Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Deleted

Members
  • Content Count

    8
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Deleted

  • Rank
    Member
  1. Link to mmoh's 2 room BTO mega thread: Link to RyanYTH T-Blog: Link to BunniBoi T-Blog:
  2. Thank you again mmoh for your kind advice again and positive thinking! 👍 Also, really appreciated that you have started this thread, it's really been so helpful reading it 🙏😊 Thanks so much Cranberries for your kind advice too!! 🙏 Yes indeed I am a bit scared of big bugs and insects 😱, so appreciate the tip on the insect screen! I have never heard of it but will definitely look into having it, already a must-have item already 😅 Happy second half of 2021, everyone!
  3. Thank you so much mmoh and jothm for your kind and patient advice!! 🙏🙏 Noted your advice and will try to research further too. Also I just got an email from HDB informing that my bto is delayed for at least one year! 😭 Instead of Q1 2023, it is now Q1 2024 for now, so I guess more time to research and save. 😅 Sorry I have two more question, for the refrigerator, is the raised platform really needed? And for the bomb shelter to be converted to a wardrobe, is there anything that should be done to prevent mold or bugs going into the clothes? Because it doesn't have the closed doors like a normal wardrobe. Thank you!! And hope everyone is safe and healthy and vaccinated
  4. Hi everyone, thanks so much for this extremely informative and helpful thread, and especially to mmoh and ryanyth for the detailed and kind sharing on the reno process! Thanks to everyone else for kindly sharing your reno pics too, really enjoyable to see all your beautiful 2 room homes! I'm still patiently waiting for my 2 room bto to be ready (Q1 2023!), and have started looking around for ideas and also to save up. I have a couple of newbie queries, would be very grateful if anyone can shed some light please. Apologies for the long list, thought I'll try to clarify my questions at one go. - my 2 room bto is in Tengah, so it's built via PPVC which means the OCS is included (no opting out). If I want to change the entire vinyl floor to porcelain tiles, would laying over the titles be possible or would it require hacking? Hoping to have a almost no need to maintain floor, and tiles seem easier for a robot cleaner to clean. - For the kitchen, if I only need a sink, no need cooker (I don't cook), can the gas be disabled? I read somewhere that we need to call citygas if we want the gas or wondering if I don't do anything, the gas will not be enabled for my unit? - I have also opted for centralised cooling, since it seems the most maintenance free option to having my own compressor. However, the SP person said the aircon, piping and trunking will already be preinstalled in the flat already. Would a preinstalled aircon and its parts be a problem if I am overlaying bathroom wall titles during the renovation? - I am also thinking of having the bare minimum capentry work done, maybe just the dB box, the bottom kitchen cabinets with a sink and a small countertop area, and a mirror box in the bathroom. I prefer to have loose furniture so I can shift things around (or in case the furniture breaks down, easier to replace!) Would a contractor be more advisable than an ID in this case? And would a constractor quote also include plumbing and electrical works, like a all in one? Also cause probably the titles would probably be the most expensive, and I'm hoping minimal carpentry will offset the costs. I'm hoping it to be 15k like mmoh if possible. - I would like to get the wall hung toilet bowl. I really like the idea of it ever since I read in someone's else tblog it's really easy to clean and take up minimal space. Does anyone have any experience doing it in a 2 room bto before? - I'm hoping to get a sliding door done after the main door in the small walkway between the bathroom and bomb shelter. Because it's a corridor unit, so it's more to insulate from the corridor sounds. Would a barn door or glass door be more advisable? - How do I approach IDs or contractors for quotes? I keep reading that we need to share our floor plan or meet the ID/contractor at the flat to have hours of discussion and to wait for the quote. Is it advisable at the initial stage to perhaps just WhatsApps the ID or contractor our floor plan, a brief list of what we want to do, the theme, the budget and ask for a itemized quotation instead? Sorry if this sounds silly, I'm really not sure about the process. Sorry for the long list. It's the few things I wasn't sure about. Thanks so much for any advice and info anyone is able to give, much appreciate!
×