Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

split84

Members
  • Content Count

    100
  • Joined

  • Last visited

Everything posted by split84

  1. I just call hdb enquiries hotline. Talk to an officer to complain abt the rain and they will entertain you..i also took photo on of corridor during a raining day to prove to them that the rain splash in badly..
  2. If u call hdb to complain said water splash onto the corridor and wet ur door they will install for u foc but u need to maintain it. At my current house I called to complain said floor is wet they said will install for me
  3. I already have a mb acct thus I choose mb.. The lady was in renotalk so... Wrong move
  4. will be taking up a reno loan for my house..been liasing with a loan officer and was totally disappointed by the service provided by her..so pissed off today..
  5. I'm not sure abt that as I just got an indemnity form submitted last week.. Just sign by owner will do.. But my form not yet approve so I can't firm if the changes is there..
  6. I just got my seller to help me sign one in order for me to start Reno hacking immediately after my completion reason being as permit will take abt 4days to 1week according to my contractor for hacking down the wall.. Don't want any delay for my Reno work.. Even so the owner still ask us to produce a black and white to them saying that we will not start any Reno before completion and they are not liable for anything
  7. When should the seller clear their stuffs for inspection? My 2nd appt was in the afternoon at 5pm. I paid the conservation fee till the date of 2nd appt shouldnt that mean before the 5pm appt i am still the rightful owner? My buyer msg me saying that he already being very nice to let me only shift my thing is the morning before the appt.. I call HDB to check with them that as long as i shift out before the completion even on the very day of the completion is fine..the owner call me unreasonable for even asking to shift in the morning before the completion... My case was, i arranged to shift my items on 10 dec morning to my new place to save on the cost for storage..i cant shift earlier than that as my new house owner dont allow till 10 Dec which was suppose to be the completion date ( they have been nice enough to allow us to shift in the morning)..My FSM advise us to only shift on 11 Dec so i check with my house buyer which was rejected..and his message was "he have been nice enough to allow us to shift on 10dec morning". I was being called unreasonable when i told him i am still the rightful owner before the completion at 5pm...
  8. He charge me 488 for my em
  9. I actually arrange a day for him to go down to the place as I have not collected my key yet.. But I need him down first as I wanna start my Reno as soon as I get my keys.. Like way multi888 said I find that his ba zhi reading was rather accurate.. But for house audit really need to move in to the house first before I can comment more
  10. Bought some items on taobao with the help of my cousin who is currently working in China.. http://a.m.taobao.com/i20307456940.htm?sid=ec0e6e1adfee7b65&pds=fromtop%23h%23shop 2sets of DIY wardrobe =374 x 2 =748 http://a.m.taobao.com/i13169667288.htm?sid=257f51dc6382c998&pds=fromauc%23h%23shop Kitchen tap 1 set =358 http://a.m.taobao.com/i13159220101.htm Shower Mbr 2 sets 358 x 2= 716 http://a.m.taobao.com/i13887368146.htm?sid=257f51dc6382c998&pds=fromauc%23h%23shop Kitchen shower 1 set =260 http://a.m.taobao.com/i9643083222.htm?sid=257f51dc6382c998&pds=fromtop%23h%23shop Toilet accessories 2sets = 178.60x2= 357.20 total damage: rmb 2439.20 (abt SGD488) shipping cost estimated abt SGD300 Total will be abt SGD800
  11. i did for my current house..and will be doing so for my new house as well
  12. i saw 1 ground from em at khatib with a loft at their balcony..if i have a chance to walk pass again mayb i try to snap a pic.. anyway just to check here..what is the common air-con brand use in em? i was told with system 4 the power will not be gd and was recommended with system 3 instead..can someone advise please.
  13. Condos with strict rules might not allow awning and roller shelter..
  14. But anyway my Reno only starting in dec mayb by then what ever he mention yes yes yes might become no no no and later might tell me to top up
  15. is actually the electrician from my contractor..price also include PE endorsement..
  16. Received a few pm concerning my budget, really thanks fellow forumer here for being so helpful. Anyway I have check with my contractor that my rewiring work is already inclusive of additional lighting points, electrical points, LAN points and scv point. 3.4k is the lump sum he give me..
  17. Can't wait to see more pics from ur blog.. U may want to consider my contractor.. Though I don't know if his workmanship is gd but he claim that they use the same worker as chew.. One thing I like abt him is the service, very responsive and trying very hard to accommodate my budget by squeezing everything I want into my budget and give me discount for those that can't fit in..
  18. Thanks for all the advise on shower curtain but the taught of having my kids playing Bollywood with the curtain is quite horrible..
  19. Congrats in buying ur em, wow I really love the ur em layout! How I wish mine was like that is like can have 3 rooms with toilets.. Envy!
  20. Thanks for the recommendation but I don't really like shower curtain cuz it turn mouldy easily and I have young children at home hygiene wise I will be more careful
  21. should be starting on 11 dec, hopefully can move in by 11 jan since im not doing much..
  22. Ya i told the contractor any addition i will not have money to pay even by selling my hubby backside..not gonna do anything to the stairs..i have 3 young terror at home if do majoy overhaul is also a waste of money as they will damage them in no time..
×