Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

noie

Members
  • Content Count

    26
  • Joined

  • Last visited

Everything posted by noie

  1. Haizzz... Waited for so long for them to complete the granite top but they didn't do a good job. The skirting suppose to end at the edge where the washing machine tilting. But they didn't put the skirting at the front, hope they can rectify the issue. The cabinet now look so awl full.....
  2. I choose the pure white and thin laminate. I did ask for the diff between 1.2mm laminate, the contractor said thick laminate will see black lines at the edge due to the thickness. So I choose the thin one.
  3. Yup, have been smooth sailing. So far so gd
  4. Rubbish chute hidden in the cabinet beside the window
  5. Now pending for the installation of the granite top
  6. At last cabinet completed today Loving the cabinet and the workmanship, even my brother compliment on the workmanship :good: :D
  7. Ur flat layout is the same as mine. I choose to hide all the piping.
  8. Forgotten about electrician, their workmanship 100 marks they follow our request and help to hide all the trunking in the living and dinner rm.
  9. Kitchen photo Common toilet, pending shower screen So far Reno is progressing smoothly. Last night my brother commented the painting work was lousy, he can see patches on the wall when the lights is on. He said the painter may have added water when they paint, that's y the wall paint looks uneven. Next week Saturday will show to Alan see what he say. Yesterday during cleaning found the kitchen wall tiles gap white clay kana etched away during acid wash Need to fix this before the cabinet install this Wednesday.
  10. My brother help me installed the shoe cabinet yesterday. So neat Track light track hidden in the false ceiling. the workmanship of the false ceiling guy can say 100 marks But he did not do the balcony access hole nicely. As per Alan discussed to open a hole for the balcony waste pipe so that any issue with drainage we can access. But I didn't expect the hole to be in this condition hope this can be resolve.
  11. The house almost completed. Yesterday my brother and I cleaned up the whole house. Siong Now waiting for the installation of air con and cabinet. Here are some photos of the Reno. Living and dining hall The living room tiles and kitchen floor and wall tiles are inline. Loving it haha I give the tiles man workmanship 100 marks. Master bed rm Master bed rm toilet. Still pending the basin granite top and shower screen The plumber help to hide the water pipe by drilling from the common toilet to master.
  12. Tiles up, wiring done, aircon piping done
  13. I go almost everyday My own house mah
  14. Engage Alan to do the Reno. He give lot of ideas and recommendation what can and what cannot do. Workmanship of his team so far was good. But need to supervise closely because they may do wrongly. But most of the time it is due to wrong understanding of the design that I want.
  15. day number 13 and the Reno going smoothly. Their workmanship so far so good and the progress of the work are fast. They almost completed laying the living rm floor tiles and the wall tile of the kitchen and toilets. Hope everything will go smoothly. Will post pic once the floor ready.
  16. The original floor have cracks at few location Living rm tile I choose, homogenous marble design
  17. Day 1 and 2 After all the hacking.....
  18. Contractor hack away every thing today.
  19. Congrats, where is ur place and how much u bot?
  20. Before renovation photo Living room and dining hall view from kitchen Kitchen
  21. After searching for so long. At last bought a 5 rm flat at bukit panjang. My Reno start on Monday, so excited hehehe.
×