Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Is This Quote Reasonable

Featured Replies

Hi, can someone let me know if this quote is reasonable? I have 3 toilets at home. The size are 10ft by 4.5ft, 7ft 5" by 2ft and 3ft by 3ft 7".

The kitchen size is 7ft 4" by 7ft 4". I intend to redo the kitchen and all the toilets in the house, including hacking of the floor tiles and removing the old kitchen cabinets. Thank you.

Demolition work

to supply labour & tools to:

1) hack off existing sink & stove's concrete support at kitchen

2) dismantle existing kitchen cabinets

3) demolish top half of existing internal wall between living & kitchen

4) dismantle existing metal door frame at WC3

5) hack off existing floor and wall tiles at kitchen

6) hack off existing floor and wall tiles at WC3

7) hack off existing floor and wall tiles at WC2

8) hack off existing floor and wall tiles at WC1

9) hack off existing floor tiles at balcony

10) demolish existing long bath at WC1

11) dismantle existing sanitary wares, water pipes, wiring in 3 toilets

12) dismantle existing main entrance door & gate

total $2600

Masonry Works

To supply labour, tools & materials to:

1) make good affected areas after demolition of wall $150

2) Construct wall behind top hung kitchen Cabinet with lintol support $350

3) Extent wall at proposed fridge area $180

4) Lay selected range of wall tiles till ceiling height to kitchen $2750

5) lay water proof membrane to kitchen floors prior to laying of tiles $150

6) lay selected range of floor tiles to kitchen $900

7) construct cabinet bases c/w matching tiles finish on front edge $250

8) construct fridge base & washing machine base c/w matching tile finish $200

9) construct 50mm kt kerb at proposed storeroom area $120

10) lay selected range of wall tiles ti ceiling height to WC3 $1120

11) lay selected range of floor tile to WC3 $400

12) lay selected range of floor tile to service balcony $750

13) lay selected range of wall tiles ti ceiling height to WC2 $2100

14) lay selected range of floor tile to WC2 $450

15) 13) lay selected range of wall tiles ti ceiling height to WC1 $1380

16) lay selected range of floor tile to WC1 $450

Partition work:

construct gypsum board to form store room at kitchen $350

Plumbling

To supply labour, tools & materials to:

1) Re-run copper water pipe for whole house (cold pipe only) $900

2) install 3 sets of pedestal wc bowl (labour only) $240

3) install 3 sets of wash basins and taps (labour only) $180

4) Install 3 instant water heaters (labour only) $180

5) install kitchen sink & connect inlet & outlet (labour only) $120

6) Install bathroom accessories for 3 bathrooms (labour only) FOC

Carpentry works

to supply labour, tools, materials to fabricate & install the follow carpentry work, in solid plywood with laminated finish:

1) total 36ft kitchen cabinet c/w ABS edgin doors, 2 tier dish rack, cultery tray, designers handles or 45 degree edged doors & silent closed hinges $4320

2) suspended vanity cabinet c/w frosted glass doors for WC 2 (L4ft) $560

3) L4ft wall mirror c/w open shelves for WC2 $480

4) suspended vanity cabinet c/w frosted glass doors for WC 1 (L2ft) $280

Electrical works

To supply labour, tools, materials to run the following electrical points:

1) 8 lights points $280

2) 3 heater points $300

3) 3 double socket $210

4) 1 single socket $50

Miscellaneous

To supply labour, tools, materials to:

1) undercoat oil base sealer to 3 bathrooms ceiling & gypsum board partitions $150

2) install 10mm thick clear tempered glas shower screen WC2 $480

3) install wrought rion main gate (3ftx7ftt) $480

4) install solid nyatoh main door c/w pressed lock $450

5) install 3 sets of acrylic bi-fold doors for toilets $600

6) install 1 sets of acrylic sliding doors for storeroom $200

7) do haulage, removal, disposal of debris $200

8) do acid wash before hand over FOC

Total cost: $27,920

copper pipe is more exp than stainless steel pipe now

Hi, can someone let me know if this quote is reasonable? I have 3 toilets at home. The size are 10ft by 4.5ft, 7ft 5" by 2ft and 3ft by 3ft 7".

The kitchen size is 7ft 4" by 7ft 4". I intend to redo the kitchen and all the toilets in the house, including hacking of the floor tiles and removing the old kitchen cabinets. Thank you.

