Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Diza's Abode

Featured Replies

OVERVIEW:

After visiting about 7 - 8 houses, my fiance and I finally settled on a 3A unit in Yishun. When we decided to buy the unit, we knew we had to change EVERYTHING. The whole unit is bare without kitchen cabinet or built-in wardrobe. The grilles, gate and doors were in their original conditions. And the wiring is a mess.. I hate to see the electrical tubing (or whateva u called it) running across the walls. My parents' place used to be in Sengkang and they had all the wiring concealed, something that might not be possible for old units.

KEYS COLLECTION:

- 6 Dec 2010

RENOVATION WORKS:

- 14 Dec 2010 to 30 Jan 2011

FLOOR PLAN:

floorplan1.jpg

ID COMPANY: IDEAL HOUSE

After visiting about four ID companies, we settled on the last ID we visited as their quotation was the cheapest and we've heard positive reviews about them from this forum. Sean, our ID was very accommodating and he gave good suggestions for our unit. Below is the first layout plan that he planned for us. Along the way, we made many changes.

floorplan2.jpg

LIVING ROOM:

- hack flooring and skirting

- plaster wall

- at the main entrance, "foyer" with pebbles

- featured wall and tv console

- L-box with lights

- ceiling fan

- air-con

COMMON AND MASTER BEDROOMS:

- hack flooring and skirting

- plaster wall

- air-con

KITCHEN

- hack flooring

- plaster wall

- cabinets

- glass panel

- base for washing machine and fridge

KITCHEN BATHROOM:

- hack and change everything except for the pipes and window

MASTER BEDROOM BATHROOM:

- hack and change everything except for the pipes and window

- wet and dry area

- install vanity cabinet with mirror

- install shower glass door

DOORS, WINDOWS AND GRILLES:

- designer door for all doors

- sliding tinted glass windows

- wrought iron main gate

- wrought iron grille for common bedroom and hall

- aluminum grille for kitchen and master bedroom

ELECTRICAL:

- change distribution box

- re-wiring the whole house

- change all single socket to double sockets

TOTAL DAMAGE:

- Reno: abt $30k

- Wiring: abt $2k

- Bathroom accessories & Lightings: abt $3.5k

- Furniture: close to $10k

Edited by DiZa

  • Author

Renovation works has already started since 14 Dec. Yesterday when I visited my unit, hacking of the whole unit has been completed. For the next few days, they will start on tiling and plastering works. Below are some pics of the unit.

Hall - Before and after hacking

hall1.jpghall2.jpg

Common bedroom - Before hacking

room1.jpg

Master bedroom - Before and after hacking

room2.jpgroom2a.jpg

  • Author

Kitchen - Before and after hacking

kitchen1.jpgkitchen2.jpg

Bathrooms - Before and after hacking

bathroom1.jpgbathroom1a.jpg

bathroom2.jpg

Edited by DiZa

Welcome! Ur Reno progressing fast n smooth! More pics!!! :D

  • Author
Welcome! Ur Reno progressing fast n smooth! More pics!!! :D

Thx.. So far, so good.. Will update more pics..

  • 4 weeks later...
  • Author

It's been a while since I last update on my reno progress... So far I'm satisfied with the workmanship although I have to keep in mind that nothing is perfect.. I would say the house is 60% to 70% complete.

Done:

Tiling for whole house

Painting (except for kitchen)

False ceiling

Air con

Wiring

Base for kitchen cabinet, fridge and washing machine

Rubbish chute

Not done:

Kitchen cabinet

Doors

Fixing of bathroom accessories

Window grills

Main gate

Featured wall & TV console

Electrical sockets

Pictures will be uploaded soon... Currently resizing and uploading it...

Edited by DiZa

  • Author

Master bedroom

Before any reno work

DSC09073.jpg

Walls: After plastering

DSC09207.jpg

Walls felt soooo smooth. =D

Air-con installation

DSC09287.jpgDSC09285.jpg

The air-con trunking and air-con ledge area really irritates me! As for the ledge, it was stated in my quotation that it will be boxed up. So that is not a prob at all. Initially I wanted to have the trunking closer to the ceiling but the air-con guy was against it and so is my fiance. They claimed that if there was a leakage, the walls would turn ugly. I had no choice but to have the trunking very close to the floor.. I was prepared to live with the ugly trunking.. However, Sean was soooo nice.. He told me that he will box that area up nicely FOC!!!

Edited by DiZa

  • Author

L-Box

DSC04194.jpgDSC04193.jpg

Air-con trunking and ledge were boxed up nicely.

And the end product (with painted walls)

DSC04198.jpg

DSC04197.jpg

DSC04201.jpg

I'm very2 satisfied... :dancingqueen:

  • 1 month later...

knock knock... :D how's the progress? share pics ler.. ;)

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.