Hi guru bros and sisters...i've seen about 6-7 Ids and contractors and apparently the bill are always very similar to each other...there isnt any price diff at all...can i ask if its my ID charging cheaply or the contractors are carroting me...I've appending a quote from one of the ID recommended by RT forummers here...as reference..

RE: QUOTATION FOR THE ABOVE INTERIOR DESIGN & RENOVATION WORKS

1.0 - PROFESSIONAL SERVICES

1.1 Design consultation FOC

1.2 Space Planning FOC

1.3 Perspective Drawings FOC

1.4 Material & Colour Proposal FOC

1.5 Project Management : FOC

$ -

2.0 - DEMOLITION WORKS

2.1 To supply labour & hack existing floor tile for kitchen $ 230.00

2.2 To supply labour & hack existing floor tile for yard $ 180.00

2.3 To supply labour & hack existing floor tile for common toilet $ 180.00

2.4 To supply labour & demolish existing toilet accessories & sanitary ware at

both toilet $ 120.00

2.5 To supply labour & remove existing vanity at master toilet $ 80.00

2.6 To supply labour & remove existing kitchen cabinet with disposal by M.O.E

regulation $ 220.00

2.7 To supply labour & remove wardrobe at master room with disposal by

M.O.E regulation $ 150.00

2.8 To supply labour & wooden partition at foyer with disposal by M.O.E

regulation : $ 120.00

SUB-TOTAL $ 1,280.00

3.0 - MISCELLANEOUS WORKS

3.1 To supply & paint of wall & ceiling for whole house include all expose

piping ( matex paint ) $ 1,400.00

3.2 To supply & vanish existing 4 set door & door frame $ 320.00

3.3 To supply & vanish existing 2 set sliding door & door frame $ 300.00

3.4 To supply & vanish existing 1 set bi-fold door & door frame $ 120.00

3.5 To supply & vanish existing 3 pcs wood plank at window bay $ 240.00

3.6 To apply for skip tank permit $ 150.00

3.7 To haulage material to unit c/w debris disposal $ 350.00

3.8 To supply labour for general cleaning whole house include acid cleaning

for floor, wall & window $ 250.00

3.9 To supply & plaster kitchen wall with Alturas hard $ 750.00

SUB-TOTAL : $ 3,880.00

4.0 - PARQUET WORKS

4.1 To suppply & revanish existing parquet flooring for 3 bed room $ 430.00

SUB-TOTAL : $ 430.00

5.0 - PLUMBING WORKS

5.1 To supply labour to joint in/out let pipe for kitchen sink $ 150.00

5.2 To supply labour & install 01 no wash basin at master toilet c/w lever tap $ 60.00

5.3 To supply labour & install 01 no wash basin at common toilet c/w lever tap $ 60.00

5.4 To supply labour & install 01 no sitting bowl c/w flashing tank at master

toilet $ 120.00

5.5 To supply labour & install 01 no sitting bowl c/w flashing tank at common

toilet $ 120.00

5.6 To provide labour to install toilet accessories at master toilet $ 40.00

5.7 To provide labour to install toilet accessories at common toilet $ 40.00

SUB-TOTAL : $ 590.00

6.0 - MASONRY WORKS

6.1 To supply & lay matt finish homogenous tile for kitchen ( tile up to $2.80

psf ) $ 900.00

6.2 To supply & lay matt finish homogenous tile for yard ( tile up to $2.80 psf ) $ 550.00

6.3 To supply & lay matt finish homogenous tile for common toilet ( tile up to

$2.80 psf ) $ 550.00

6.4 To supply & apply water proofing membrane for kitchen & commn toilet

flooring $ 180.00

6.5 To supply & construct 50mm cabinet base with tile skirting $ 280.00

