Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ZzzMonster

Members
  • Content Count

    344
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by ZzzMonster

  1. When I went over after lunch, the plumber has left. Whereas the rest, electricians and carpenters are very busy, so didn't take too much pics. I seems to be in their way whenever I try to take some pics... Bathroom sinks are up. The Quartz guys will come back and install the backsplash... Plumber also install other fixtures.... I changed my shower which the developer gave to something better. Hope I can enjoy the shower experience soon... I also like this towel rack. Each time I see it in the hotel, I tell myself I also want it to be installed for my home
  2. ID told me that today was a busy day, especially the morning. At one point of time, there are 3 different parties, plumber, electricians and carpenters. She said very chaotic....
  3. Sorry to hear about your bad experience. Hope all is well now with your current contractor.
  4. Since the carpentry is finishing, ID activated the electrician to start fixing up lights and fans... I especially like these sets of black frame lights on grey false ceiling
  5. In my earlier post, the bed frame for the master bed room is done wrongly, too low and storage space not high enuf. Today, the bed frame is taken out... The new frame has been brought in today, the carpenter said will install tomorrow The Quartz for both bathroom vanity top has been installed, next step will be installation of the sink
  6. More updates.... Study and wardrobe room took quite some time, maybe it's more complex, but glad that it's shaping up well, about 80% completed We like the laminate for the study table 😎
  7. TV room also almost completed, left doors Can you see the Vento Fino fan at the corner? Like it very much. Here's the close up
  8. When down today, carpentry is almost completed.... Probably another 1 to 2 more days? Shoe cabinet and TV area cabinets about 90% completed, left doors Haiku fan also fixed up. Isn't it pretty? Dining area cabinet also left doors, about 90%
  9. Yes, I need lots of storage space as well.... After staying in my current home for more than 10 years, I've accumulated lots of stuff. Despite throwing away some stuff, still got lots more 😅 I even find space in the yard to build cabinet...
  10. TV room cabinet and feature wall 1/2 done Wardrobe has started 1/4 done
  11. ID sent this pic to me this morning... Shoe cabinet almost done When I went later part in the afternoon, TV console is also up
  12. Update from yesterday's carpentry issue... ID sent plumber to remove the tap, the hole will be sealed by the carpenter
  13. In any reno, needs to give some allowance for delay. There sometimes can have unforeseen issues...
  14. Yard cabinet 1/2 done But upon closer look, the tap has not been taken out yet. And the carpenters simply cut a hole in the cabinet to fit it in.... I text ID on this also, and she said will get it fixed. Anyway, issues like this is expected in a renovation. Most importantly, it boils down to the willingness of the ID to rectify it. Till date, I'm happy that my ID agrees to fix these issues. Will update when it has been fixed.
  15. Master bedroom bed head and queen size storage bed frame. I was happy initially when I saw this, but upon closer look, I noticed that the storage height is too low. How to put things? So I immediately text ID and complain. After checking and discussion with her, she will redo it. I'm happy that ID is willing to take the responsibility and change it. Apart from the storage height, I like the feel of it. This pic will show that the height of the storage is too low
  16. When today to take a look at the carpentry. Some stuff are done. Some of the things IMO not done well, I immediately made known to ID. To her credit, she said that she will get it fixed. Will update on it when it's fixed. Entrance shoe cabinet, 1/3 done Dining area cabinet, 1/2 done Vanity cabinet at both bathrooms mounted up so that measurements can be taken for Quartz top
  17. Hi Khng, here's some pics. Hope it helps. When the hood is being pulled out From the cabinet above the hood The top of this pic seems to be the vent for the hood if I'm not wrong
  18. Thanks! I'm at the carpentry stage. Yesterday, the carpenters brought the stuff over, they will start installation from today till maybe mid next week.
×