Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

eilyn

Members
  • Content Count

    13
  • Joined

  • Last visited

Community Reputation

0 Neutral

About eilyn

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Female
  1. Oh we have done up our curtain. Our curtain is the tracking sys type. Our curtain guy din even offer the pole system once he saw our semicircle. You are right. A lot of commercial shop has the semicircle aluminium track. you can try asking them where they got it.
  2. Hello! Looking forward to your renovation pictures as well!
  3. Yah my flat is in redhill. Relacker, You too? Which block you stay?
  4. oonik girl: I haven't connect up the gas pipe yet so still dunno how it works. My ID advised me not to connect it until we move in coz supposedly citygas will start charging us upon connection. My hob is not even glued to the table top. Still can be lifted up. Cantona7: Thanks. The kitchen tiles are the original HDB ones. Think the granite top saved the look at the end of the day. I PM you the name of my ID and company already.
  5. Renovations 100% completed. Still missing furnitures and curtains.... More recent photos to share at http://www.flickr.com/photos/8499164@N04/
  6. Now it's 90% completed. Only left with the shower screen and final touch up on the carpentry, flooring, paint. Until now My Mister is still modifying his av console. He put in a lot of effort on the layout of his av console. But it's difficult coz he is oversea. Anything he has to go through me and then i relay it to our ID. So far he request for opening at the side to run cables, boxed up area to hole the cables, ventilation slit on top for the hot air to escape, the specific dimensions, running cables to the back of the room for rear speakers and stuff. Now need to get the carpenter to drill more holes in the cabinet to allow the cables to run to the subwoofer. and additional ventilation holes below the console. He is treating the av console like a CPU casing. How amazing. But very stressful coordinating the works. Hope he dun get a shock when he comes back. http://www.wretch.cc/album/album.php?id=eilyn80&book=2
  7. Hi bubblepearl, dun worry. Have to be a bit fussy. Is only reasonable to ensure you get what you want esp after paying so much money. hehe . Can PM me your id also? Care to share your house pic?
  8. my carpentry dismantle the bedframe liao. The bedhead remains though. Hope it turn up well. Tom my plumber will install the sinks and stuff. Well post more pictures of my kitchen and bathroom. Still worried about the look of my kitchen. . .
  9. whao, nice place. How long did you take for the renovation? Must have been very tiring. But good to you that you are happy with your end result. For me, though I engage ID for my reno, i still feel very exhausted from all the inspection that is required.
  10. bubblepearl: no worries. things come at an expense. for us, we spent $$ on house, but no $$ for wedding. So after this got to save up for wedding. lifestyle: thanks. but unfortunately i already bought a storage bed. coz my ID forgot to tell my carpenter that, he went ahead with the bedframe. Now the furniture shop has already process my order and i cannot cancel it. So got to get the carpenter to remove the bedframe. .. . a bit sayang. MaCe: nice to meet u. Just wondering if the kitchen laminates looks too raw. Coz when we choose the laminates initially, we thought it would be more homogenous. In the end it end up looking like raw pine wood. Dunno if it would look nice with granite top in the end. I'm very tempted to get my ID to change the cabinet doors for me. But most likely need to top up. $$ again.
  11. yup newbiee, our reno is about 40k excluding furnitures and electrical appliances. I already spotted alot of things for my id to rectify. It really hard to have reno without hiccups. Like I had to run to lighting shop few times to change a bulb, had to change my sink coz it got some funny black line and scratches. Just to name a few. Dunno izzit i too fussy.. . oh your bamboo holder not in the kitchen?? you have service balcony?
  12. Hi all, my renovation is at the carpentry stage, about 70% completed. Would like to share some pictures with you all. Please feel free to comment. http://www.wretch.cc/album/album.php?id=eilyn80&book=1
×