Can't wait to see the above transfomtion
-
Day 15 wall tiles for other side of kitchen up.. View of bedroom 4 & 5 from Kitchen Bedroom 5 almost done. constructing of 'bath tub' soon
-
Actually it's not up to size...eat into living room a little bit only as above above is the actual size of living room
-
Below is what we Wanted ..
-
Must replace some letters then all can see...like i replace y.. etc.. indeed it's tiring repeating same thing over and over again..but dun feel bad about getting quotation.. We need quotation to judge the total costs.so it's their job to provide thie 'free' service to us.it's the 'rejecting' part that you have to be good at it...
-
Nice reno.. Thanks for sharing
-
Like Finally, We'll Have A House To Say "its Our Crib!" 😊
Nivle replied to norawaggyman's topic in Reno t-Blog Chat
Same problem ..go sticky thread and do testing.I took abt 30 mins ... cheers Congrats on your Crib and good luck for reno.. -
Bro, thanks for reading... will update asap...
-
Bro, replied you in PM, please check..
-
Took me at least 1 hour to get it done..screw, water come out from side, unscrew and rescrew.. enjoy..
-
hardworking tiler master, everytime I go up, he is always working. Bedroom 4 almost done up.picture taken at 115pm. Hope can complete by Today...
-
Day 13 went up with Drinks..today 3 workers working till 530pm Should say workmanship not too bad.... Walkway/corridor after construction of bedroom 4 Kitchen start tiling.
-
Bro, good luck & looking forward to your blog... the small room will be my store room without any windows..
-
Thanks for the compliments
-
Day 12 3rd sister room in progress,cover ears cos noisy Prince room is next
-
Wow...like that my whole house fully designed.lol... To me design is like what u dun see in everybody house, like wiw or wardrobe got curve here,curve there or even triangular shape. Mine kids all standard 5ft to 6 ft wardrobe lor...thanks for reading anyway.. Tonight upload more pictures...
-
Hi, Congrats..It's important to get a good ID, think have to spend some time reading before selecting. Depending on needs and priority..Basically my reno not much or even 'no' design ...Just wanna have equally size room for our kids ...Good luck to you
-
Nope...they only hack 5 days(quite a lot ) for week 1. Sat,sun n holiday(hair raya puasa) rest. Week 2 starts rebuilding of walls n toilet tiling from Tuesday to sat. And will continue into Week 3. Hacking on weekend sure kanna complain...but construction of hollow blocks should be okay
-
MBR toilet in progress 3rd princess room Tiler master ask for opinion abt prince room wanna do till where? A or B chose B so that a bit more space for my Aquarium
-
Day 10...I went up at lunch time(with lunch of cos) Have to agree the Tiler are doing quite fast.... today i went up 4 times, every time I ask my daughters, they wanna go up and see their own room's progress.. Layout is ready. Store room also done
-
Doing back 2 toilet entrance area n mbr/bedroom 2 wall.😒 Constructing store room in kitchen n bedroom 4 n 5.😃
-
Store room under contruction from living room- from kitchen- MBR and Bedroom 2 separated again
-
Day 9 (2nd day of tiling after 5 days of hacking,weekend + holiday) Common toilet wall is made good and wall tiles is up MBR toilet in progress
-
After hacking, can see MBR, bedrom 2 and bedroom 3(at least the door) .
-
Hackers gone... now welcome tilers... start work very early...8am plus... Floor tiles ready 1 of my princess floor tiles