Demolition work

to supply labour & tools to:

1) hack off existing sink & stove's concrete support at kitchen

2) dismantle existing kitchen cabinets

3) demolish top half of existing internal wall between living & kitchen

4) dismantle existing metal door frame at WC3

5) hack off existing floor and wall tiles at kitchen

6) hack off existing floor and wall tiles at WC3

7) hack off existing floor and wall tiles at WC2

8) hack off existing floor and wall tiles at WC1

9) hack off existing floor tiles at balcony

10) demolish existing long bath at WC1

11) dismantle existing sanitary wares, water pipes, wiring in 3 toilets

12) dismantle existing main entrance door & gate

total $2600

Masonry Works

To supply labour, tools & materials to:

1) make good affected areas after demolition of wall $150

2) Construct wall behind top hung kitchen Cabinet with lintol support $350

3) Extent wall at proposed fridge area $180

4) Lay selected range of wall tiles till ceiling height to kitchen $2750

5) lay water proof membrane to kitchen floors prior to laying of tiles $150

6) lay selected range of floor tiles to kitchen $900

7) construct cabinet bases c/w matching tiles finish on front edge $250

8) construct fridge base & washing machine base c/w matching tile finish $200

9) construct 50mm kt kerb at proposed storeroom area $120

10) lay selected range of wall tiles ti ceiling height to WC3 $1120

11) lay selected range of floor tile to WC3 $400

12) lay selected range of floor tile to service balcony $750

13) lay selected range of wall tiles ti ceiling height to WC2 $2100

14) lay selected range of floor tile to WC2 $450

15) 13) lay selected range of wall tiles ti ceiling height to WC1 $1380

16) lay selected range of floor tile to WC1 $450

Partition work:

construct gypsum board to form store room at kitchen $350

Plumbling

To supply labour, tools & materials to:

1) Re-run copper water pipe for whole house (cold pipe only) $900

2) install 3 sets of pedestal wc bowl (labour only) $240

3) install 3 sets of wash basins and taps (labour only) $180

4) Install 3 instant water heaters (labour only) $180

5) install kitchen sink & connect inlet & outlet (labour only) $120

6) Install bathroom accessories for 3 bathrooms (labour only) FOC

Carpentry works

to supply labour, tools, materials to fabricate & install the follow carpentry work, in solid plywood with laminated finish:

1) total 36ft kitchen cabinet c/w ABS edgin doors, 2 tier dish rack, cultery tray, designers handles or 45 degree edged doors & silent closed hinges $4320

2) suspended vanity cabinet c/w frosted glass doors for WC 2 (L4ft) $560

3) L4ft wall mirror c/w open shelves for WC2 $480

4) suspended vanity cabinet c/w frosted glass doors for WC 1 (L2ft) $280

Electrical works

To supply labour, tools, materials to run the following electrical points:

1) 8 lights points $280

2) 3 heater points $300

3) 3 double socket $210

4) 1 single socket $50

Miscellaneous

To supply labour, tools, materials to:

1) undercoat oil base sealer to 3 bathrooms ceiling & gypsum board partitions $150

2) install 10mm thick clear tempered glas shower screen WC2 $480

3) install wrought rion main gate (3ftx7ftt) $480

4) install solid nyatoh main door c/w pressed lock $450

5) install 3 sets of acrylic bi-fold doors for toilets $600

6) install 1 sets of acrylic sliding doors for storeroom $200

7) do haulage, removal, disposal of debris $200

8) do acid wash before hand over FOC

Total cost: $27,920

I can do it for 27,500... If u want email to kidobuilders@gmail.com......and i provide 3 D for carpentary works... Cheers

2) install 3 sets of pedestal wc bowl (labour only) $240

3) install 3 sets of wash basins and taps (labour only) $180

4) Install 3 instant water heaters (labour only) $180

5) install kitchen sink & connect inlet & outlet (labour only) $120

I could be wrong but I think it is rare to charge for the above items. Mine came free. Maybe u try asking him to take do it FOC.

Hey I took a second look at ur quote. Is there going to be a kitchen work top? I dun see it in the quote. Pls also get him to include how much are the tiles psf so u know what type of tiles u can pick. for eg @$3 psf

  • Author

No there wont be a kitchen work top. I ll be getting it directly from the supplier to install it. The tiles I can choose up to a maximum of $3.50psf. ID said he will refund me the excess if I choose a lower priced tile. Also for the kitchen cabinets, if actual measurement is less than quoted, he would also refund me the balance. Is this a fair deal?

  • 4 weeks later...
No there wont be a kitchen work top. I ll be getting it directly from the supplier to install it. The tiles I can choose up to a maximum of $3.50psf. ID said he will refund me the excess if I choose a lower priced tile. Also for the kitchen cabinets, if actual measurement is less than quoted, he would also refund me the balance. Is this a fair deal?

