  1. Yup, mine also will be the same, ie plastering-pipings/wirings-painting-installation.
  2. Actually, I thot painting shld come first before installation of all the 'gadgets'?
  3. Living room floor tiles & kitchen wall tilings done. MBR in progress. Kitchen flooring yet to do.
  4. Wah.. Quiet quiet got craftstone brickwall lor.. Haha.. Thumbsup!!
  5. See? The more we shld hv it at ur place. Haha.. Tink the rest of the guys wld agree in totality wif me.. Kekeke..
  6. CNY regardless go urs, remylebeau or haidechen hse also can play mj.. On 2nd thots, go ur hse better.. can also hv food to eat.. Haha..
  7. Ur contractor/ID will hv a set of various window glasses for u to choose frm. Need not worry..
  8. Reno will be completed by mid-Jan. By the time I moved in will be CNY. By the time I'm free, will be aft CNY..
  9. House warning dun hv. House warming can Aft CNY bah..
  10. Hi, Nope it's not blue tinted. Can't rem the actual type but tink it's something like tea tint or light tint.
  11. U forgot my storeroom I hacked away to enlarge my MBR ah?
  12. Well, bedroom still ok lor. At least still slightly bigger than typical 3-room's MBR lor. Kekeke...
  13. I'm not the first one to do combined toilet The sink will be at the common toilet, juz aft the entrance. I'll be using PD door for the common toilet, opening outwards so dat the door will not block the sink. As for my MBR toilet, it'll only be used purely as shower area. A glass door will be used as entrance frm the MBR. One impt thing to note: pl check wif the plumber on whether there's any issue wif the re-routing of pipes/air vents (if there's any in-between the walls.
  14. The worst feeling, is being forgotten about, by someone you will never forsake...

  15. Oh ya, the portion beside ur main door, rite? Datz RC beam, cant be hacked
  16. My living room vy big wor... Whahahahha...
  17. Wah.. pics so obvious but yet nw then u realised.. ~shake head~ Hahaha... Ya,hacked off the living room/common bedroom to widen the living room. The storeroom was also hacked to combine the space into the MBR. No walk-in wardrobe. Juz a typical L-shape wardrobe combined wif a study desk.
  18. Interim updates: Works were slightly delayed last few days cos of overloaded year-end projects by the contractors. Nonetheless, full steam ahead from today onwards as priorities has been set forth for my hse. Within the next two weeks, flooring will be completed, followed by plastering. Already confirmed aircon positionings today and electrical wirings & power/lighting points will commence on the 3rd week. Still on schedule to handover the hse by mid-Jan. Draft sketch of MBR:
  19. I be kopiboy lor... u all carry on play. I dun 'chup ji kah' then.. Lol
  20. Toilet wall tiles : Flooring will be next. Once done, plastering/painting/electrical wirings will kicks in
  21. Wall tilings are almost done.. Kitchen:
×