Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

matlucio

Members
  • Content Count

    16
  • Joined

  • Last visited

Community Reputation

0 Neutral

About matlucio

  • Rank
    Bronze Member

Previous Fields

  • Renovator Engaged
    Moss Emmanuel
  • Gender
    Male
  1. Hi, Just need some advice. Today my contractor install my new toilet door but he juz remove the door but not the frame and he says if he remove my frame it will b hollow and can see my cement. It loooks funny as i can see my existing locking hole. My house is a new flat..please advice. I'm still holding the balance payment.
  2. I prefer not to as I've encounter problem with their ID and their carpentry quality is bad. Tot of just changing the hinges but must know the correct type as the door is **** heavy b'coz of the glass.
  3. Hi, I need help in my bomb shelter tic tac door problem. Currently my bomb shelter feature wall"s door is full glass door. After less than 10 months, it started to fall on one side and everytime i opened my feature wall door, the other end of the door base hit my floor. I need a recommendation on what to do. tot of changing the door to non full glass door. please advice whether to change the door or not. Any contractor to do just the door?
  4. Hi, I need help in my bomb shelter tic tac door problem. Currently my bomb shelter feature wall"s door is full glass door. After less than 10 months, it started to fall on one side and everytime i opened my feature wall door, the other end of the door base hit my floor. I need a recommendation on what to do. tot of changing the door to non full glass door. please advice whether to change the door or not. Any contractor to do just the door?
  5. No harm getting a quotation all over. In the end, it benefits you most. What I learn from my reno is "Good Things May Not Be Chaep And Cheap Things May Not Be Good.' So my advice is, to be safe, get an established contractor and pay a bit more cos in the end your house is a nest you will be living in for a long time. Not like me, try to get a cheap quotation, in the end the workmanship & services REALLY DISAPPOINTING. Good Luck You're currently in contractors/ids reputation forum.
  6. Maybe the initial bulb they give is 'chia_pal_lang ' type. Why don u use the branded type for a change. Don mind throwing the extra$$. Or maybe the bulb rating is different. Good luck
  7. Hi, In my opinion,if you're using Samsung HTS(HT-TQ22) or any HTS, u don have to get the high end cables.Unless you have a room solely for surround system, then u might get a good home theatre set n cables..As for me, since I've got the Samsung HTS(HT-TQ22), I would put all the 5 speakes in front of the tv..good luck
  8. I'm also using EF cooker hob n hood and also washing machine. Parent company is Elba.That's what the salesgal told me.It is cheaper than Elba. Elba comes out with this brand as to be competitive to the market.Elba has been out even before I was born.. More than 30 yrs..lol..
  9. if its too little..just go to CASE..no point goin to small claim tribunal cos usually they might counter sue back
  10. I've already talk and remind them.It's been me checkin the defect on my house rather than them. Even one of them wanna to sue me cos i write remarks abt hxx. xxx saya i tarnish xxx image and reputation. But xxx can't accept the fact that it is true. Now even my aircon remote control they don wanna pass to me. They will do that only during the handover.
  11. Thanks for the advice. But for me I wanna my house to be complete cos it will b for a long time I'll b stayin there. So I wanna know what should I do, to make a complain or ..Seems like they now don bother to continue doin the touch up and rectify the defects..
  12. Hi all, I juz wanna know what should i do when I've paid my reno more han 95% but the reno at the moment is doin touch up but not all are done. Some are left unattended and the finishing and touch up are unsatisfactory. Please help
  13. Thanx, by the way what CASE will do if i make a report?Will the same contractor continue the work?You know , b4 signin on the paper, they will make promises n say yes to your request but once u sign it n goin thru the reno then the word 'no' will start to come in. It makes the job unpleasant n certain part dangerous(sharp edges)
  14. Hi all, I juz wanna know what should i do when I've paid my reno more han 95% but the reno at the moment is doin touch up but not all are done. Some are left unattended and the finishing and touch up are unsatisfactory. Please help
  15. Hi Every1, I'm new here..298B..Renovation still in progress
×