Everything posted by Nivle
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Common toilet Kitchen. Bedroom 4 for 3rd princess Bedroom 5 for Prince Air con drainage goes to Balcony
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Let's see the progress after 6 weeks.. From entrance Living hall-dinning area-Storeroom Living Hall-Balcony Little Walkway- Right side Kitchen,common toilet. Left side, Bedroom 4 n bedroom 5.
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
DAY 41, WEEK 6 COMPLETED Tomorrow chemical wash(1st time). Tuesday start Painting. From WEDNESDAY -Carpentry start coming in. Thursday, Hood and hob installation. follow by: Kitchen cabinet, Island top. Windows grill, Plumber come in and do piping Installation of lights and fans... Chemical wash(2nd time) Mission completed... Should be correct
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Sofa set looks good at $999...Do some maths 1st before buying..
-
3 Roomer In Potong Pasir
Nice and good luck for your reno/ID search
-
Our 142Sqm Ea @ Sk
Looks Good... enjoy
-
Need Help On Cost Of Electrical Works
Wow...your single wall socket and double very ex leh
-
Why Do We Need 2 Trips For Aircon Installation?
Mine only uses 1 trip during reno, they came at 11am-have a little discussion with my ID on 'route' of running the electrical point and drainage pipe(trunking). finishes at 530pm. they will leave the cable there and electrician suppose to connect to the air-con point. after the air con installed,mine id proceed to conceal the piping(false ceiling and patching) Good if ID is around to ensure no blockage when your build in cabinets coming in etc.. Painting and the rest comes later Good luck mate
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Called HDB and confirmed building of 25 storey shoe apartment will be as above...our views will not be affected(blocked)
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
DAY 39 Tilers has managed to complete all Tiing work. MBR Bath tub Close up Very happy with this patching of 'old air con bracket' False ceiing in progress newly construct bedroom 4 n 5 do real sealing/false ceiling.
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
cos i treat tiler well. today bought fried rice with extra egg for lunch...
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
5 bedrooms only, cos I ask around, a lot of frens say they seldom on the living room one, some even say only on cny.... Anyway have 4 wall fan and 2 ceiling fans for the 5 bedrooms and living room also...eleven storey also quite windy.. For the overloading part, submission of application done by gain city and electrician... already approved by HDB, pay $350 for testing and thus Andrew have to make some 'special' arrangement.
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Lights we bought from Lights & Lights(Balestier). Access Balcony Leds.. WIW Led light MBR LED ceiling lights..blink blink can change between yellow or white light. from to First princess lights change to this one..inside change from energy saving to led..side got some crystals
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
AIR CON Lai liao While installing... received a piece of 'GOOD NEWS' Our application for a second condenser(compressor) to be place outside bedroom 5 has been approved. So tomorrow go Gain city and settle $, Thursday install system 2....Finally 5 bedrooms with air-cons
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Day 36 Lightings and switch point plan setting up for wiring. Rewiring in living hall.. Rewiring for Kitchen MBR tiling almost done
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
DAY 34 Island base up.. Common toilet ready All Plastering should complete by today
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Yes...Can see the tiler very good...For our common toilet tiling..greenish colour n semi circle type.. he really make an effort to try and 'join' them..as below..
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Yah... looks well in time...Just went up and saw 1 worker doing plastering (sunday wor) Tiling(left MBR toiet) should complete by Monday.. Tomorrow(week 6)- Electricians come.follow by carpentry...so should finidh by week 7..
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
These are self bred....and finally this pair 22 months old..The male keep eating the eggs previously, but this time finaly see fries..can see their body change, start to have slimes to feed the babies..
-
Customized Bedframes?
just to add on...I was thinking of customizing also, but the quotation come back not cheap...Then we were shopping at Marina square, went in 2 shops, can see sales going on, was teling my wife why these ppl buy from Marian square, cannot be too cheap leh... Then we come to this shop and saw they have actually what we wanted(for my 3 girls.... high L-shape side panel, with storage bed(below can put bed sheet etc...) and also side storage(put some display or sft toys) and head board(also storage)...Then plus our king size storage bed frames(all surrounded with stoage)...So al lump and buy there...can pay instalment also...
-
Customized Bedframes?
can go marina square n walk walk see see... i found n bought 4 bed frames from Bez Gallery..
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Workmanship Before and after
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Bedroom 3 Plastering done Bedroom 2 Plastering done Kitchen floor tiles done and WM,Fridge, Kitchen cabinets bases ready
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
DAY 32 Plastering.... Before n after As specified by the expert, this is where the termites come from... Before and after. Another of the crack area.. MBR hollow blocks up...pending tiling
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
WOW.. Sounds good bcos mine Dinning area super small..