Hi can i check with those that have purchase premium flat, how much was the renovation cost about?

please advise

40k?

depends on what you are doing....

 

Share this post


Link to post
Share on other sites
40k?

depends on what you are doing....

I b herring by flat next year

the flooring is done by HDB.

I intent to do the following;

- kitchen cabinet

- feature wall

- hide the bomb shelter

- l-box

- shower screen door for both toilet

- change toilet doors

 

Share this post


Link to post
Share on other sites

Hi,

standard kitchen cabinet will be abt 2.5k

feature wall 1k

shower screen door 1k

the rest I dunno.

These are so far what i see from the quotes I got.

Also depends on materials, and other misc like lighting pts.

 

Share this post


Link to post
Share on other sites
Hi,

standard kitchen cabinet will be abt 2.5k

feature wall 1k

shower screen door 1k

the rest I dunno.

These are so far what i see from the quotes I got.

Also depends on materials, and other misc like lighting pts.

Thank You 'jtjw' for ur reply

 

Share this post


Link to post
Share on other sites
I b herring by flat next year

the flooring is done by HDB.

I intent to do the following;

- kitchen cabinet

- feature wall

- hide the bomb shelter

- l-box

- shower screen door for both toilet

- change toilet doors

Take this as a guide, it can be more by 10-20% depending on material used.

-Kitchen cabinet top 10ft, bottom 10ft, total 20ft - $2000

If using Blum hinges, prepare to add in another $500

- Solid surface kitchen top, 10ft - $800

If using Corian solid surface is max. $1500

- India, Finland, Norway, Granite kitchen top, 10ft with 60-65mm backsplash, 40mm 45 deg front profile - $1500

If using China granite top, is ard $1000

- Quartz kitchen top, 10ft - $2000-$2900 depend on which models selected

- 6mm coloured tempered glass backsplach, 10ft - $800

Plumbling and electrical work for the kitchen area is ard $400

- Feature wall 6ft, simple design is ard $750

-TV console 6 ft, - $800

- Feature wall for bomb shelter, 6ft is ard $750

- L-box is calculate @$10pfr, if not doing much, is calculate as 1 lump sum.

- 10mm tempered glass shower screen, 1 fix panel, 1 swing door cost $400 each L1.5m x H1.8m

Sliding tempered glass shower screen is $600 each

- Toilet door is depend on brand and material used. Normal Top hung bi-fold door cost $250each, Pd door cost $269-$399each.

Dismantling and disposal of existing HDB toilet door and also make good the surrounding area will cost u another cost ard $400.

:yamseng:

 

Share this post


Link to post
Share on other sites
Take this as a guide, it can be more by 10-20% depending on material used.

-Kitchen cabinet top 10ft, bottom 10ft, total 20ft - $2000

If using Blum hinges, prepare to add in another $500

- Solid surface kitchen top, 10ft - $800

If using Corian solid surface is max. $1500

- India, Finland, Norway, Granite kitchen top, 10ft with 60-65mm backsplash, 40mm 45 deg front profile - $1500

If using China granite top, is ard $1000

- Quartz kitchen top, 10ft - $2000-$2900 depend on which models selected

- 6mm coloured tempered glass backsplach, 10ft - $800

Plumbling and electrical work for the kitchen area is ard $400

- Feature wall 6ft, simple design is ard $750

-TV console 6 ft, - $800

- Feature wall for bomb shelter, 6ft is ard $750

- L-box is calculate @$10pfr, if not doing much, is calculate as 1 lump sum.

- 10mm tempered glass shower screen, 1 fix panel, 1 swing door cost $400 each L1.5m x H1.8m

Sliding tempered glass shower screen is $600 each

- Toilet door is depend on brand and material used. Normal Top hung bi-fold door cost $250each, Pd door cost $269-$399each.

Dismantling and disposal of existing HDB toilet door and also make good the surrounding area will cost u another cost ard $400.