6.6 To supply & construct shower curb at common toilet with tile finish $ 80.00

6.7 To supply & construct sink support with hollow block & 60x60 polish

homogenous tile finish $ 850.00

SUB-TOTAL : $ 3,390.00

7.0 - CARPENTRY WORKS ****

7.1 To supply & fabricate 6 ft designed TV consol with laminate finish $ 660.00

SUB-TOTAL : $ 660.00

8.0 - CARPENTRY WORKS AT MASTER BEDROOM

8.1 To supply & alter existing wardrobe c/w new cabinet & laminate finish $ 750.00

8.2 To supply & fabricate king size bed c/w pull out drawer & laminate finish $ 1,000.00

8.3 To supply & fabricate 2 set wall mounded 2.5 ft shelf c/w laminate finish $ 200.00

8.4 To supply & fabricate 2.5 ft designed full high wardrobe c/w glass swing

door aluminium frame & laminate finish $ 625.00

8.5 To supply & fabricate 4.5 ft designed suspened study table c/w laminate

finish $ 540.00

SUB-TOTAL : $ 3,115.00

9.0 - CARPENTRY WORKS AT STUDY ROOM

9.1 To supply & fabricate 9.5 ft designed full high walk in wardrobe with colour

polyester board $ 2,090.00

9.2 To supply & fabricate 3 ft suspended drassing table with laminate finish $ 300.00

9.3 To supply & install 1 pc 3 x 6 ft mirror for drassing table $ 180.00

SUB-TOTAL : $ 2,570.00

10.0 - CARPENTRY WORKS AT KITCHEN

10.1 To supply & fabricate 32 ft solid plywood kitchen cabinet c/w laminate

finish, 2 glass door, 4 drawer, 1 cutlery tray & 1 stainless steel dish tray $ 3,200.00

10.2 To supply & install 18 ft solid INDIA granite work top with 3 inch profile $ 1,800.00

10.3 To supply & install L-shape glass backing at cabinet area $ 750.00

10.4 To supply & fabricate 3 pcs cabinet door at support c/w laminate $ 285.00

SUB-TOTAL : $ 6,035.00

11.0 - CARPENTRY WORKS AT MASTER TOILET

11.1 To supply & fabricate 3 ft suspended vanity cabinet c/w glass door

aluminium frame & laminate finish $ 390.00

11.2 To supply & install 3 ft INDIA granite work top c/w 2 inch profile $ 300.00

SUB-TOTAL : $ 690.00

12.0 - CARPENTRY WORKS AT COMMON TOILET

12.1 To supply & fabricate 3 ft top hung store cabinet with laminate finish $ 330.00

SUB-TOTAL : $ 330.00

13.0 - GLASS WORKS

13.1 To supply & change 6 mm tick glass at yard door with clear finish $ 250.00

13.2 To supply & change 6 mm tick glass at yard window with clear finish $ 160.00

13.3 To supply & install 10mm tick tampered glass shower screen at common

toilet c/w swing door $ 750.00

SUB-TOTAL : $ 1,160.00

14.0 - MARBLE WORKS

14.1 To supply & repolish existing marble flooring **** & dinning $ 691.20

14.2 To supply & repolish existing marble flooring at master toilet $ 180.00

14.3 To supply & wax existing marble wall tile at master toilet $ 80.00

SUB-TOTAL : $ 951.20

15.0 - WIRING WORKS

15.1 To supply labour to install 2 light at foyer $ 24.00

15.2 To supply labour to install 1 light at study $ 12.00

15.3 To supply labour to install ceiling fan at room 2 $ 45.00

15.4 To supply labour to install 1 light at master room $ 12.00

15.5 To supply labour to install ceiling fan at master room $ 45.00

15.6 To supply & relocate 1 double point at study ( conceal ) $ 100.00

15.7 To supply labour to run double point at master room $ 75.00

15.8 To supply labour to run SCV point at master room : $ 95.00

SUB-TOTAL $ 408.00

GRAND TOTAL :

$ 25,489.20

THe final price he is willing to close the deal at is $25k......

