ninja3101 0 Report post Posted January 26, 2010 Hi All I waited for opennet contractor to install the point before my L-Box goes up. So they came today , the guy told me they do not do trunking and lay cables at Ceiling Level in the L-Box. It is true ? So he just left terminate the point and leave the excess fibre cable near the door access wall. He said my electrician will know what to do. How did they install the fibre optic point to your new house ? Share this post Link to post Share on other sites