Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

lawda

Members
  • Content Count

    39
  • Joined

  • Last visited

Everything posted by lawda

  1. Hi neighbour, we stay in the same block and same unit but at a higher level. Nice meeting ya!
  2. so sorry. i have not been checking the post for a while. Please check your pm
  3. Been doing lots of cleaning and cleaning for the arrival of the finale last saturday.... Was a long day waiting in the house for the arrival of sofa, dining table, fridge, washing machines, mattress and installation of shelves in the storeroom. Glimpse of the output for sharing: Completed bed room: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140629_0201_zpsf1f8ca90.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140629_0191_zps78d8d964.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140629_0181_zpsa9a6f07c.jpg Completed service yard, kitchen and storeroom: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0101_zpsbb85020e.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0091_zpsb1628c3f.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0061_zps896c1f1b.jpg Completed living and dining area: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0111_zpsb22995af.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140628_0131_zps2e567eb7.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140629_0171_zpsd362b1ca.jpg Last and not least will be the installation of a PD door for the kitchen opening. Have been eyeing on one that comes with my idea design
  4. dun think so, my id quote me same price for both thick and thin. I took thick thou ;p
  5. Was away on business trips and busy catching up on the checking and cleaning that i have not been update the blog. Some unhappy issues came along during the check but was quickly resolved by the boss and ID. Had also manage to move in some stuff over the weekends. Catch-up on the 'outstanding' pictures: MBR done up with curtains and tv installed: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0021_zpsd945167c.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0031_zpsfc793376.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0051_zpsa0547c55.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0061_zpsd4ce1424.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0071_zpsf251802b.jpg MBR toilet: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0081_zpsc9a7efaf.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0111_zps64c6208d.jpg Living room Walkway: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0121_zpsdbe7e0db.jpg Living Room: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0151_zps27909220.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0141_zps9f8a36dc.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0131_zps7b1c8ccf.jpg Main Door with "toy": http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0161_zpsd9683d20.jpg The 2 bedrooms with curtains: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0181_zpsf6264030.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0201_zps8665b90c.jpg Common toilet: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0211_zpse99e2177.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0041_zps566eec21.jpg Kitchen: http://i1372.photobucket.com/albums/ag351/lawda/WP_20140622_0171_zps10a87f9e.jpg Will be receiving sofa, dining tables, beds and installing shelves in bombshelter this coming saturday. Will update the pictures again! Ending this blog soon
  6. ya, sometimes I think the workers feel that we are naive and not suggesting practical location but the fact is we think abit further....
  7. I got it at universal union in geylang, cost slightly over 200 (can't remember actual cost) ;p
  8. that what I marked on but.... Anyway, we will have a stopper by the side together with the hinge to prevent the door from swinging outwards
  9. Went to take a look at my unit today to check if all the toilet accessories are installed. Was initially happy on seeing the 'goodies' that we purchased were installed accordingly to what we have marked out and discussed with the PM but was pissed off when i saw my tower hanger at MBR toilet was installed not to our marking Immediately whatapps my PM and ID on the issue and request to have this fixed without seeing any patches on my wall tiles! Mirror at the Living room was replaced with the brown tint that my ID had initially designed. Look nice. http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0091_zps28c0790d.jpg Installation at Common bathroom (top vanity, toothbrush holder, tower holder, toilet roll holder and glass shelves) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0081_zpse9ef9c6d.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0061_zps6d25236b.jpg (stainless steel) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0051_zpsbb6809e7.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0071_zps9079162c.jpg Installation at MBR bathroom (glass shelves, toothbrush holder, toilet roll holder and bidget spray) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0041_zpse3634416.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0021_zpsc8bbb4ac.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0031_zpsc755adfd.jpg The tower hanger in my MBR that i am pissed off with! I knew the height i marked was too high but it is because of the glass door which can be swing out if a kookoo pushes it too hard and break the rubber! the current location that the installer did is too close to the door and any mishap, the door will be cracked... period. http://i1372.photobucket.com/albums/ag351/lawda/WP_20140525_0011_zps0e9d1920.jpg
  10. All the carpentry are installed in the house this week and have been doing spot checking today. Noticed quite alot of chips and roughness which were highlighted. The supervisor explained that most of these are due to transportation and they will fix the issue asap. I am left with installation of all the accessories, few lightings and touch up to end this blog soon... Will be meeting up curtain installer this coming monday to take measurement and to pop over to PD door office hopefully end of the month to check out door for the kitchen entrance. Pictures to share today: Glass installed at the kitchen wall http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0511_zps73a083fc.jpg Full height mirror installed at the walk-in wardrobe @ MBR http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0081_zpsc795e40e.jpg Tic tac door and shelving at side of MBR wardrobe http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0061_zpsc308c9ed.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0071_zps0714ee31.jpg Study table is finally installed (outstanding switches on the panel) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140518_0461_zps8b68d239.jpg
