July 14, 201115 yr Author Renovation in progress ~ Week 2False ceiling for cove + down lights at the TV areaCables for two rear speakersFalse ceiling for cove + down lights @dining area
July 14, 201115 yr Author Renovation in progress ~ Week 2False ceiling @DS's room + built in shelves for recess wall done
July 14, 201115 yr Author I sourced for moving companies last month and one of them is The Helping Hand. After talking to Richard on the phone, a site assessment was conducted on the 25 June 11 by Ah Boon with a quotation of a 15 footer lorry, one-way trip at $200+$25 for one floor without lift. I confirmed on the spot for the moving details and 10 free boxes were given. He did not give me his mobile no. and ask me to contact Mr Richard if there's anything.Yesterday when I called Mr Richard, he doesn't seem to have my confirmation and said that since Ah Boon confirmed, that means it's confirmed . BUT, can we check with Ah Boon? So, he asked me to send a SMS with the details so that he can check. Till now, he did not get back to me. Now I'm feeling abit worried that I won't be able to move on 30 July 11! AND that is the day before the 7th lunar month aka ghost month
July 18, 201115 yr Author All the old switches in the house will have to go. Will be going to Choo Chiang to buy clipsal switches including 1-gang, 2-gangs, 3-gangs, water heater, single & double sockets and then getting contractor to install change at $10 each. It is still 50% cheaper than asking contractor to buy and fix. Afterall, they are also getting supplies from Choo Chiang I will be buying the Schneider brand (according to the uncle, Schneider has taken over the Clipsal brand) which is the cheapest. 1-gang costs only $1.30 each.Update on 26/7/11 - Bought all the switches, sockets & telephone outlets from Choo Chiang for a total of $65.00. I also managed to get a cheaper quote to change all the switches & sockets for a package price of $120 for the entire house ~ Thanks to Uncle Ronnie. Edited July 27, 201115 yr by veronehoo
July 26, 201115 yr hi,i just bought my new unit at 64X, just a street across the MRT track. =Phad a hard time seaching for contractor / ID too.. can you pm me details for your? =)we are also a DIE hard fans of Kang Tai... since my parents time till now...i moved 2 houses...still goes back to find them...cheers!
July 26, 201115 yr Author hi,i just bought my new unit at 64X, just a street across the MRT track. =Phad a hard time seaching for contractor / ID too.. can you pm me details for your? =)we are also a DIE hard fans of Kang Tai... since my parents time till now...i moved 2 houses...still goes back to find them...cheers!I will hold back my contractor's contacts until end of this week that's suppose to be the house h/over. So far, comments about workmanship, project coordination and overall experience are also reserved. Still keeping fingers crossed for our moving on this Saturday. Getting anxious cos' there is totally no progress during the 3rd week except for installing of veneer doors and re-vanish of living room & MBR parquet floorings. Pending tasks for the 4th week ie. last week include fitting of WC + basin + toilet accessories, lightings, all carpentry works, shower screeens, toilet doors, mirror @dining area and acid wash + cleaning. Edited July 26, 201115 yr by veronehoo
July 27, 201115 yr Author Renovation in progress ~ Week 3Painting done ~ Living TV area. The colour looks more bluish grey although I chose the pure grey colour.Wonder why the centre is not painted? Likewise for almost the rest of walls where feature walls and cabinets are to be mounted.I asked the contractor and he said b'cos we chose the more expensive paint ("Nippon" & "ICI" ??) and also since feature walls and cabinets will just cover up ??!!! ~ DS's room~ MBR Edited July 27, 201115 yr by veronehoo
July 27, 201115 yr Author Renovation in progress ~ Week 3Paint job abit blotchy, anyway contractor said there will be a last coat done during the last week. Let's wait and see.Hacking hole to be patched upVeneer door latch hole too big - needs to be patched up too Edited July 27, 201115 yr by veronehoo
July 27, 201115 yr I will hold back my contractor's contacts until end of this week that's suppose to be the house h/over. So far, comments about workmanship, project coordination and overall experience are also reserved. Still keeping fingers crossed for our moving on this Saturday. Getting anxious cos' there is totally no progress during the 3rd week except for installing of veneer doors and re-vanish of living room & MBR parquet floorings. Pending tasks for the 4th week ie. last week include fitting of WC + basin + toilet accessories, lightings, all carpentry works, shower screeens, toilet doors, mirror @dining area and acid wash + cleaning.yo really excited to see the whole things coming to an end soon. =) *crossed fingers for you* hopefully everything turns out smooth & great for you...~
July 28, 201115 yr Author Renovation in progress ~ Week 4At last renovation is "taking-shape"Shoe cabinet cum settee at door entranceFeature wall adjoining the shoe cabinet ~ living room (the other side of the wall is reserved for full height mirror)Bomb shelter hidden behind the feature wall Edited July 28, 201115 yr by veronehoo
July 28, 201115 yr Author Renovation in progress ~ Week 4LED crystal hanging light at dining area (the only item that DS chose and it turned out to be a good choice ~ really swee )MBR entrance hanging lightCloser look... Edited July 28, 201115 yr by veronehoo
July 28, 201115 yr Author Renovation in progress ~ Week 4Living room ~ TV area feature wall cum console drawerBuilt-in shelves at one side of the feature wall for DVDs/ display48 inch crestar fan Edited July 28, 201115 yr by veronehoo
July 28, 201115 yr Author Renovation in progress ~ Week 4Swtiches changed to Schneider brand rocker switches ~ 1 gang3 gangsockets
July 28, 201115 yr Author Renovation in progress ~ Week 4My "M1" Kitchen is still in the making (glass backing and granite top will be delivered later)Built-in ovenCommon bathroom ~ rainshower Edited July 28, 201115 yr by veronehoo
Create an account or sign in to comment