Everything posted by metalbone
-
Our Mb Home @ Pioneer
New bedroom door KDK fans which I bought from JB
-
Our Mb Home @ Pioneer
So long haven't update my blog. Today is the Reno day 27. Things done for the past 2 weeks - Rubbish cleared - False ceiling up - All Aircons up - Painting all done except some minor touchup - Bedroom doors installed - Main door lock changed but still need alignment - Bomb shelter door repaired (3rd party contractor) Living hall Study Room Guest Room MBR
-
High End Kdk Ceiling Fans - Best Price Where?
I bought the k11z1-es in msia for RM350
-
High End Kdk Ceiling Fans - Best Price Where?
I have PM u
-
High End Kdk Ceiling Fans - Best Price Where?
I bought this KDK k15z9 60" ceiling fan from JB. Almost half price compared to SG.
-
Toilet Accessories
We bought my bathroom accessories from Irene of Heritage Bathroom Gallery Pte Ltd. She is friendly, good and patient. We spent almost 3 hours there! lol
-
Our Mb Home @ Pioneer
MBR toilet Shower head and mixer Close up of the mixer Toilet bowl
-
Our Mb Home @ Pioneer
Reno Day 17 Joven 35L storage heater installed at the common toilet Basin and toilet bowl Otto mercury toilet bowl Shower head and mixer Shower head
-
Our Mb Home @ Pioneer
Our bathroom accessories arrived today! One thing to ask: Will it possible to install the basin, toilet bowl first before installing the bathroom accessories (mixer, shower set, tap) after the acid cleaning cos the lady who sold us the accessories told us that some contractor did not properly protect the accessories during acid cleaning and the accessories rust within a month.
-
Our Mb Home @ Pioneer
Yup looks like a lot of JWs. Currently 2 units below us are having renovation too!
-
Our Mb Home @ Pioneer
Reno Day 11 Our "HUNG" window change to sliding window Washing machine base with drainage cover closed Washing machine base with drainage cover open
-
Our Mb Home @ Pioneer
ya the owners themselves have some issues but the lady owner was quite friendly to us and my parents on the 2nd visit. I have PM u the issues the owners are having. Also we manage to negotiate the COV down, thus we made the decision to buy in less than a week. Luckily for us, no major issues when signing the OTP and 1st/2nd appt. Lucky u didn't get it leh else we might end up homeless loh
-
Our Mb Home @ Pioneer
U are not too late. I only started this blog yest. Yes we have the same contractor! We selected our tiles at Hupfari. The kitchen tiles are white with diamond shape, not so obvious when closeup.
-
Our Mb Home @ Pioneer
Ya we love this unit the moment we step in. Any reason why u didn't get it last time?
-
Our Mb Home @ Pioneer
Reno Day 10: Tiles near the bomb shelter/storeroom are done. Currently laying tiles at window ledge
-
Our Mb Home @ Pioneer
Mine is also 65X series.
-
Our Mb Home @ Pioneer
oops..forgot to add. U can check the post 1 for the floor plan.
-
Our Mb Home @ Pioneer
Thanks. We are also happy with the tiling works. Hopefully the carpentry and other stuff are also good.
-
Our Mb Home @ Pioneer
Nice to have a Jurong Wester here. Mine is also St 61.
-
Our Mb Home @ Pioneer
Yup I stay opposite the stadium.
-
Our Mb Home @ Pioneer
Our Joven electric storage water heater and Ariston hob arrived last sat:
-
Our Mb Home @ Pioneer
Our MBR: Look very small hor? We wanted to buy a king size bed but then the walking space will be even smaller.
-
Our Mb Home @ Pioneer
Our MBR toilet:
-
Our Mb Home @ Pioneer
Our common toilet:
-
Our Mb Home @ Pioneer
Reno Day 9 The past few days was the tiling works. Currently almost all tiles are done. Our Kitchen 3/4 wall behind sink Base to put our washing machine and dryer