:yamseng:

ThankS' jaskel' - for replying- i guess roughly i hv to put aside $25K

 

Share this post


Link to post
Share on other sites

If you are doing quite a bit on fixtures then will be more expensive due to it is make to measure.

also set aside ur about 2K for your lightings, lighting point, cable point (if need to shift) and wiring.

 

Share this post


Link to post
Share on other sites
If you are doing quite a bit on fixtures then will be more expensive due to it is make to measure.

also set aside ur about 2K for your lightings, lighting point, cable point (if need to shift) and wiring.

ThkZ For the Advice...

 

Share this post


Link to post
Share on other sites

Hi, Guys.

I always heard fellow friends says that, it is always good to keep around $1k to $2k for lighting.

Is that true? What are the other thing that I had to come out with cash during the renovation period. Doing my renovation early next year, so I am recce-ing around =)

Thanks alot.

 

Share this post


Link to post
Share on other sites

window8, it would be good to ask around for quotations from contractors....tat would be a gd gauge....

however, as per ur list below and dependent on the material cost (according to wat kind of material u choose), on a safe bet, u need to set aside at least about 25k to 30k....

I b herring by flat next year

the flooring is done by HDB.

I intent to do the following;

- kitchen cabinet

- feature wall

- hide the bomb shelter

- l-box

- shower screen door for both toilet

- change toilet doors

 

Share this post


Link to post
Share on other sites
Hi, Guys.

I always heard fellow friends says that, it is always good to keep around $1k to $2k for lighting.

Is that true? What are the other thing that I had to come out with cash during the renovation period. Doing my renovation early next year, so I am recce-ing around =)

Thanks alot.

I got mention as above on the lighting part. For advise would be 2K. Things keep increasing but no salary. sigh~~

During renovation period there are a few things need cash -

1) Kitchen

- hob and hood

- kitchen basin

- tap

- fridge

( check the measurement first then ask ur ID/contractor to do the measurement, if you want to do base for your fridge. )

- washing machine and dryer (if needed)

( check the measurement first then ask ur ID/contractor to do the measurement, if you want to do base for your washer and dryer. )

2) Air-con ( must know what system and how many compressor you want. Eg . system 4 for all the rooms and one for the living room)

Others like living room and bedroom all depends on the design which you liase with your ID/contractor. :paint:

Do remember that if anything which is required to build then you need to get it first.

 

Share this post


Link to post
Share on other sites

Hi window,

have u source for quotations?

so far for mine is roughly around 18k for most of the firms I asked around for works like

false ceiling and L box

living rm partition and full height shoe cabinet

kitchen (the usualy stuff) (it normally measure up to 24 ft with solid top at abt 3 - 4k)

mbr wr + bedframe with storage + low cabinets at window side + 2 side table

2 toilet glass shower screen

window grill whole house + SY window

tv cosole + feature wall

painting

plumbing + misc

The material they provided are quite ok, unless u want top graded material.

 

Share this post


Link to post
Share on other sites
I got mention as above on the lighting part. For advise would be 2K. Things keep increasing but no salary. sigh~~

During renovation period there are a few things need cash -

1) Kitchen

- hob and hood

- kitchen basin

- tap

- fridge

( check the measurement first then ask ur ID/contractor to do the measurement, if you want to do base for your fridge. )

- washing machine and dryer (if needed)

( check the measurement first then ask ur ID/contractor to do the measurement, if you want to do base for your washer and dryer. )

2) Air-con ( must know what system and how many compressor you want. Eg . system 4 for all the rooms and one for the living room)

Others like living room and bedroom all depends on the design which you liase with your ID/contractor. :paint:

Do remember that if anything which is required to build then you need to get it first.

Ok, I see. Intend to buy bit-by-bit. So son't need to outlay so much cash when the time comes.. . .

Thanks anyway for yr suggestions.

By the way, anyone had any idea what other item does BTO flats comes with apart from the doors which I bought and the done-up flooring. . .

I was wondering does it comes with sink, taps and etc.

How about toilets, we install our own sink too?

Edited by hengmenghwee
 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×