Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Martin Sin

Members
  • Joined

  • Last visited

Everything posted by Martin Sin

  1. Same day... Both toilet doors make way for my PD door...
  2. Same day toilet accessories were also installed... MBR toilet Rainshower cannot install because the existing shower rose length is shorter than rain shower... so if we install at the same position will hit the pipe boxup box on the top.. so gonna shift 1 tile left from the existing location.. sian.. Common toilet
  3. 2nd March... All windows grills are up...
  4. Contractor also loosen wires for coming TV feature wall and wardrobes.... For TV feature wall Dinning light point...
  5. 1st Mar installed some lights to check if everything ok... MBR Bedroom 1 Bedroom 2 Passageway outside common toilet and Foyer using same light... Con't
  6. Con't...... Lightings are here too...
  7. Con't.... Arrival of my bathroom accessories... to be con't....
  8. On the same day 29th Feb arrival of some of my accessories... Tecno Cooker Hob with safety valve Tecno Slimline Hood
  9. on 29th Feb... My whole unit completed 2 coat of paint all over..... Nippon Lily White 3106 for living & dinner areas Nippon Lilac White 3156 for all bedrooms
  10. on 27th Feb painter starting to paint sealer and my 1st coat of medi-fresh Nippon 3in1.....
  11. Floor protector also lay on the same day....
  12. on 24th Feb contractors all swamp in to take measurement and do markings... They are so pro each doing their own stuff... Later that afternoon cement kerb up for kitchen cabinets....
  13. on 24th Feb contractors all swamp in to take measurement and do markings... They are so pro each doing their own stuff... Later that afternoon cement kerb up for kitchen cabinets....
  14. Here con't my update.... All according of the reno project... 24th Feb... Padlock up...
  15. Can anyone with Mr chew number kindly PM me... Thanks
  16. Hi Newnewnew, I'm choosing cabinet laminate not floor....
  17. Hi potatoes, point noted... thanks...
  18. My Contractor also asked me to choose from there if I could.... Headache
  19. Spend fews hours @ Uned Bath Station Pte Ltd and purchased all Lightings, Bathroom accessories, Kitchen Sink and Champs storage heater from them....
  20. Spend fews hours @ Uned Bath Station Pte Ltd and purchased all Lightings, Bathroom accessories, Kitchen Sink and Champs storage heater from them....
  21. Hi hwaa, do you have the link for facebook? I can't find it... finally see someone from my estate....
  22. Hi, what your sis did? what items? care to share?
  23. Hi Richfieldid, what your sis did? what items? care to share?
  24. Hi Mango13, the furniture collection center @ sungei kadut ave... after I purchase from them, then I saw the comments here at Renotalk abt them.... sian.. :bangwall:
  25. Just hope to share my experience of renovate my 1st HDB home.... Just confirm my contractor yesterday and will start renovation work on the 24th Feb 2012.... :deal: Items given to me after my deposit:- My paint that I be using for my whole unit.... I'm having headache after receiving this 2 Booklets.... Which one better?

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.