  1. The marble dry lay being done and all set to install next month.
  2. Finally the interior is taking shape, once the ceiling is done I hope the flooring and kitchens would be completed by November 2020
  3. My contractor did construct reinforced concrete base, it was a huge job digging well below the ground with ribar.
  4. Front view of front wall and car poach where the dumpster is placed.
  5. Finally the front entrance wall and new driveway is taking shape.. The road curbs and palm trees had to be removed and new curb built.
  6. I fell into snooze scenario in which my current house under construction was actually I had rejected even before viewing was conducted simply of the house number. For whatever reasons, it was a friend who convinced me to buy it at below banks valuation.
  7. Your bank should be providing foc. Agents do have indications from different banks. Not a big issue nowadays
  8. Initially the height was 1m but I don't like too low and asked for 1.3m, and they mentioned no problem after checking. Thanks for highlighting it to me.
  9. Yes GST included. So far I'm very happy with my main con. Actually he is also my architect, he runs both companies.
  10. Brick works has begun and from what I see I'm ahead of schedule. Really looking forward to early completion.
  11. After almost 3 months of construction, it's finally taking shape, am really happy with the progress.
  12. land 3150, layout is ground floor. mezzanine, second flr and attic level. built up slightly more than 5000 sqft
×