Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
euph5

Is This Quote Reasonable? Thank You Very Much For Your Advice

Recommended Posts

Dear all, would like to get your opinions about this quote below. Many thanks for your help! Not sure how to make the picture show on the thread, but I've attached the links to the pic of the quote. Thanks again.

Professional Service

Interior design & space planning layout

Consultation & selection of home furnishing

Artiste impressions 3D visuals

Job site co-ordination & supervision

Decoration advise

Floor protection sheet

Apply for HDB renovation permit

Bathroom

1 Supply labour and equipment to hack and dismantle existing vanity $120.00

2 Supply labour and equipment to hack and demolish existing wall tiles $650.00

3 Supply labour and equipment to hack and demolish existing floor tiles $300.00

4 Supply labour and equipment to hack and demolish existing false ceiling $120.00

5 Supply labour and material to lay water proof membrane up to requirement $180.00

6 Supply labour and material to lay full height wall tiles with tile price below $3.20psf $1,650.00

7 Supply labour and material to lay anti-slip floor tiles with tile price below $3.20psf $750.00

8 Design and fabricate 4ft vanity cabinet in solid plywood laminater finishing c/w I-Quartz table top $980.00

9 Supply labour and material to rerun conceal copper piping bathroom only (include dismantle existing piping) $900.00

10 Supply labour only to install 1pc basin,1set accessories,1pc biget spray and 1set mixer $320.00

11 Supply labour only to install 1set wall mount toilet bowl c/w construct half height wall with tiles finishing $550.00

12 Supply labour only to install bathtub include inlet and outlet piping $750.00

13 Supply labour and material to construct wall to support bathtub and steps with tiles finishing $650.00

14 Supply labour and material to construct false ceiling for bathroom only $350.00

15 Supply labour and material to install aluminium PD-Door c/w dismantle existing door $520.00

Living , Study area and Kitchen

16 Supply labour and equipment to hack and demolish existing kitchen cabinet $380.00

17 Supply labour and equipment to hack and demolish existing island cabinet $180.00

18 Supply labour and equipment to hack and demolish existing floor tiles $980.00

19 Supply labour and equipment to hack and demolish existing tile skirting $150.00

20 Supply labour and equipment to hack and dismantle existing full height feature wall and doors $550.00

21 Supply labour and material to construct mortar base for kitchen cabinet $250.00

22 Supply labour and material to construct mortar base for washing machine and fridge $350.00

23 Design and fabircate 24ft top and bottom kitchen cabinet in solid plywood laminate finsihing $2,900.00

24 Supply labour and material to install 10ft I-quartz (single profile)table top for kitchen cabinet $1,200.00

25 Supply labour and material to install anti-slam hinges for all cabinet door $150.00

26 Supply and install stainless steel dish tray c/w sand blasted glass Bhum System door $320.00

27 Supply labour only to install sink and cooker hood and hob $200.00

28 Design and fabircate 4ft dining table in solid plywood laminate finishing $680.00

29 Supply labour and material to install 8ft I-quartz (single profile)table top for dining table $960.00

30 Supply labour and material to lay floor tiles with tiles prices below $3.50psf $2,900.00

31 Supply labour and material to lay tiles skirting $350.00

32 Design and fabircate 2.5ft full height book shelve cabinet in solid plywood laminate finsihing $600.00

33 Design and fabircate 8ft study table in solid plywood laminate finishing $1,280.00

34 Supply labour and material to install tempered glass table top for study table $300.00

35 Supply labour and material to construct 17ft full height gypsum board partition c/w door way $1,300.00

36 Supply labour and material to install sound proof rock wood in partition wall $300.00

37 Supply labour and material to install 1pc solid nyatoh wood door frame $250.00

38 Supply labour and material to install 1pc solid veneer door $400.00

39 Design and fabricate 5ft full height display and storage cabinet in solid plywood laminate finsihing $1,500.00

40 Design and fabricate 7ft Tv-console in solid plywood laminte finishing $1,050.00

41 Supply labour and material to install 7ft Marble table top for Tv-console $840.00

Bedroom

42 Supply labour and equipment to hack and demolish existing floor tiles $650.00

43 Supply labour and equipment to hack and demolish existing tile skirting $120.00

44 Supply labour and material to lay floor tiles with tiles price below $3.50psf $1,600.00

45 Supply labour and material to lay tiles skirting $120.00

46 Design and fabricate 4ft full height swing door wardrobe in solid plywood laminate finishing $1,280.00

47 Design and fabricate 2nos bed side table in solid plywood laminate finishing $700.00

Balcony

48 Supply labour and material to lay floor tiles with tiles price below $3.50psf $1,180.00

49 Supply labour and material to lay tiles skirting only $80.00

Misc.

50 Supply labour and only to remove existing 1 unit airconditional and install after $300.00

51 Supply labour only to relocate existing airconditional compressor include bracket $650.00

52 Supply labour and material to paint all interior walls and ceiling in Nippon 5000 paints (4+1color) $1,480.00

53 Haulages service , clear debris and sand supply $650.00

54 Supply labour and material to chemical wash after renovation works $250.00

https://www.dropbox.com/s/kee0r06pcv8idwk/Reno%20quote%201.PNG?dl=0

https://www.dropbox.com/s/tlz5mjgzqs95jrq/Reno%20quote%202.PNG?dl=0

https://www.dropbox.com/s/lpj2sc4nsjcenj3/Reno%20quote%203.PNG?dl=0

Reno%20quote%201.PNG?dl=0

Reno%20quote%202.PNG?dl=0

Reno%20quote%203.PNG?dl=0

Edited by euph5
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Hello, just wanted to share my renovation experience. Going through the process has been a real eye-opener for my husband and I. The short-listing process, the design process, the material selection process ... it really got quite tiring after a while.

But thank God for our ID - who also has real hands-on construction experience - who is helping us to achieve our dream home step-by-step. As I am still half-way in the process, I can't comment on the carpentry work. But if you are looking for a responsible and meticulous ID, I think you can give my ID a try. His tiling work stunned us ... I'm not sure how long it usually takes to complete the tiling process ... but ours took a good three to four days. I was really happy with the result when I saw how seamlessly the tiles were placed. We have just completed our ceiling and we are equally impressed!

I will say upfront that my ID's quote is not the cheapest in the market, and he does not offer freebies. We actually picked him over three other cheaper quotes as we value his workmanship and his integrity (especially on the tiles as I have seen my friend's tiles exploded)! One of the little things he did was to cover our tiles and front door and room doors with loads of 'no smoking' reminders all over.

All in all, my renovation process has been exciting yet peaceful. If you will like to meet my ID, you can PM me.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×