Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

First Resale Home@bedok Reservoir Road

Featured Replies

Thks. Yes the more rush u have the more errors and prcier. As I just need basic renovation, no design in place just my ideas here and there. Probably u need to move in soon,I guess a 3 room flat need 3 to 4 weeks at least for complete reno. U have to be ard to make sure they do what u expect or u can trust the ID. No experience with rainshower as I didnt use it and not installing. Your stuffs bought is place inside the new house? Not sure this will obstruct the works.

Thats right i'm in a rush to move in as i'm staying at a rented place. Before i sign the dotted line i ask 2 ID's and both are willing to take the job and both gave the same answer that it will be the kitchen last to complete. I fully understand as the time frame is short. As of now he's left with 20 more days before i can move in temporary. Most of the bathroom stuff will be sent on 7 Dec and lighting will be on the 10th dec. Crossing my fingers that all will go well this week.

  • Author

Thats right i'm in a rush to move in as i'm staying at a rented place. Before i sign the dotted line i ask 2 ID's and both are willing to take the job and both gave the same answer that it will be the kitchen last to complete. I fully understand as the time frame is short. As of now he's left with 20 more days before i can move in temporary. Most of the bathroom stuff will be sent on 7 Dec and lighting will be on the 10th dec. Crossing my fingers that all will go well this week.

My work slowed down no difference since last Saturday. Only 1 tiling worker i/o 2 probably they have multiple jobs at a time. He said can complete 2 weeks to 3 weeks now I doubt so. Good luck my friend, wheres your new flat at, later I check your blog.

My work slowed down no difference since last Saturday. Only 1 tiling worker i/o 2 probably they have multiple jobs at a time. He said can complete 2 weeks to 3 weeks now I doubt so. Good luck my friend, wheres your new flat at, later I check your blog.

Ic, All the best to you and everyone undergoing reno now. Gonna pop by again to see what had been done later. Mine is at Hougang.

  • Author

After 1 week+, kitchen wall tiles are in progress

pc062469.jpg

Edited by limbj

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.