Our Long Awaited Flat......

Recommended Posts

After the long wait, finally collected our keys on 13/3/08 and after 1 month of going through ID & contractor's quotation finally set our mind on Linewerkz. Was quite comfortable with the ID after meeting up for the 2nd time which leave a very deep impression of him although the impression was not that good during the first meeting. 13/4 was the date that our FSM come and view our unit and recommend some placement of furniture. Finally tml we get to see the 3D design of our hse. HOpe there wun be any big amendments else the reno will be delay futher as we have to move out of our current hse by july.

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
After the long wait, finally collected our keys on 13/3/08 and after 1 month of going through ID & contractor's quotation finally set our mind on Linewerkz. Was quite comfortable with the ID after meeting up for the 2nd time which leave a very deep impression of him although the impression was not that good during the first meeting. 13/4 was the date that our FSM come and view our unit and recommend some placement of furniture. Finally tml we get to see the 3D design of our hse. HOpe there wun be any big amendments else the reno will be delay futher as we have to move out of our current hse by july.

Congrats :dancingqueen:

hope to see some pics soon :notti:

 

Share this post


Link to post
Share on other sites
After the long wait, finally collected our keys on 13/3/08 and after 1 month of going through ID & contractor's quotation finally set our mind on Linewerkz. Was quite comfortable with the ID after meeting up for the 2nd time which leave a very deep impression of him although the impression was not that good during the first meeting. 13/4 was the date that our FSM come and view our unit and recommend some placement of furniture. Finally tml we get to see the 3D design of our hse. HOpe there wun be any big amendments else the reno will be delay futher as we have to move out of our current hse by july.

the fun part of renovating will come real soon now... :notti:

have fun

and more pics pls... :yamseng:

 

Share this post


Link to post
Share on other sites

Yah, UBK = Upper Boon Keng. Hehe..........pics will have to come later after i have figure out how to post the pic in here first. Hehe....... 90 square metre is quite small loh. We can get that area is becos our current flat is enbloc thats y we get to choose that area at a cheaper price although its not very "cheap" lah.

 

Share this post


Link to post
Share on other sites

so good and lucky to stay in the area!!enblock.so you staying in blk 20??

as my parents also staying in upper boon keng,but in blk 19..

 

Share this post


Link to post
Share on other sites

mi not staying in blk 20.....mi currently staying at sims drive. was given to choose either the kallang side or whampo side but we prefer kallang side as its very accessible to everywhere. Gt a low floor unit in kallang loh cos ballot number was too far but luckily still manage to get a unit lah.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×