Everything posted by George Yeo
-
Rebuilding my Semi D
Sorry for delayed reply to all asking for contacts, was told by main con that they were unable to take on any projects due to manpower constraints.
-
Rebuilding my Semi D
should be about 10.8m
-
Rebuilding my Semi D
The heat penerated through the glass panel is no joke and especially worst as my orientation faces west, hence decided to add a teak trellis under it. It looks better than expected and more importantly it reduces the heat by at least 1 to 2 degree.
- Lift Servicing By 3rd Party Contractors For Schindler Lift
-
Small bungalow - Rebuild or Reconstruct
Congrats
-
Attic conversion of old house
Of course it's doable but you must be prepared to live in this messy condition.
-
Rebuild 3400 sqft semi d to multigeneration house
I don't think 1 mil is enough, for 3 storey plus basement would give you at least 5500 sq ft of built up area, if I based on $350 psf, you will likely have to budget more than 2 mil with basement. Just my opinion.
-
My rebuild journey, thus far...
-
Consultancy and ID cost
George Yeo replied to Chewie family's topic in Landed & Condo Private Properties Renovation DiscussionAgree with Kellhound to place it at rooftop, I had it at the rear of my attic. Easy to do maintenance and no obstruction.
-
Rebuilding my Semi D
Thank you
-
Rebuilding my Semi D
Common ones like cracked tiles, uneven paint, scratches on timber flooring, dirty and stained glass railing. Many more, it will surface one by one when you have moved in. Good thing is main con is responsive whenever I feedback to them, the hassle is got to clean up everytime when they rectify it.
-
Rebuilding my Semi D
Faced with a small hiccup but nevertheless all settled and moved in after some delay. Expect defects here and there, its a hassle whenever workers come and rectify it. It will take sometime for some other defects to surface especially when I rushed to move in and didn't really inspect the property properly. Meantime had to bare with it and enjoy my new hobby, happy gardening.
-
Cost of leveling the 1st floor while doing A&A
That means your ceiling height would be 2.8m after leveling, that's very low.
-
Rebuilding my Semi D
Hopefully no news is good news for my case. Thanks Snoozee
-
Rebuilding my Semi D
Yes, QP has submitted the photographs last week, still no news yet.
-
Rebuilding my Semi D
Some updates, unable to move in but the progress is positive, should be thereabout before CNY, hopefully. Wish me luck
-
Replacing car porch roof
Snooze has rightly advised the best person you should go to will be your builder, at least you would be able to know the feasibility and costs.
-
Replacing car porch roof
Its quite a huge job from design phase to erecting reinforced concrete beam, I beam and laying of laminated glass.
-
Replacing car porch roof
Its more of a personal preference and also I saw quite a bit of polycarbonate sheets turn yellow over time and kind of aesthetically unpleasant.
-
Replacing car porch roof
I think is not a straight forward thingy just by replacing with cantilevered roof, I remembered that when I decided to change to laminated glass instead of polycarbonate sheets, the Structural engineer got to do resubmission as glass is much heavier and stronger concrete beam and steel bar needed
-
Rebuilding my Semi D
-
Rebuilding my Semi D
-
Rebuilding my Semi D
PMessaged.
-
Rebuilding my Semi D
-
Rebuilding my Semi D
Watertank is done.