Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

leafe

Members
  • Content Count

    8
  • Joined

  • Last visited

  • Days Won

    1

leafe last won the day on October 25 2016

leafe had the most liked content!

Community Reputation

4 Neutral

About leafe

  • Rank
    Member

Previous Fields

  • Gender
    Female

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. omg.. they are holding too many carnivals/promotions which they cant handle anymore. and they leverage on the quality of work. just found out that they have a few carpenter team which the [only 1 china nationality] contractor who handle my job single handed had a bad quality. not sure for others [malaysian nationality]. the staff is rude and finding excuses for all the issues, treating us like idiot.. Quote Edit
  2. updates on the Quality of work portion: it is a total disaster. delayed 2 weeks on the project with bad workmanship. the money spent is not worth it at all. now im escalating my reno project (not completed yet) to their higher management. awaiting for their response.
  3. just wondering if anyone try to hack the half height wall between the balcony and AC ledge? as the wall seems to obstructing the area and making more redundant space
  4. Lengthy comments based on my experiences (disclaimer: comments on the Sales Designer i had, do not applies to all within Absolook, thus I will not disclose his name openly) : engaged Absolook during one of their events (after 3 other ID failed to provide me the quotations), thus the person who approached me is kinda young which initially i was lack of confident with. during the sales-talks, he since to be sincere (who is not when trying to earn the money) and able to provide some genuine comments. he knows my project is small (1 room condo) and i have a budget which i emphasized to him. when i asked him to provide the quotation based on to-scale drawing, he failed to do so. He based on my estimated measurement as he promised if there is a different can be refund/top-up. but after i paid the deposit, things are going slow despite i told him my targeted date to move in. submission of 3d drawings (which is totally different from what i have described and wrong color) and the amendment of quotations after actual measurements / change of items. even though he has a back-up during his almost 3 weeks absence (reservist + personal), afterall it is his project, thus his back-up will need to keep consult him whenever i asked something. now i only crossing my figure hard that i can have my unit ready as per the targeted date which he promised. Will update again when the reno starts/finish. Before/after Service: 2.5/5 Perhaps his lack of experience, all the ideas were from me (he still can asked me what i like to do, send him the picture) which different from my expectation of an ID. As my unit is small, I need him to provide constructive ideas in terms of space-saving which he din. I provided a quite a common functional dining table, he looked lost which made me worried if he can deliver that. I will need to talk to the contractor directly when on-site. Till date, i see no creativity generated by him. Not sure if it's a too small area to play with (but i do not see it as a limitation) Creativity / Constructive suggestions: 0/5 the more i compared, the more i discovered that their pricing is 30-40% more than direct-contractors, 10%-15% more than other IDs (not sure if it is so-coincidentally that Absolook's pricing is the most expensive). during one of his sale-talk, he highlighted that their pricing definitely not the lowest, as what they are delivering are quality and service which they are proud of (no comments on quality of carpentry work as i have not started reno, will comment later but i see the service level is not there) which i also made to believe that what i am paying is the quality and service. he also sales-talked to me that their carpenter is a subsidiary to the company which only handles their projects, thus definitely cheaper and better quality (again) which I do not know how true is that (can anyone comment?). Quality of work: TBA/5 that's my comments so far... i will update 3 weeks later.
  5. it seems like i shouldnt be getting a ID as the space is too small to see a different. mostly carpentry work for built-in cabinets..
  6. hi, interested to know the price range for Master Long's house audit fee. thanks
  7. Hi, Can please share with me the list of Good and Bad FSM? Email: qheiw@yahoo.com.sg Thanks!
  8. Hi All, need your expertise/creativity/suggestions as I dont seems to find any suitable ideas for 1-room shoebox unit (resale). 1. Toilet with 2 doors (swing door facing living room and a sliding door inside the bed-room) - I wanted to cover up the "common door" but ID suggested to install a feature wall which costs me >$2k (dont really feel worth it), is there any cheaper way to camouflage the door? 2. I cant find a suitable corner for make up! dont really need a dressing table, but will need to install half or full length mirror somewhere which I am not too sure how and where is it being done 3. Still considering if just need a washer or both washer & dryer as I dont really want to hang the wet clothes all over the living room 4. Due to limited space, one of the ID suggested to convert the household/bomb shelter into a "walk-in wardrobe" with pole systems. Is there anyone done it and what is the feedback? is it humid and warm? My bomb shelter is near the main door, so it is kinda weird also to convert it to wardrobe, but i have no idea where to store all our clothes! Appreciate you comments in advance!
×