Our Small Box (mar & Zar)

Featured Replies

  • Author

Tile Selected:

Common Toilet Wall Tiles

commonroomtoiletwall2.th.jpg

commonroomtoiletwall1.th.jpg

Common Toilet Floor Tiles

commonroomtoiletfloor.th.jpg

Living Room Tiles

livingroomtiles.th.jpg

Edited by bubbli

  • Replies 57
  • Views 15.2k
  • Created
  • Last Reply

Top Posters In This Topic

  • Author

Dining & Kitchen Floor Tiles

diningareakitchentiles.th.jpg

Master Room Toilet Wall Tiles

masterroomtoiletwall.th.jpg

Master Room Toilet Part Wall & Flooring Tiles

masterroomtoiletwallflo.th.jpg

Edited by bubbli

  • Author

Hacking of floor tiles had been completed so far...The wall between the living and the kitchen had been hacked too..For both bedrooms we have decided to overlay laminate flooring (save $$$)..At the moment the flooring tiles is still being laid and yet to complete..

This pic is taken on 3rd day of reno:

img0024l.th.jpg

Will upload others soon...Life has been ver busy so far...with the current reno and Sis wedding is up next mth too at the same time when reno complete...Wat a rush...

Edited by bubbli

  • Author
looks like it's a major overhaul! Congrats!

Thank you...yes whole house is overhaul...we r just hoping everything will be smooth flowing without any hiccups...our ID has been a great help...so everything is k...so now waiting for the reno to complete...

  • Author

Toilet Overhaul & Tiling has been completed as at 19.4.09...very hepi with the outcome...the only thing is both toilets doesn't have the same style of tiling work...but we still love it...

Toilet Overhaul

commontoiletoverhaul.th.jpg

Master Room Toilet (Completed)

mastertoilettilingworkc.th.jpg

mastertoilettilingwork.th.jpg

Common Toilet (Completed)

commontoilettilingworkc.th.jpg

New Window Louvre for both toilets

newlouvrewindowforbotht.th.jpg

  • Author

Kitchen overhaul is also completed...all tiling is done...we have opted out to do the wall tiling cos the $$...kitchen, washing base is also done..except for the fridge base...which will be done later...Windows for the kitchen will be change to the sliding one..We also got the new chute... :D

Kitchen overhaul (Complete)

kitchenoverhaul.th.jpg

Cabinet Base in Kitchen

kitchencabinetbase.th.jpg

New windows for the master room

newwindowformasterbedro.th.jpg

As for now...all tiling work has been completed...plastering should be done by these 2 days...will be going down to our new abode soon...to see the work done so far...now waiting anxiously for the whole process to complete...New home here we come... :P

Edited by bubbli

  • Author

Reno update as at 27.04.09:

All tiling works is completed except for the laminate flooring in the rooms....Pipings all done up as well..Met up with ID to mark the power point for the electrical works...Also bought all lights for the whole house...Ceiling fan & the instant heater...$$$...Now waiting for the painting to commence this week...The progress of work is smooth flowing and on schedule... :D

Plastering work completion for Living, Dining & Kitchen Area

img0087p.th.jpg

Plastering work completion for Common Room

img0097j.th.jpg

Plastering work completion for Master Room

img0090b.th.jpg

Tiling Work for Steps - Completed

img0065k.th.jpg

  • 2 weeks later...
  • Author

Up to date...painting is 100% completed except for the access area...Love the colours...pastel colours...Lights & Fan r up too..except for the L-box lites and the access area lite...Electrical Switches all done up as well...

Access area tiles r also done up...Like the design...(Initially wanted the pebble wash more...but decided against it as it will wear off with frequent wash..)..But still the end result is good..

Internal Doors are changed...Didn't take any pic until the touch up work r done..

On Sunday..went to Poh Joo to buy the toilet bowls...washing basins...sink..toiletries stuff (mirrors....the towel racks...n etc..etc..) Spent $$$ but still within our budget...

Overall we are satisfied with the work...so now waiting for more finishes to be up...

Living, Dining & Kitchen

img0015vha.th.jpg

Common Room

img0028lgh.th.jpg

Master Room

img0024gqp.th.jpg

Master Room Toilet

img0025rym.th.jpg

Common Room Toilet

img0020rmm.th.jpg

Knocking down the kitchen wall makes the whole place so spacious.

  • Author
Knocking down the kitchen wall makes the whole place so spacious.

Yup it did...we had made the rite decision when hacking the wall...now waiting for the whole place to be done up soon...

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.