Everything posted by Acklane
-
Treegrove My New Home
Congrats for your new house also. I have saw few of my friend that have got flat these few years ( Sengkang, yishun and punggol) and it seem like the design is almost the same also. This make the HDB designer life so much easier . . . .. . .lol
-
Treegrove My New Home
Hi Pressuntilshiok, Sorry overlook your question for contact. Will PM you. Cheers
-
Treegrove My New Home
Just got new drawing for the changes on platform . During the selection on laminate for platform and wardrobe, we were having a hard time selecting. It took us some time on this but the result (1st design ) does not meet our expectation.I believe this will be a big headache for most people. Lucky my ID is patient and helpful enoughMany thanks on his advice for color matching.Now It looks much better than my original laminate selected.
-
Treegrove My New Home
- Treegrove My New Home
Some update on my 3D amended drawing- Treegrove My New Home
Just saw a neighbour place service yard and this remind me of the advice from my ID on the drainage for washer if not I will miss this also. I find this is very useful for those to take note if you guyz have not done this. I think this is a part where a lot of us will miss. See picture below. My washer drainage pipe have been shifted to a corner and this can let me have more spare for washer My friend place drainage at original position. To me it seem like very cramp after washer is place in. Don't know why HDB design this in the middle? Hope this is useful to those who is gong to start their reno.- Building Our Nest At North
Hi LinaKua, I believe we are neighbor of TreeGrove. For service yard I find that it will be better to shift the drainage to a comer see picture below and hope that it is not too late to amend if you think it is good. This is advice by my ID and what i did picture taken from my friend place.- Treegrove My New Home
Hi, Aircon was done by Tim Wong team. The cover up on aircon trunking was done by my ID.- Treegrove My New Home
MBR aircon trunking nicely done Before After- Treegrove My New Home
L box and false ceiling up on 31-11-13 Living Room MBR Water filter in Kitchen done- Treegrove My New Home
Windows Grill installation on 30-10-13- Treegrove My New Home
My electrical installation done on the same day as aircon installation- Treegrove My New Home
The Aircon installer took almost 1 full day for this. System 3. They started at 11.30 am till 5 pm to complete everything. MBR Room 2 Room 3- Treegrove My New Home
Electrical and Air Con installation on 29-10-13- Treegrove My New Home
Done some shopping in JB- Treegrove My New Home
Start of reno on 19-10-13 Construction of fridge and kitchen base- Treegrove My New Home
- Treegrove My New Home
Got my 2nd drawing from ID. Some changes on 2nd drawing is still needed. Living room MBR 2nd bedroom 3rd bedroom- Treegrove My New Home
Finally after a long wait for 3 years, my BTO flat has finally completed, now its my turn to share my reno for my new house in TreeGrove. BTO @ Tree Grove applied on 11-07-10 Got key on 19-07-13 Floor plan- Caesarstone Countertop Review?
Hi Snookie, Do you mind to share how much and where you got Caesarstone Quartz countertop ( per ft ) ? I am going to renovation my new flat soon and are looking on the price. Thanks in advance.- My House @ Teban Vista
Hi Mangoo I am getting my key soon and hope that you can share with me Mr K contact and the cost of your reno with breakdown. Thanks in advance- Home @ Northeast
Hi retchlow I am getting my key soon and hope that you can share with me the cost of your reno with breakdown. Thanks in advance- My 4 Rm Flat
Hi dan, kindle pm ur contractor's contact. Thanks in advance. - Treegrove My New Home