Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Our Experience In Engaging Contractor For House Renovation

Featured Replies

Hello All -

I like to share my experience with all of you. So that moving forward, you will not make the similar mistakes that me and my wife have overlooked.

1. For those installing Split Unit Air Cons

> When engaging any contractor, ask him about his roles and responsibilities. If he did tell you he is the only one managing the whole things for you, then please ensure that he also does the coordinating and also ensure the air-con man and technician do the right things for you (doing things right is no no for home owners because these people takes short cuts).

>Be very sure the materials they (the air-con salesperson) introduced & supplied to you are the SAME when they bring on the day they install the aircon, also ensure you and your contractor together with that aircon salesperson to go through where you want to lay or run the aircon trunking. Remember this golden rule - All contractors, electricians, plumbers, technicians, painters, tilers, carpenters, etc, etc will ALWAYS take SHORT CUTS to finish the JOB FAST & convenient to them. So whatever they suggest to you, you and your Spouse must ensure that it make sense to you & must not compromise the design and the outlook of your end product.

> Also let them know where do you want to install the blower units. Last but not least you must be around during the installation of aircon trunking. Before letting them kick start the installation, inspect the materials first. If they bring anything wrong or not tally (with the written invoice) to what you have specifically ordered, get them to send back and re-schedule the installation date. Be firm.

2. Installing Data Network points

> If you have specifically tell the contractor that you will be running a Cat 6 infrastructure, please ensure that those connectors and keystones they supply to you are meant & designed for Cat 6 cables. I have very bad experiences that those keystones & connectors they used are meant for Cat5. In the end, less than 50% passed the continuity test.

> Get the electrician to tell you the brand or manufacturer for that Cat 6 drum they going to use. Do not use those made in China type. All these cables will be permanently installed as fixture in your flat or condo, etc. So use a fine grade cables.

> Once they patched the connections, ensure they do cable testing and you must be around.

> For those who build network point onto or into your built in study desk, get them to show you how they exact run these sensitive cables. Most contractors took short cut and they treat these data cables like those normal thick copper wires and bend them & squeeze them into the built-in furniture.

> You must get them to tell you where you intend to run & how you like it to run because these electrician always open the shortest path first by hacking into wall and they do not care if there are too many exposed trunking being used to house these data cables. So walk around your house, your rooms, store room, etc and see how the existing copper wires being ran by HDB or by the housing developers for private properties. Do this planning in advance before the actual installation date.

3. Installation downlights or recessed lighting points.

>If you are going to use the downlight concept, again you must let your contractors/electrician know the exact locations on where to install them. Do them let them free play.

> plan the switching pattern based on your lifestyle and living habit. Do you like to have a 2 way switch pattern so that you can turn them on in Dining room and switch them off when are **** room for e.g.

> Get the electrician or contractors to show you what brand they proprosed. Ask the contractor or electrician to spell out the black and white and both you and him sign. you Keep the original and he keep the copy. Don't just based on contractor quote saying that my electician will bill you separately. No no.

> When to install them? Normally all these lights must only be installed after the false ceiling are completed and well painted with sealer and white emulsion paint. Ensure your electrician do the installation after the ceiling people completed their job. You will ask me why me ensure these people? Should be contractor right? If you trust your contractor, go ahead as i mentioned in point 1, they all are in the same boat who love cutting corners. These people are very slippery fishes.

> During the installation date, please be present. Check how your electrician do the first unit of your downlights. If your downlights are circular type, ensure your electrician use a proper tools to cut a nice circle shape; must not use those normal small hack saw and simply cut a square shape. If your electrician is doing this, he must also be a good at plastering the false ceiling. Do you think electrician can do a good job in plastering the big hole which is opened so wide due to improper usage of tool? They are specialising in electrical wiring work, not plastering walls or plumbing jobs. So stop your electrician if he is NOT using the right tool to do the job. Call your contractor to come down if he is not on site.

> imaging this: If he is going to patch that hole near your brand new downlight, the chances of white plaster or paint touches your downlight is very high even they uses tape to mask out the area. But i can tell you that if the Owner is not present during the installation, they will hack care.

4. Installation of all switches and 13 Amp sockets.

> If really your contractor's electrican is going to bill you. Normally contractor will give you a rough quotes e.g. saying that one 13A point is about $55 per point. Tell your contractor or electrician that you are also interested to know what brand they are using, $55 per point for a China made brand is not a good deal. Legrand switch or MK ranges will be a better choice and if you google them, you can in fact buy the parts you like and pass to your contractor/electrician to install them. So the above quotation must change to cheaper because you supply the raw materials. If your electrician spoils them or scratch them, they must buy the same replacement part number at their cost. Take down all these mistakes they have created.

There are a lot more to share with all of you. i will slowly write them down during my free time.

5. Installation of wash basin in toilet

6. Installation of Pdoors/Aluminium windows frame

7. Installation of large size fish tank

8. Installation of built in wardrobe

9. Installation of built in kitchen cabinet

10. Installation of TV console or feature walls for your AV devices like LED TV, etc.

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.