Thanks for your advice. I do agree with what u said. ID always think of business only. Your switches got no back case ?

I am not sure if ur is an Old hdb with expose back boxes..

I was told by my electrician they are very cheap "the white/huge box" only 30 cent or so .. if i dun remember wrongly

he installed those for me free. My electrician was intro by one of the forummer here " one lao jiao"

My id said his electrician very cheap already and so on but still i could get a cheaper one else where .. so pls find second or third opinion if you find his EX.

Sry to mr and mrs SGBuzz for flooding the blog with other stuff :) :) :) :) :)

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
Sry to mr and mrs SGBuzz for flooding the blog with other stuff :) :) :) :) :)

nah . . .it's all right. . . so long as everyone gets to find out whats the best course of action.

Thanks ve_ve for empathising :rolleyes:

My MBR wardrobe and settee are in!! So pretty . . .

The settee feels very good when i sit on it. Maybe if i am angry, I can send Mr Buzz there to sleep for the night and not feel guilty about it. :notti:

Painting completed yesterday.

Plumbing continued, but we had to change 2 of our WCs. There are no gaps between the bowl and the wall, and the piping will run haywire if we keep to the WC. So, we'll change.. . .

Next week, we are looking at:

Monday

- laminate flooring

- invisible grilles installation

Tuesday / Wednesday

- kitchen cabinets

- study room table

- living room settee

*fingers crossed*

 

Share this post


Link to post
Share on other sites

doing a stock-take:

1. Change all windows (starting 6/1)

2. Finish tiling the toilets (after windows are changed)

3. Construct concrete base in kitchen for cabinets

4. Finish tiling work in kitchen

5. water proof and build wet wash area in balcony

6. Cement scree rest of balcony

7. construct new TV wall with store room extension

8. run air con trunking and piping

9. plaster wall and paint

10. polish and make good upstairs and stairs parquet

11. Install downstairs laminate flooring

12. Install kitchen cabinets, wardrobe, settee --> will complete on 28 Jan (Thu)

13. complete wiring and install lights and fans

14. Install book shelf, store room display door, and balcony timber overlay --> will complete on 28 Jan (Thu)

15. Install grilles --> will install on 30 Jan (Sat)

15a. Various touch-ups --> ongoing till HO

16. move from old place to new place --> will start shifting some stuff on 30 Jan (Fri)

17. allocate space for different items

18. unpack

19. put into place

20. shift things around

21. unpack

22. upack

23. unpack

:P

 

Share this post


Link to post
Share on other sites
doing a stock-take:

1. Change all windows (starting 6/1)

2. Finish tiling the toilets (after windows are changed)

3. Construct concrete base in kitchen for cabinets

4. Finish tiling work in kitchen

5. water proof and build wet wash area in balcony

6. Cement scree rest of balcony

7. construct new TV wall with store room extension

8. run air con trunking and piping

9. plaster wall and paint

10. polish and make good upstairs and stairs parquet

11. Install downstairs laminate flooring

12. Install kitchen cabinets, wardrobe, settee --> will complete on 28 Jan (Thu)

13. complete wiring and install lights and fans

14. Install book shelf, store room display door, and balcony timber overlay --> will complete on 28 Jan (Thu)

15. Install grilles --> will install on 30 Jan (Sat)

15a. Various touch-ups --> ongoing till HO

16. move from old place to new place --> will start shifting some stuff on 30 Jan (Fri)

17. allocate space for different items

18. unpack

19. put into place

20. shift things around

21. unpack

22. upack

23. unpack

:P

great...... :good: ...your progress updates already more than 50% completed lieow.......congrates !.......uhmmmm... :( .....the un-packing will be the most tidious......take care .....cheers! :yamseng:

 

Share this post


Link to post
Share on other sites

Hi Ricanne

Has OpenNet came to your house to install the Fibre Optic Point ? The point was install before or after the L-Box ?

I waited for them to install the point before my L-Box goes up. So they came today , the guy told me they do not do trunking and lay cables at Ceiling Level in the L-Box. I just wonder if it is true ? :huh: So he just left terminate the point and leave the excess fibre cable near the door access wall. He said my electrician will know what to do.

How did they install the fibre optic point to your new house ?

Edited by ninja3101
 

Share this post


Link to post
Share on other sites
Hi Ricanne

Has OpenNet came to your house to install the Fibre Optic Point ? The point was install before or after the L-Box ?

I waited for them to install the point before my L-Box goes up. So they came today , the guy told me they do not do trunking and lay cables at Ceiling Level in the L-Box. I just wonder if it is true ? :huh: So he just left terminate the point and leave the excess fibre cable near the door access wall. He said my electrician will know what to do.

How did they install the fibre optic point to your new house ?

sorry for the late reply, Ninja.

No, OpenNet did not come. However, we heard that there is a letter from them. We do not have the keys to the letterbox, so not sure what is it about.

Hows your reno going on?

 

Share this post


Link to post
Share on other sites

The invisible grilles have been installed! Check this out.

Balcony

P1260129.jpg

Living Room

P1260128.jpg

I am very happy with the effect but not so on the quality of the workmanships.

If you are going to sandwich steel wires between 2 pieces of metal i would think you cut a channel in the metal pieces so that the both the metal pieces can close together with no gaps. Hiaz....

 

Share this post


Link to post
Share on other sites
$1.2K for 3 location. Balcony, living, and MBR.

Oh okie price seems quite reasonable bah I guess and most impt is your view not obstructed that much with the grille :)

 

Share this post


Link to post
Share on other sites

Carpentry are being installed.

So far, we have had 2 setttes, MBR wardrobe, and study table installed.

Kitchen cabinet is pending solid top next Monday.

Tomorrow, we will have another carpenter coming in to install our full-height bookshelf, decorative storeroom door, and timber flooring for the balcony.

Carpentry is very exciting . . to me :rolleyes:

P1280142-1.jpg

P1280141.jpg

P1280140.jpg

opps! just realised that i am using Buzz's account . . .

ricanne

Edited by SGBuzz
 

Share this post


Link to post
Share on other sites
sorry for the late reply, Ninja.

No, OpenNet did not come. However, we heard that there is a letter from them. We do not have the keys to the letterbox, so not sure what is it about.

Hows your reno going on?

oic. My reno so far so good . The ID will hand over the keys to me on 6 Feb (next sat). On the 9 Feb will move in. But till now Kitchen,bedroom cabinets not install yet. Tv feature wall and console also not yet install.

So when Opennet ppl will come to install the fibre point ?

When your ID will hand u the keys ?

 

Share this post


Link to post
Share on other sites
oic. My reno so far so good . The ID will hand over the keys to me on 6 Feb (next sat). On the 9 Feb will move in. But till now Kitchen,bedroom cabinets not install yet. Tv feature wall and console also not yet install.

So when Opennet ppl will come to install the fibre point ?

When your ID will hand u the keys ?

My fren, damm if i know :huh:

Just to get them to finish up the final few touches is taking so long. :curse:

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×