & kitchen and tempered glass for kitchen walls between the cabinets.

 

Share this post


Link to post
Share on other sites
hihi,

20k was it quoted with the grills? What was quoted for your grills? for all the rooms too?

Did you do up any windows in the service balcony?

Thanks

ya..20k quoted with aluminium grills, including the one at service yard.

actually alan have a standard package tat cost abt 12k, with i think 150m of grills(excluding service yard) cuz service yard and the rooms grills are different. service yard grills hve to be spray with colours approve by hdb. the package is written on the flyer tat they gave out at the carpark.

didn't do windows cuz they say the rain wont come in...haha. but better to do grills, like much more safer to prevent any intruders

 

Share this post


Link to post
Share on other sites

yup... renovations is fast

renovation as at 5 nov 2010:

living room mirrors half way up

http://i443.photobucket.com/albums/qq156/s...yy/IMG_4601.jpg

wardrobe mirror up

http://i443.photobucket.com/albums/qq156/s...yy/IMG_4605.jpg

tv console tempered glass up

http://i443.photobucket.com/albums/qq156/s...yy/IMG_4604.jpg

kitchen granite top up...pending for tempered glass only

http://i443.photobucket.com/albums/qq156/s...yy/IMG_4599.jpg

scheduled items for next week...

9th nov - installing of all bedroom/toilet doors

11/12th nov - remaining kitchen glass and living room mirror

13th nov - installation of toilet accessories

 

Share this post


Link to post
Share on other sites

renovation as at 11 nov 2010

curtains railings up

http://i443.photobucket.com/albums/qq156/s.../Picture018.jpg

Total of 5 doors up - fm door supplier Uncle Lor Seng

http://i443.photobucket.com/albums/qq156/s.../Picture016.jpg

only left tempered glass in kitchen to be up by this week and installation of toilet accessories this coming sat..and soon can do acid wash and 2nd painting with all the finally touch up!

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×