Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Tiler Seng

Verified Merchant
  • Joined

  • Last visited

Everything posted by Tiler Seng

  1. Break it and buy a new one to cover it it could have bite by some chemical before.
  2. deposit is a standard practice it same goes to others like buying a car or order on line, request is a right word to say, but if you say they threaten....well it happening to our line also, there's a famous floor supplier that even wanted me to pay in full before they even delivery their materials...what should i say? is either dont go with them or L L pay them for consumers who don't pay swee swee, contractor / ID still can opt for bank loan...? who will pay for the interest? but if ID / contractors took the money without delivering anything? i am facing the same as mentioned about that famous floor supplier, just go to CID or CASE then.
  3. Update the missing Kitchen photos SileStone work top, BLUM baskets & products, colour glass backing are being used in this kitchen:
  4. is the same thing, owner should paid up swee swee, hold only when job is not complete. if they want to start renovation, they should be we prepared on their cash flow problem too. it needs two hands to clap.
  5. The problem is, who should be the one paying fee to the bank & CASE? they do not want to do it for free, unless our PM can release fund to support this idea
  6. it is definitely helpful cause i do have quite a few case where my owner are avoiding us after job completion, and of coz the standard way is to find lot of trouble for first as their weapon, until they have no more chance, avoiding is their next Technic to delay payment If the fund are already in placed, there will have lesser avoiding game
  7. We have done overlaying of wall & floor tiles in both Bathrooms- Shower Screen, Rain Shower, Vanity with Silestone top, mirror with No compromise Common Bath Master Bath Master Bedroom Sorry i'll have to retake the metallic Black KItchen with Silestone top, Blum product are fully used, think it will be better during day light, will update the KItchen photo later
  8. Finally found a chance to take picture for this BTO after so long. We have successfully avoided the prepack screeding right before June and have some saving to spend on other stuff
  9. Cement screeding is not needed for overlaying
  10. If you are puzzling about where to engage a right & sincere designer for your house, i will recommend this young & creative designer to you, well, not me, definitely is someone who are younger
  11. the combination are more to grey tone & warmly lighting are highly recommended for new owner who like industrial design & yet resulting the High-end look
  12. Happy photo shooting today together with a impressive id whom is a friend of the owner, he helped him to design this 2 bedroom's condo and engaged us to complete the dream home for him. See the end result
  13. Hi! why don't you consider SileStone? http://silestone.com.sg it contain anti-bacterial coating basic price from $170pfr?
  14. paisey.... Afterall, HDB is trying to get away sand supply to all HDB flat so that it wouldn't stacked their lift and also to keep environment echo clean. Prepacked has already been use on wet area by all HDB licensed contractor, after June, even dry area are to be use, so this is where the high cost come in. Owners are being very confuse by all the non-standardize price by the contractors, while some contractor also quite smart, they ask owner to buy themselves if owner don't believe their price, problem is what happen next if short of materials or left over? and who will pay for the additional delivery cost? there's nothing wrong with overlaying, only worry is what happen if the existing layer of tile popped? Hope my reply is helpful
  15. not really...that Peter is more suey that kana me his time has come
  16. There are many cheater in this industry, my recent case was by a guy named Peter who claimed himself as an Son-in-law of a grand-lady, which he was helping her for renovation but of coz the old lady will be the payer, after a 3 x bounched cheque by him we have already done up 70-80% of the house renovation, end up then we found out that he is actually a renovation contractor of that grand-lady, he has received $36K from her already and we are not the only contractor he engaged, there are some other items that were not in our contract such as AC & tiles purchased which i heard that they have also received Bounched cheque from him or whichever. This Case is now under investigation, nevertheless i would like to ask, if there is any victim to my case please contact me immediately.
  17. if the carpenter are unable to advise you a right configuration what is the point for paying without getting a right Kitchen cabinet? Designer House provide free consultation & sketch for Kitchen that suit your need, optional choice of colour/ system & precise calculation" 2D drawings for size, 3D drawings for colour to let you understand the final result are given to you free before product fabrication" Contact us at enquiry@designerhouse.com.sg Phone: 64811101

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.