Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

alberttcs

Members
  • Content Count

    206
  • Joined

  • Last visited

Everything posted by alberttcs

  1. i long long given up hope monitoring my unit, it seems to take ages. My flooring was done, rest others just stopped. They stopped a few days with nothing being done for days. I also getting abit restless chasing after them.
  2. true lo...say like no say like that...
  3. Former 'Karimun Admiralty Country Club new facelift (This site is located just across a road from Sembawang MRT) : http://www.sla.gov.sg/htm/new/new2007/new0318.htm It is almost 4,000 sqm in Gross Floor Area (GFA) and about 52,000 sqm in land area. YESS Group intends to use the surrounding land on the hill slope to construct new footpaths and jogging tracks for public use as part of the park connector. A new golf driving deck with refreshment facilities will be constructed using steel structure instead of using concrete.
  4. haven't yet. Still waiting for quotes
  5. have you all decided upon your ID yet?
  6. selenal,do take note that there's a electrical board and some concealed wiring on the wall (i presume you wanna hack it to have a open concept kitchen. Most probably you'll need to apply permit from HDB to hack it, but maybe have some difficulties to get it approved, but no harm trying though. Another concern would be the placement of the fridge near the door of service balcony, might be alittle tight to get into the SB when you have the sink cum cabinet built plus the fridge there. Just my 2cent view. hehe maybe can refer to this photo to have a better view
  7. hi, i hasn't gotten my keys but the door are usually not locked, so i always kaypoh go and see. LOL
  8. i suppose so, or maybe they just want to clear sector by sector first? 339a,b,341a/b, then slowly others ba? Somemore once they let us sign, follow by rectification work, another killer for them ba. LOL I forsee the rectification work to be another killer, i went to see my, OMG, the service balcony door can't even close lo. Lousy quality
  9. hello candyprincess, welcome to chat here What a concidence on the name! LOL My block have finished paiting the exterior since a week ago, as usual, i wrote to my HDB officer but no reply from her. If i'm not wrong, your block should have completed if not nearing paiting the exterior liao. They should be doing 357B liao. Think this is more appropriate place to chat than on other bro's sis' t-blog, LOL
  10. during the initial launch, it was about $520psf, now it's
  11. ya lo, can only get those that stand ones. Maybe can check with your IDs, who knows they might have a way I'm thinking of how to utilise the wall at the window
  12. the only concern with basin at the window there, would be, it will be a little difficult to open/shut the windows
  13. Initially, i like the idea of my sink to be at the window area, because my is facing a park view, so kinda like the idea of washing vegetable/utensils while looking at greenery Some suggestions were: (1) Keep the existing sink at the window, then the hob got to be place diagonally opposite it, if you're 'pantang' just like me (2) sink placed near the wall outside the SB door, and (i) then either have piping link together with the washing machine piping (but just worried that if one choked, both sink and washing machine can't use (ii) have an erected kerb, hiding the piping and then link it to the original outlet But take note, for (2), we'll need to either remove away the door or change it to another new door(shorter) to accomodate the kerb. Personally i would like to have a SB door, so that during cooking, my clothing don't get smoked by it Maybe you can share what did your ID propose too
  14. you might want to check out BLUM system. I was very amazed with that particular product of theirs which was able to maximise that space area. Go to their website and click on the video for a demonstration
  15. zong, Kelvin brought me and my wife to see your unit. Really very nicely done!! My wife loves your kitchen and your WIW! Whereas, i simply love your tiles selection and your 'glasses' You should take a photo of your WIW and your MBR toilet too
  16. hi kayser, my mistake, yeah, if you want to change position, floor might indeed have to be rehack. Went down with one ID to my unit, was advised that too. Or alternatively, have to rerun the piping over the tiles, which means, you will have a kerb near the service balcony door, which also means the door have to either be removed, or replaced with a short door, to accomodate the kerb
  17. flooring need not be rehacked, from i what i see the piping is from the top down, not on the floor run
  18. selenal, i think you can ask your ID to move it to elsewhere too, no problem on that just that they would have to rerun the water trunking/piping. Just some additional info, if you're going for the same layout as the sink where the kitchen are, just make sure your cooking hob is not directly opposite it, not a good fengshui placement for sink to face hob.
  19. anyone else scheduled for their key collections soon too?
  20. hdb - mypage. I just ringed up also, sigh...phone system says my key collection not scheduled yet. Wait wait wait... but i'm happy for you!! can start renovation soon le...
  21. sigh. just checked my, on the HDB page, still not ready yet. Just wrote an email to my HDB officer to request too. by the way, kayser, which block have you gotten?
  22. must have swimming pool also... Then can bring my son there
  23. Wow! Thanks for the updated info. Should tell them to update their website. LOL Wah! i do hope that the plan will still go through. Heard from my friend, there's a HDB development site just next to Sembawang Shopping Centre, anyone have any idea what isit?
  24. just curious...any blk 357 neighbours here??
  25. just happened to chance upon this piece of information : New White Site with Integrated Bus Interchange http://www.ura.gov.sg/ppd/mp2003/index.jsp...mp;region=north Seems like something exciting and good will be brewing up in Sembawang. !!
×