Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ocheeeng

Members
  • Content Count

    303
  • Joined

  • Last visited

Everything posted by ocheeeng

  1. Angel81, The surrounding areas of Yew Tee MRT have changed quite a bit. Now got YewTee Point. YewTee Shopping Centre has also expanded (got a new cafe and also McCafe). The MRT station itself have 2 foodcourts.
  2. Some of the custom procedures that we have gone through: Kai men (open door after collecting keys): Mix rice (uncooked), salt and tea leaves. Just throw the mixture at the main door and say some good words before opening. Kai gong (to signify start of renovation): Bring a hammer tied with red string and knock 3 times at the place suggested by the fengshui master. Then the contractor can start any date/time after that. Simple, short and sweet
  3. Contract with ID or rather contractor: Master bedroom a. Supply labour & material to install plaster board light pelmet with curtain groove line (90sqft) b. Supply labour & material to fabricate window storage cabinet with solid ply wood, veneer finish with lift top c/w heavy duty hydraulic piston lift suport c/w build in console player (2950mm - cannot do after site visit because it will greatly reduce walking space ) (Likely will do a revised contract for this after finalising design) c. Supply labour & material to install dresser cabinet with solid ply wood, high pressure laminates, & strip mirror with extra fix door panel next to it (cabinet: 600mm(W)x250mm(D)x2500mm(H)) Study room a. Supply labour & material to install work station with set table in solid ply wood, high pressure laminatess & ABS edging c/w top cabinet in solid ply wood, high pressure laminate & glass door with aluminium frame (3600mm - overquoted by double after site visit ) (Likely will do a revised contract for this after finalising design) b. Supply labour & material to install window ledge in solid ply wood & veneer finish c/w extension of ledge cum cabinet (extension: 450mm, total ledge length:1600mm) Living room a. Supply labour & material to fabricate suspended shoes cabinet at foyer area with solid ply wood, high pressure laminate & ABS trimming (900mm(W) x 300mm(D) x 900mm(H)) x 2 set (Likely will do a revised contract for this after finalising design) b. Supply labour & material to fabricate TV wall feature **** room 1) 1500mm x 100mm laminate wall feature with stainless steel inlay 2) 600mm x 2700mm x 5mm wall paper 3) 1500mm x 300mm x 2500mm TV console in solid ply wood, high pressure laminate & flip down glass door (Likely will do a revised contract for this after finalising design) (Depth of TV console seems too short to accommodate players) c. Supply labour & material to install outdoor timber platform in chengai & varnish finish at outdoor to level up planter area d. Supply labour & material to install false ceiling **** room area with plaster board & MS stel support finishing e. Supply labour & material to install light pelmet at dining area with plaster board finish (Likely will do a revised contract for this after finalising design) Guest bedroom a. Supply labour & material to install window ledge in solid ply wood & veneer finish Mscellaneous a. Supply labour & material to paint whole house wall & ceiling (ICI: wash & wear, light & space, 3 in 1) (Nippon: 9000 series or odorless) b. Supply labour & material to install timber curtain at guest bedroom and studyroom in solid ply wood & veneer finish
  4. Fengshui master said my element is strong GOLD and my wife's is strong WOOD. Green will be good for us
  5. Thanks for the grats. It is a new condo in Yew Tee. I saw many units have already moved in or started renovation. I signed my ID or contractor on 3 Mar 09 and now still discussing the designs
  6. Wall color themes given by Fengshui master: Foyer: green Dining: green Living: green Guest toilet: green Guest bedroom: blue Master bedroom: blue or pink or purple or wood or red Study room: blue Utility room: green Guess it will be a green green house...
  7. Studyroom Will do study table Guestroom Probably will convert to relax/ironing/general purpose room
  8. Master bedroom Strong afternoon sun (need solar film) Will construct storage with resting area on bay window Wardrobe Just enough for my wife's stuff...mine will be in other rooms
  9. Guest toilet (Fengshui master said this area must have green color...hmmm..any suggestions?) Masterbedroom toilet (Note the full-height frosted window at the shower area...I think outside can see clear shadows at night) (Need to do something about it...hmmm...maybe put up a shower curtain to block)
  10. Supplied kitchen cabinets with cooker hob, hood and oven (my wife and I don't cook anyway ) Kitchen sink (got sound when running water because of the flat shape) Nothing much to do here except to install lights
  11. Living room (intended to construct feature walll and tv console here): Planter **** room (intended to level with chengai deck here):
  12. Rest of our place in raw or given state: Foyer (intended to construct shoe cabinets here): Dining area viewed from foyer (intended to construct display cabinets here): Dining area viewed from living room:
  13. Yard grill (just installed today) with my laundry pole holder in the foreground and my neighbour's expensive laundry system in the background My laundry pole holder (40 bucks ) (Installation FOC because I asked the gate/grill contractor to install for me )
  14. Main door Main door with wrought iron gate installed this morning
  15. Nope. MBR, guest room and living room windows facing a road and flats across the road The little room (intended to use a study/computer room) can see the children pool.
  16. This morning, just installed main door gate and yard grill. Tomorrow should be the date defect rectification complete. This Saturday, putting up solar film as master bedroom, bedroom 2 and living room all have strong afternoon sun.
  17. Collected our keys on 12 Feb 09. The floorplan: Floor area: 108sqm. The bay windows and planter took up some space.
  18. Hi Jaskel, Can I have the carpenter's contact? Any pics to share? Thanks!
  19. One more option for bay window will be solid wood top. I am also doing bay windows for my new residence. Still deciding between veneer, granite or solid wood top as my area affected has afternoon sun. Laminate will be out.
  20. Need the old style If a smaller part is used, I need to touch up the door.
  21. Hi, Where to buy magnetic door holder shown in the image? Thanks
×