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Dear guru bros and sis if you see this repost pls pardon me as thats becoz im unable to see the post which i've previously submmitted hence...am redoing this again.......can you advice me if this quotation from ID is okie as i've been to 5-7 ID and contractors and their quotations are the SAME....i wonder why...its either the ID are cheap or the contractors are chopping me....pls pls advice..

RE: QUOTATION FOR THE ABOVE INTERIOR DESIGN & RENOVATION WORKS

1.0 PROFESSIONAL SERVICES

1.1 Design consultation FOC

1.2 Space Planning FOC

1.3 Perspective Drawings FOC

1.4 Material & Colour Proposal FOC

1.5 Project Management : FOC

$ -

2.0 DEMOLITION WORKS

2.1 To supply labour & hack existing floor tile for kitchen $ 230.00

2.2 To supply labour & hack existing floor tile for yard $ 180.00

2.3 To supply labour & hack existing floor tile for common toilet $ 180.00

2.4 To supply labour & demolish existing toilet accessories & sanitary ware at

both toilet $ 120.00

2.5 To supply labour & remove existing vanity at master toilet $ 80.00

2.6 To supply labour & remove existing kitchen cabinet with disposal by M.O.E

regulation $ 220.00

2.7 To supply labour & remove wardrobe at master room with disposal by

M.O.E regulation $ 150.00

2.8 To supply labour & wooden partition at foyer with disposal by M.O.E

regulation : $ 120.00

SUB-TOTAL $ 1,280.00

3.0 MISCELLANEOUS WORKS

3.1 To supply & paint of wall & ceiling for whole house include all expose

piping ( matex paint ) $ 1,400.00

3.2 To supply & vanish existing 4 set door & door frame $ 320.00

3.3 To supply & vanish existing 2 set sliding door & door frame $ 300.00

3.4 To supply & vanish existing 1 set bi-fold door & door frame $ 120.00

3.5 To supply & vanish existing 3 pcs wood plank at window bay $ 240.00

3.6 To apply for skip tank permit $ 150.00

3.7 To haulage material to unit c/w debris disposal $ 350.00

3.8 To supply labour for general cleaning whole house include acid cleaning

for floor, wall & window $ 250.00

3.9 To supply & plaster kitchen wall with Alturas hard $ 750.00

SUB-TOTAL : $ 3,880.00

4.0 PARQUET WORKS

4.1 To suppply & revanish existing parquet flooring for 3 bed room $ 430.00

SUB-TOTAL : $ 430.005.0

PLUMBING WORKS

5.1 To supply labour to joint in/out let pipe for kitchen sink $ 150.00

5.2 To supply labour & install 01 no wash basin at master toilet c/w lever tap $ 60.00

5.3 To supply labour & install 01 no wash basin at common toilet c/w lever tap $ 60.00

5.4 To supply labour & install 01 no sitting bowl c/w flashing tank at master

toilet $ 120.00

5.5 To supply labour & install 01 no sitting bowl c/w flashing tank at common

toilet $ 120.00

5.6 To provide labour to install toilet accessories at master toilet $ 40.00

5.7 To provide labour to install toilet accessories at common toilet $ 40.00

SUB-TOTAL : $ 590.00

6.0 MASONRY WORKS

6.1 To supply & lay matt finish homogenous tile for kitchen ( tile up to $2.80

psf ) $ 900.00

6.2 To supply & lay matt finish homogenous tile for yard ( tile up to $2.80 psf ) $ 550.00

6.3 To supply & lay matt finish homogenous tile for common toilet ( tile up to

$2.80 psf ) $ 550.00

6.4 To supply & apply water proofing membrane for kitchen & commn toilet

flooring $ 180.00

6.5 To supply & construct 50mm cabinet base with tile skirting $ 280.00