Hi ...i think its slightly expensive ...( hopefully im not to late in giving my comments) why dont u go to some contractors where they got packages and then u can add on ... ( sumthing like Chew Interior/ -/ *) coz ...not much expertise needed on design aspects when renovating kitchen and toilets...

cheers

Hi Im also planning for a small reno for kitchen. Whats the charges for the Kitchen top per square foot run ( solid surface top ?? )? if you dont mind , Please help to share the contact of supplier for Kitchen top?

No there wont be a kitchen work top. I ll be getting it directly from the supplier to install it. The tiles I can choose up to a maximum of $3.50psf. ID said he will refund me the excess if I choose a lower priced tile. Also for the kitchen cabinets, if actual measurement is less than quoted, he would also refund me the balance. Is this a fair deal?
  • 1 month later...
Hi, can someone let me know if this quote is reasonable? I have 3 toilets at home. The size are 10ft by 4.5ft, 7ft 5" by 2ft and 3ft by 3ft 7".

The kitchen size is 7ft 4" by 7ft 4". I intend to redo the kitchen and all the toilets in the house, including hacking of the floor tiles and removing the old kitchen cabinets. Thank you.

Demolition work

to supply labour & tools to:

1) hack off existing sink & stove's concrete support at kitchen

2) dismantle existing kitchen cabinets

3) demolish top half of existing internal wall between living & kitchen

4) dismantle existing metal door frame at WC3

5) hack off existing floor and wall tiles at kitchen

6) hack off existing floor and wall tiles at WC3

7) hack off existing floor and wall tiles at WC2

8) hack off existing floor and wall tiles at WC1

9) hack off existing floor tiles at balcony

10) demolish existing long bath at WC1

11) dismantle existing sanitary wares, water pipes, wiring in 3 toilets

12) dismantle existing main entrance door & gate

total $2600

Masonry Works

To supply labour, tools & materials to:

1) make good affected areas after demolition of wall $150

2) Construct wall behind top hung kitchen Cabinet with lintol support $350

3) Extent wall at proposed fridge area $180

4) Lay selected range of wall tiles till ceiling height to kitchen $2750

5) lay water proof membrane to kitchen floors prior to laying of tiles $150

6) lay selected range of floor tiles to kitchen $900

7) construct cabinet bases c/w matching tiles finish on front edge $250

8) construct fridge base & washing machine base c/w matching tile finish $200

9) construct 50mm kt kerb at proposed storeroom area $120

10) lay selected range of wall tiles ti ceiling height to WC3 $1120

11) lay selected range of floor tile to WC3 $400

12) lay selected range of floor tile to service balcony $750

13) lay selected range of wall tiles ti ceiling height to WC2 $2100

14) lay selected range of floor tile to WC2 $450

15) 13) lay selected range of wall tiles ti ceiling height to WC1 $1380

16) lay selected range of floor tile to WC1 $450

Partition work:

construct gypsum board to form store room at kitchen $350

Plumbling

To supply labour, tools & materials to:

1) Re-run copper water pipe for whole house (cold pipe only) $900

2) install 3 sets of pedestal wc bowl (labour only) $240

3) install 3 sets of wash basins and taps (labour only) $180

4) Install 3 instant water heaters (labour only) $180

5) install kitchen sink & connect inlet & outlet (labour only) $120

6) Install bathroom accessories for 3 bathrooms (labour only) FOC

Carpentry works

to supply labour, tools, materials to fabricate & install the follow carpentry work, in solid plywood with laminated finish:

1) total 36ft kitchen cabinet c/w ABS edgin doors, 2 tier dish rack, cultery tray, designers handles or 45 degree edged doors & silent closed hinges $4320

2) suspended vanity cabinet c/w frosted glass doors for WC 2 (L4ft) $560

3) L4ft wall mirror c/w open shelves for WC2 $480

4) suspended vanity cabinet c/w frosted glass doors for WC 1 (L2ft) $280

Electrical works

To supply labour, tools, materials to run the following electrical points:

1) 8 lights points $280

2) 3 heater points $300

3) 3 double socket $210

4) 1 single socket $50

Miscellaneous

To supply labour, tools, materials to:

1) undercoat oil base sealer to 3 bathrooms ceiling & gypsum board partitions $150

2) install 10mm thick clear tempered glas shower screen WC2 $480

3) install wrought rion main gate (3ftx7ftt) $480

4) install solid nyatoh main door c/w pressed lock $450

5) install 3 sets of acrylic bi-fold doors for toilets $600

6) install 1 sets of acrylic sliding doors for storeroom $200

7) do haulage, removal, disposal of debris $200

8) do acid wash before hand over FOC

Total cost: $27,920

Can you PM me your contractor contact? Thanks in advance.

  • 2 weeks later...

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.