  11. Had a hunch that mirror is installed today and decided to pop over after work. Indeed, the mirror at the living room is up! the granite are laid as well on the kitchen cabinet. However, the tap for my kitchen basin was installed wrongly. The design is unique, i believe plumber might be confused with where the valve control should be facing... Glass door @ MBR toilet is installed, basin + tap at common toilet is installed too. Pictures of today 'catch' Glass door at MBR toilet http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0021_zpsb191176c.jpg Basin and tap @ common toilet (pending glass shower screen and top cabinet) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0031_zpsda1aa760.jpg Multi-point instant heater installed (not wired yet) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0041_zps566eec21.jpg Mirrors! up at the the living room. The brown tint is not so obvious as the sample that we were shown...nice though (pending another mirror at settee area) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0051_zps5fcdff31.jpg Cove lights @ living room were up since last week. Didnt manage to took picture then.. http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0071_zpsbfd49b43.jpg Granite top laid at both side of the cabinets (pending a small shelf next to tall boy) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0081_zpsd7f660e2.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0091_zps87a9a304.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0101_zpsf7c826f9.jpg Shelving @ DB box providing FOC by ID http://i1372.photobucket.com/albums/ag351/lawda/WP_20140516_0121_zpsb2e14f79.jpg
  12. welcomed! Hope the rest can be completed by next week before I am out of town. Can't wait to see the final work.
  13. Went over to my unit yesterday to drop some stuff and check up on the progress. The wardrobe doors are installed, tv feature wall @ MBR are up too. Estimate to complete all the stuff by end of may! Counting down the days before curtains are installed and additional PD door to frame up at kitchen entrance... The top cabinet at MBR toilet has plenty of spaces... http://i1372.photobucket.com/albums/ag351/lawda/WP_20140513_0141_zps73b41be1.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140513_0111_zps79889c35.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140513_0121_zps3b44cf6f.jpg Doors are installed for the wardrobe http://i1372.photobucket.com/albums/ag351/lawda/WP_20140513_0081_zps3fe34cd4.jpg Storage bed and tv feature installed at MBR. Outstanding table top at the side and t5 below the bed frame. http://i1372.photobucket.com/albums/ag351/lawda/WP_20140513_0071_zps2a83d264.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140513_0061_zps759a8a76.jpg
  14. Couldn't access the forum since last week. Some updates on the carpentry over the weekend Pictures to do the talking: Glass panel in MBR toilet http://i1372.photobucket.com/albums/ag351/lawda/WP_20140510_0011_zpsffd12404.jpg Using back the basin from HDB, install the vanity cabinet and top cabinet @ MBR toilet http://i1372.photobucket.com/albums/ag351/lawda/WP_20140510_0021_zpsc866a497.jpg Wardrobe in progress http://i1372.photobucket.com/albums/ag351/lawda/WP_20140510_0031_zpsccf4e574.jpg Shoe cabinet and centre settee (before and after - missing mirror and cushion) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140510_0041_zpsd883a89b.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140511_0041_zps55c25555.jpg TV feature wall @ living room http://i1372.photobucket.com/albums/ag351/lawda/WP_20140510_0051_zpsfc77250d.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140511_0031_zps21457428.jpg Kitchen with the hoob, oven and microwave installed http://i1372.photobucket.com/albums/ag351/lawda/WP_20140511_0011_zpsb18cadae.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140511_0021_zpsd364f1fd.jpg Carpentry in MBR in progress (storage bed, study table - outstanding tv feature and cabinet) http://i1372.photobucket.com/albums/ag351/lawda/WP_20140511_0051_zpsbc664698.jpg http://i1372.photobucket.com/albums/ag351/lawda/WP_20140511_0061_zps092326bf.jpg
  15. $1600 for the grilles and $550 for the windows at service yard. The price is for standard aluminum colored but ID upgrade the grille for me.
  16. some people do, for me I want unity for my visual. If hdb keep to having toilet inside the kitchen, I will opt for a difference.
  17. I opt out from hdb too. Got my own doors . Glass door for my mbr toilet but same wooden door for common toilet
  18. actually all the houses are designed the same. The heater switch outside the toilet is a good indicator that behind this door is toilet. unless the visitors are private property dwellers or elderly who does not know hdb setup.
  19. yup, will blend in well and confuse visitor where the toilet
  20. Carpentry came in today! decided to pop over to check out the stuff and surprised workers are still working! Quite amazed on the among of work done. Washing basin at common toilet is removed and the vanity is installed. The top mirror cabinet and vanity cabinet @ MBR toilet is up too. Structure for the kitchen is done too and the walk in wardrobe at MBR. there's plenty of stuff packed in the house, which i expect to be completed by this Saturday . Oh ya, the lights at bombshelter, kitchen, service yard and MBR toilet are installed too. Didn't manage to capture alot of picture as the carpenters are finishing up minor work before calling it a day. Kitchen shrunk with the carpentry setup http://i1372.photobucket.com/albums/ag351/lawda/e5295f12-8c73-48ca-8818-fa0639a272c9_zps2c86b6f7.jpg The walk-in wardrobe at MBR in progress http://i1372.photobucket.com/albums/ag351/lawda/altAv2wY5Wpg3_gglRnEj0A3u5pzY8u7QoTfje_VluwJrXq1_zps43931477.jpg
  21. yes, i did the wooden door for common toilet but i did a segregation between wet and dry area. Hope it will help to prevent the door from decaying and disintegration. BTW, my door frame is metal from HDB, not the wooden frame type you mentioned. Am installing glass door for the MBR toilet though.
×