6.6 To supply & construct shower curb at common toilet with tile finish $ 80.00

6.7 To supply & construct sink support with hollow block & 60x60 polish

homogenous tile finish $ 850.00

SUB-TOTAL : $ 3,390.007.0

CARPENTRY WORKS ****

7.1 To supply & fabricate 6 ft designed TV consol with laminate finish $ 660.00

SUB-TOTAL : $ 660.008.0

CARPENTRY WORKS AT MASTER BEDROOM

8.1 To supply & alter existing wardrobe c/w new cabinet & laminate finish $ 750.00

8.2 To supply & fabricate king size bed c/w pull out drawer & laminate finish $ 1,000.00

8.3 To supply & fabricate 2 set wall mounded 2.5 ft shelf c/w laminate finish $ 200.00

8.4 To supply & fabricate 2.5 ft designed full high wardrobe c/w glass swing

door aluminium frame & laminate finish $ 625.00

8.5 To supply & fabricate 4.5 ft designed suspened study table c/w laminate

finish $ 540.00

SUB-TOTAL : $ 3,115.009.0

CARPENTRY WORKS AT STUDY ROOM

9.1 To supply & fabricate 9.5 ft designed full high walk in wardrobe with colour

polyester board $ 2,090.00

9.2 To supply & fabricate 3 ft suspended drassing table with laminate finish $ 300.00

9.3 To supply & install 1 pc 3 x 6 ft mirror for drassing table $ 180.00

SUB-TOTAL : $ 2,570.0010.0

CARPENTRY WORKS AT KITCHEN

10.1 To supply & fabricate 32 ft solid plywood kitchen cabinet c/w laminate

finish, 2 glass door, 4 drawer, 1 cutlery tray & 1 stainless steel dish tray $ 3,200.00

10.2 To supply & install 18 ft solid INDIA granite work top with 3 inch profile $ 1,800.00

10.3 To supply & install L-shape glass backing at cabinet area $ 750.00

10.4 To supply & fabricate 3 pcs cabinet door at support c/w laminate $ 285.00

SUB-TOTAL : $ 6,035.00

11.0 CARPENTRY WORKS AT MASTER TOILET

11.1 To supply & fabricate 3 ft suspended vanity cabinet c/w glass door

aluminium frame & laminate finish $ 390.00

11.2 To supply & install 3 ft INDIA granite work top c/w 2 inch profile $ 300.00

SUB-TOTAL : $ 690.0012.0 CARPENTRY WORKS AT COMMON TOILET

12.1 To supply & fabricate 3 ft top hung store cabinet with laminate finish $ 330.00

SUB-TOTAL : $ 330.0013.0

GLASS WORKS

13.1 To supply & change 6 mm tick glass at yard door with clear finish $ 250.00

13.2 To supply & change 6 mm tick glass at yard window with clear finish $ 160.00

13.3 To supply & install 10mm tick tampered glass shower screen at common

toilet c/w swing door $ 750.00

SUB-TOTAL : $ 1,160.0014.0

MARBLE WORKS

14.1 To supply & repolish existing marble flooring **** & dinning $ 691.20

14.2 To supply & repolish existing marble flooring at master toilet $ 180.00

14.3 To supply & wax existing marble wall tile at master toilet $ 80.00

SUB-TOTAL : $ 951.2015.0

WIRING WORKS

15.1 To supply labour to install 2 light at foyer $ 24.00

15.2 To supply labour to install 1 light at study $ 12.00

15.3 To supply labour to install ceiling fan at room 2 $ 45.00

15.4 To supply labour to install 1 light at master room $ 12.00

15.5 To supply labour to install ceiling fan at master room $ 45.00

15.6 To supply & relocate 1 double point at study ( conceal ) $ 100.00

15.7 To supply labour to run double point at master room $ 75.00

15.8 To supply labour to run SCV point at master room : $ 95.00

SUB-TOTAL $ 408.00

GRAND TOTAL :

$ 25,489.20

Final Price is $25k Nett after 'discount'......

Edited by sng28
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×