Everything posted by Nivle

  1. Can't wait to see the above transfomtion
  2. Day 15 wall tiles for other side of kitchen up.. View of bedroom 4 & 5 from Kitchen Bedroom 5 almost done. constructing of 'bath tub' soon
  3. Actually it's not up to size...eat into living room a little bit only as above above is the actual size of living room
  4. Must replace some letters then all can see...like i replace y.. etc.. indeed it's tiring repeating same thing over and over again..but dun feel bad about getting quotation.. We need quotation to judge the total costs.so it's their job to provide thie 'free' service to us.it's the 'rejecting' part that you have to be good at it...
  5. Same problem ..go sticky thread and do testing.I took abt 30 mins ... cheers Congrats on your Crib and good luck for reno..
  6. Bro, thanks for reading... will update asap...
  7. Bro, replied you in PM, please check..
  8. Took me at least 1 hour to get it done..screw, water come out from side, unscrew and rescrew.. enjoy..
  9. hardworking tiler master, everytime I go up, he is always working. Bedroom 4 almost done up.picture taken at 115pm. Hope can complete by Today...
  10. Day 13 went up with Drinks..today 3 workers working till 530pm Should say workmanship not too bad.... Walkway/corridor after construction of bedroom 4 Kitchen start tiling.
  11. Bro, good luck & looking forward to your blog... the small room will be my store room without any windows..
  12. Day 12 3rd sister room in progress,cover ears cos noisy Prince room is next
  13. Wow...like that my whole house fully designed.lol... To me design is like what u dun see in everybody house, like wiw or wardrobe got curve here,curve there or even triangular shape. Mine kids all standard 5ft to 6 ft wardrobe lor...thanks for reading anyway.. Tonight upload more pictures...
  14. Hi, Congrats..It's important to get a good ID, think have to spend some time reading before selecting. Depending on needs and priority..Basically my reno not much or even 'no' design ...Just wanna have equally size room for our kids ...Good luck to you
  15. Nope...they only hack 5 days(quite a lot ) for week 1. Sat,sun n holiday(hair raya puasa) rest. Week 2 starts rebuilding of walls n toilet tiling from Tuesday to sat. And will continue into Week 3. Hacking on weekend sure kanna complain...but construction of hollow blocks should be okay
  16. MBR toilet in progress 3rd princess room Tiler master ask for opinion abt prince room wanna do till where? A or B chose B so that a bit more space for my Aquarium
  17. Day 10...I went up at lunch time(with lunch of cos) Have to agree the Tiler are doing quite fast.... today i went up 4 times, every time I ask my daughters, they wanna go up and see their own room's progress.. Layout is ready. Store room also done
  18. Doing back 2 toilet entrance area n mbr/bedroom 2 wall.😒 Constructing store room in kitchen n bedroom 4 n 5.😃
  19. Store room under contruction from living room- from kitchen- MBR and Bedroom 2 separated again
  20. Day 9 (2nd day of tiling after 5 days of hacking,weekend + holiday) Common toilet wall is made good and wall tiles is up MBR toilet in progress
  21. After hacking, can see MBR, bedrom 2 and bedroom 3(at least the door) .
  22. Hackers gone... now welcome tilers... start work very early...8am plus... Floor tiles ready 1 of my princess floor tiles
×