So you are here Mine is district 16 too. Hoping to see your pics soon.
-
Day 13 (17 Aug 2012) Looks like a screw up between ID and ceiling contractor. In the living room, we were supposed to have cove lights which point inwards towards I ceiling fan. But the result is now like this, ie cove lights pointing outwards... Before I ask them to tear down and redo, I need some opinion...is this better or inner cove better? I somehow seems to find that the "wrong" one may be better...Hahaha...maybe the workers' hands were guided by God.
-
Any movers to recommend?
Minerat replied to koras's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Do they take off the shoes before entering your house? Do they hand carry all your stuff in the house vs using a trolley inside? -
Day 12 (16 Aug 2012) Lots of things happening today. The pest control guys came and injected the termite treatments. Finally tiling for floor can start already. False ceiling guys also came and started working on the living area. The window extension project also went ahead with the tiler plastering and smoothing that area. Meanwhile tiling continues. I must confirm the waterproofing contractor fast. Was raining this afternoon and my 3rd floor toilet looked like a waterfall. Hahah False ceiling wip Sneak preview of 2nd floor toilet Sneak preview of 3rd floor toilet
-
I made a mistake when starting the Reno. I tried to be prudent by having a list of things that we will reuse existing. However end up we start getting rid of them along the way. That's how I ended up with a 30k VO. You know, it is hard to resist when you start to see the newer and better stuff and you think of the old ones back home.....You get my point lah. lol So you either have rock iron discipline or specify everything you want to do in the package. Dunn forget that a VO works both ways, ie you can also ask to take out things you dun intend to do after signing the contract.
-
All I can say is budget prudently because there will definitely be VOs during the course of your reno. I started with a reno quote of 70k and is now looking at a VO fast approaching 30k!
-
Hacking will cost you alot.
-
Day 11 (15 Aug 2012) Tiling for the second and third floor toilets started today. They have also ripped out the window that I wanted to shift out. Now I must say that I was pretty unhappy with my ID over this. When they apps me the picture, I'd reminded them to cover up the hole. They assured me that it was done. But when I checked later at night, the hole where the window used to be, wasn't covered at all! If it rains, my parquet and wardrobe will be gone. Apps my ID and he said he overlooked that. He said he will get the worker to cover up tomorrow and I'd reminded him to pray for no rain tonight. Otherwise I will be getting new parquet and wardrobe for free. Hahahaa...
-
Day 10 (14 Aug) Not much happening today. Tiling continues. Level 1 toilet tiling looks complete already. Aircon guys also came and fixed up the pipings. Another waterproofing contractor came down to do his assessment. This one was recommended by a fellow forummer. We went to look at Amasco LED downlights in the evening. They seem to be selling at quite a reasonable price. Anyone has any feedback on those?
-
How much did the landscaping cost you?