sonic84 0 Report post Posted June 30, 2015 (edited) Hi all, I have just collected my keys 2 weeks ago and having no experience in renovation, would like to ask if the following quotation is reasonable? Please highlight which items are overpriced if possible. Thanks in advance! ADDITIONAL WORKSDEMOLITION WORKS Unit Amount TotalHack off 5.5 ft half wall at kitchen------------------------------------------------------------------------------------------------------------------------- $250 MASONRY WORKS (tiles at $3.5 or below)Supply and construct kitchen cabinet base with side tile finishing ------------------------------------------------------------------------------- $450Supply and lay 600 x 600 homogenous floor tile for living, dining, corridor walkway ---------------345-----------------7-----------------$2,415.00Supply and lay 100% waterproof vinyl flooring for master room (cement screed by HDB) -------184-----------------5.5---------------$1,012.00Supply and lay 100% waterproof vinyl flooring for bedroom 2 (cement screed by HDB) ---- -----121-----------------5.5---------------$665.50Supply and lay 100% waterproof vinyl flooring for bedroom 3 (cement screed by HDB) ----------117-----------------5.5---------------$643.50Supply and install 4" parquet skirting for living, dining, corridor, bedroom 2, bedroom 3----------199-----------------5.5---------------$1,094.50Supply and apply 3 in 1 prepack cement screed for whole house (hdb required) -------------------------------------------------------------$1,035.00Touch up and make good kitchen hacked wall (plaster and replace affected tile)-------------------------------------------------------------$280.00 CARPENTRY WORKS (solid plywood with internal white PVC, BLUM hinge included) KitchenDesign and fabricate 7 ft kitchen top cabinet in laminate finish---------------------------------------------7-------------------120---------------$840Design and fabricate 12 ft kitchen bottom cabinet in laminate finish (both side)----------------------12-------------------120---------------$1,440.00Supply and install 12 ft crystal quartz top with backsplash----------------------------------------------- --12------------------120---------------$1,440.00Supply and install tempered glass backing in between kitchen cabinet---------------------------------------------------------------------------$450.00Design and fabricate 2 ft tall unit in laminate finish-----------------------------------------------------------------------------------------------------$720.00 LivingDesign and fabricate 10 ft full height tv feature wall in laminate finish (partial glass finish)---------10--------------------350-------------$3,500.00Design and fabricate 8 ft suspended tv console in laminate finish-----------------------------------------8---------------------130-------------$1,040.00Design and fabricate 3 ft full height shoe cabinet in laminate finish----------------------------------------3---------------------260-------------$780.00Design and fabricate 3 ft full height glass display unit---------------------------------------------------------3---------------------450-------------$1,350.00Supply and install STACO wall panel **** area (brick type)-------------------------------------------------------------------------------------------$1,850.00Supply and install full height clear mirror at dining area------------------------------------------------------------------------------------------------$480.00 Master BedroomDesign and fabricate 11 ft full height L-shaped casement wardrobe in laminate finish---------------11--------------------280-------------$3,080.00 : with internal small dressing tableDesign and fabricate 5 ft full height simple tv feature wall in laminate finish (with cove holder)-----5---------------------180-------------$900.00Design and fabricate 5 ft suspended tv console in laminate finish------------------------------------------5---------------------130--------------$650.00 Bedroom 2Design and fabricate 5 ft full height casement wardrobe in laminate finish-------------------------------5----------------------240-------------$1,200.00 PLUMBING WORKSSupply and modify hot & cold water pipe for city gas heater at service yard-----------------------------------------------------------------------$180.00Supply labour to install 1 nos kitchen sink and tap--------------------------------------------------------------------------------------------------------$120.00Supply labour to install toilet accessories for both toilet --------------------------------------------------------------------------------------------------FOC ALUMINIUM / GLASS WORKSSupply and install aluminium 3 tracks sliding window at service yard-------------------------------------------------------------------------------$620.00Supply and install AUSTSCREEN BUMPFREE tempered sliding shower screen for master bathroom-----------------------------------$640.00Supply and install AUSTSCREEN BUMPFREE tempered sliding shower screen for common bathroom---------------------------------$640.00 CEILING WORKSSupply and construct 450mm L-Box with cove light holder for living area--------------------------------------------------------------------------$550.00Supply and construct false ceiling for dining area---------------------------------------------------------------------------------------------------------$520.00Supply and box up aircon trunking at corridor walkway--------------------------------------------------------------------------------------------------KIV PAINTING WORKSSupply and paint whole house wall with Nippon Vinilex 5000 (4 colors +1 standard ceiling white)------------------------------------------$1,200.00 GENERAL WORKSSupply haulage and clear whole house debris------------------------------------------------------------------------------------------------------------$450.00Supply and lay cardboard for floor protection--------------------------------------------------------------------------------------------------------------$300.00Acid washing upon completion (2 times)--------------------------------------------------------------------------------------------------------------------$300.00 TOTAL : 33,085.50 Edited July 1, 2015 by sonic84 Share this post Link to post Share on other sites