Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

tulips

Members
  • Content Count

    384
  • Joined

  • Last visited

Everything posted by tulips

  1. Common toilet MBR All the windows are having 3 panels of sliding glass instead of the original 4 panels so that I can slide all the glass to one side. Only the balcony is on 6 panels.
  2. Picture time!!! Balcony window Bedroom MBR toilet
  3. hmmm... tink both of them got to come in around the same time. contractor will start the work for hacking then they will come and take the measurement for the glass window frame after the hacking then install the frame follow by plastering or tiling. PM u the price for my windows
  4. the glass window frame will go first before tiling or plastering, grill and gate will go last but u dun have to worry abt tat coz they will advice u accordingly. from the few quotations i got, the prices for wellmax is around $300 difference. Their price is a quite attractive becoz they have package for window and wrought iron gate which in my view is value for money.
  5. U can call their office at 6284 6735 and they will get some one to call u back alternatively u can ask for mark or eric which i believe is their sales team.
  6. i m not sure abt tat... most prob h scheduled his worker on concentrate on kthc home first coz his place need to be ready by end july. my grill and bi-fold doors are not done yet, if i m not wrong these will be up at a later stage when plastering is completed. I will take picture of the glass window panel with frames tonite... yeak went to my unit just now to check the installed windows panel, he din say any thing leh so i guess it should be ok bah.
  7. I have also engaged Wellmax for our glass window panel, grilles, wrought iron gate and toilet bi-fold door. I would say their price is cheap as compared to some other quote i got from other company. My contact person is Mark and yesterday, they just came to install the frame and glass panel for my unit.
  8. Ur progress is real fast!!! Yesterday, mark's guy also came to install the glass window panel for me. Who install ur frame for u, issit a team of 3 malaysian brothers?
  9. I called him last nite around 9 plus, so he is at ur place ar... wah... very daring theme leh can't wait to see ur pict. no major work done for this few days leh, the worker will only be here tomolo. may be tonite i will take pict of my window panel that was installed yesterday and the toilet floor tiles done up by hdb.
  10. newnyew... u haven't decide on ur tiles ar... wah... no wonder yeak will nag u... got to jia you le wor
  11. okok, i got nothing on that day yet so i will join u all for the party together with my hb but i dunno how to bake yet wor, can i just bring a few bottle of wines instead or i can buy a cake also no problem. i noe a place which sell nice carrot cake and crumble pie
  12. of coz i know which shop u r referring, since u noe how to bake so well then u bake ur own bread lah at most if got gathering, i help u to buy loh since most of the time i will be at yishun leh.
  13. i haven't confirm the date yet leh... coz dunno when yeak will need them... I tink i got to ask him tomolo liao... right now, not much progress on the work coz his worker wasn't here on fri and today...
  14. this wk end, we have confirmed the stuffs for toilets and kitchen as well as the lightings... physically and mentally tired coz we are working on a tight budget so we need to think through carefully on the stuff we are buying. Burnt a hole in our pocket now...
  15. If i remember correctly it is around $1,800 but that is not inclusive of kitchen wall
  16. so glad to know that mark have gave u a good quotation his guys will also be coming to my place to fix up the frames for the bedrooms on tues leh...
  17. ya, both toilet tiles is all white. Initially, we wanted a red-white combi for kitchen toilet but the red color was not the red we wanted... abit too dull... we wanted bright red so in the end we just settle for full white.
  18. My kitchen also have similar piping and I am going to do box-up for these pipes in the kitchen.
  19. u mean the pipes in the kitchen toilet? most prob wun be doing the box-up in the toilet coz will make the toilet even smaller.
  20. I think moving in b4 7th month should be a problem, if I m not wrong the tiler will be going over to ur side tomolo liao. My move-in date is in late Sept or no hurry for now yet, already told yeak that he can take his time as long as can handover to me by 1st wk of sept.
  21. Kitchen toilet wall tiles Marble tiles getting ready for laying
  22. Force myself to knock off earlier today so that I can take pictures of the renovation even though it is yr end closing period now... super busy Balcony tiling~ To be continued MBR toilet wall tiles
  23. mine might be come after you coz my living room and bed room tiles abit ma fan, need a few rounds of polishing so may be ur will be done up swee swee b4 me.
  24. hahaha... tat is abit hard for me to visualize too bad I m working or else can catch them in action
×