My Dream House @ Bukit Panjang
Haizzz... Waited for so long for them to complete the granite top but they didn't do a good job. The skirting suppose to end at the edge where the washing machine tilting. But they didn't put the skirting at the front, hope they can rectify the issue. The cabinet now look so awl full.....
-
My Dream House @ Bukit Panjang
I choose the pure white and thin laminate. I did ask for the diff between 1.2mm laminate, the contractor said thick laminate will see black lines at the edge due to the thickness. So I choose the thin one.
-
My Dream House @ Bukit Panjang
Yup, have been smooth sailing. So far so gd
-
My Dream House @ Bukit Panjang
Rubbish chute hidden in the cabinet beside the window
-
My Dream House @ Bukit Panjang
Now pending for the installation of the granite top
-
My Dream House @ Bukit Panjang
At last cabinet completed today Loving the cabinet and the workmanship, even my brother compliment on the workmanship :good: :D
-
My Dream House @ Bukit Panjang
Before After
-
My Dream House @ Bukit Panjang
The tiles from Hafary
-
Bachelorette Pad
Ur flat layout is the same as mine. I choose to hide all the piping.
-
My Dream House @ Bukit Panjang
Forgotten about electrician, their workmanship 100 marks they follow our request and help to hide all the trunking in the living and dinner rm.
-
My Dream House @ Bukit Panjang
Kitchen photo Common toilet, pending shower screen So far Reno is progressing smoothly. Last night my brother commented the painting work was lousy, he can see patches on the wall when the lights is on. He said the painter may have added water when they paint, that's y the wall paint looks uneven. Next week Saturday will show to Alan see what he say. Yesterday during cleaning found the kitchen wall tiles gap white clay kana etched away during acid wash Need to fix this before the cabinet install this Wednesday.
-
My Dream House @ Bukit Panjang
My brother help me installed the shoe cabinet yesterday. So neat Track light track hidden in the false ceiling. the workmanship of the false ceiling guy can say 100 marks But he did not do the balcony access hole nicely. As per Alan discussed to open a hole for the balcony waste pipe so that any issue with drainage we can access. But I didn't expect the hole to be in this condition hope this can be resolve.
-
My Dream House @ Bukit Panjang
The house almost completed. Yesterday my brother and I cleaned up the whole house. Siong Now waiting for the installation of air con and cabinet. Here are some photos of the Reno. Living and dining hall The living room tiles and kitchen floor and wall tiles are inline. Loving it haha I give the tiles man workmanship 100 marks. Master bed rm Master bed rm toilet. Still pending the basin granite top and shower screen The plumber help to hide the water pipe by drilling from the common toilet to master.
- My Dream House @ Bukit Panjang
-
My Dream House @ Bukit Panjang
Tiles up, wiring done, aircon piping done