singlish88 0 Report post Posted May 31, 2012 can it be done in a day? Share this post Link to post Share on other sites
kingz 1 Report post Posted May 31, 2012 can it be done in a day?can be and cannot be. cos squating pan are "embedded" on the ground. Therefore need to hack away the squating bowl etc. When u do that, the surrounding tiles will be damaged. if your flr tiles are old type, usually cannot get back same matching one. contract will advise u to hack off the whole toilet floor tiles and change new one.if that is the case, at least 2 days to hack and lay new tiles and install new appliances etc.3 days max . Share this post Link to post Share on other sites
taichipanda 3 Report post Posted June 7, 2012 can be and cannot be. cos squating pan are "embedded" on the ground. Therefore need to hack away the squating bowl etc. When u do that, the surrounding tiles will be damaged. if your flr tiles are old type, usually cannot get back same matching one. contract will advise u to hack off the whole toilet floor tiles and change new one.if that is the case, at least 2 days to hack and lay new tiles and install new appliances etc.3 days max .at least a week if include water-proof the floor area around the WC, depend on whether hacking of floor tiles is needed. Share this post Link to post Share on other sites