Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

2 Bedroom Condo (Budget Reno)

Featured Replies

Hi all readers,

My fiance & I collected keys to our 2 bedder somewhere in July just weeks before 7th month. We are a bit superstitions so we will start work before 7th month, get it done and then move in after 7th month as we need to wait for our taobao shipment.

We will not be staying here for a long time, therefore we decided to keep the costing and work done to the minimum.

Attached is the floor plan to our 74 sqm condo, it doesn't have much space therefore space management is top priority here.

I have a lot of shoes thus I need a shoe cabinet & my fiance also hope to have a cabinet that we can put our keys and some photos. 

Our ID suggested we cover the DB box area at the entrance with a shoe cabinets with display & storage at the entrance to save space and also maximize the width of the corridor.

We are not so keen on feature wall as we would like to buy off the shelf TV console but we really needed some storage space so we went ahead with the feature wall as well.

 

609583097_WhatsAppImage2018-04-09at23_19_32.jpeg.d4865ad47d0894368f90fdb22961a1bc.jpeg

Edited by Paulina

  • Author

Mirror works

So the guys removed the original ugly mirrors and then had to find a way to slot in conceal wires for the new mirrors. So total of 3 mirrors for 2 bathrooms

 

1024564283_WhatsAppImage2018-09-06at01_11.49(1).jpeg.689305d656539fa359b00bdaa381a911.jpeg

 

793073682_WhatsAppImage2018-09-06at01_11_49.jpeg.15ede76a1235f5da65dc675c003e2102.jpeg

Edited by Paulina

  • Author

Day 3

Lighting plans was proposed & agreed. (Couldn't find the photo)

At the same time, protection cardboard was laid and everything was ready to go

Day 4

Electrical work was completed within a day. Haha I didn't know electrical wires looked like this above false ceiling. Living + 2 bedrooms

1412646974_WhatsAppImage2018-09-06at01_32.21(1).jpeg.98e878b6263200f7485aea56a49baab1.jpeg

 

141777051_WhatsAppImage2018-09-06at01_32.21(2).jpeg.0ced2f56537896663183d99e8fc11b80.jpeg

 

1968447616_WhatsAppImage2018-09-06at01_32_21.jpeg.ad54085ea658cd6b093459025b7adccf.jpeg

  • Author

Day 5

False ceiling works next along with the curtain pelmet. ID proposed the pelmet to conceal the curtain track, because we didn't know such things exist. Our ID also did some drawings on the wall too, I think it's for the contractor because my fiance and me don't understand anything thou. Lol

 

603584524_WhatsAppImage2018-09-06at01_43.12(2).jpeg.9e8768fefdf02f6fe1edb4e7a25a0873.jpeg

 

1875920526_WhatsAppImage2018-09-06at01_43.12(1).jpeg.4e03fb67642b165052f464ce2181fe97.jpeg

 

404720399_WhatsAppImage2018-09-06at01_43_12.jpeg.8eaa141aa7a6d1eedd86eae97f021a60.jpeg

 

2082931676_WhatsAppImage2018-09-06at01_43.12(4).jpeg.ee1108537ec452a16f4ce35f926f7775.jpeg

 

22400959_WhatsAppImage2018-09-06at01_43.12(5).jpeg.a75e7e5fc4636537d9ab2222c1968589.jpeg

 

 

Edited by Paulina

  • Author

Day 6 (Part 1)

We met our ID at the unit to go Malaysia early in the morning because we told him we really wanted to save $$$. When we reach the unit, the uncles were already taping the corners and skirting for the whole house. Shortly after we left for Malaysia . . . . . . 

 

587033491_WhatsAppImage2018-09-06at02_08.17(3).jpeg.ee1f66bd44d1c286e18a0234ac43b919.jpeg

 

1625357996_WhatsAppImage2018-09-06at02_08.17(4).jpeg.1e226d23c0551fdeffd51a9ffd00abb1.jpeg

Edited by Paulina

  • Author

Day 6 (Part 2)

We went to none other than Tampoi, but we needed our ID's help because we don't know the way.

But first, look where our ID brought us. Afterwards, we were at Tampoi and we literally bought the most value for money fan & lights. So we decided on 2x Fanco + 30x Philip downlights

 

1524780290_2015-06-0114_49_34.jpg.ea313e44ee3ac908cae28baa4f10d9fc.jpg

 

1127450425_2015-06-0114_49_22.jpg.3d5a6fca5dab720353393dc9ed74a4f3.jpg

 

496470882_WhatsAppImage2018-09-06at02_08.17(2).jpeg.31f3e760b6cfab024c40beb9038d3843.jpeg

 

289979513_WhatsAppImage2018-09-06at02_08_17.jpeg.e9edd3926385a6c812b5d36489b51691.jpeg

Edited by Paulina

  • Author

Day 7

Met ID at lamitak studio at Lavender area.  The book and the real thing is really different, I actually choose the matt finish laminate for carpentry. But after seeing the big piece, I decided to follow my ID suggestion to use the gloss finishing laminate. We made some changes to the cabinets due to feng shui constraint, but thankfully my ID was able to accommodate as well.

 

1242487845_WhatsAppImage2018-09-06at03_16_47.jpeg.e52c3f9c0203eda4fce0ff10cd7df565.jpeg

 

1004573022_WhatsAppImage2018-09-06at03_17_13.jpeg.e98e34e9497b7141ce64d9214f2bd5f9.jpeg

  • Author

3D for feature wall & shoe cabinet

So after we finalized the laminates and layout of the cabinets, the 3D render & autocad drawing is out the next day.

 

621492083_WhatsAppImage2018-06-24at19_45_42.jpeg.78726f4a94bf05f4f5ae2417607b33b0.jpeg

 

236832659_WhatsAppImage2018-06-24at20_32_12.jpeg.1634ec4bf604042c12d1a51310963d6f.jpeg

  • Author

Day 12 (Part 1)

After a few days of inactivity, the important day finally arrived. Our feature wall and shoe cabinet is about to be installed, tatatatatata.

 

330406793_WhatsAppImage2018-09-06at03_42_09.jpeg.27e30ed2fd0d6703e871285acf7f16b8.jpeg

 

496922955_WhatsAppImage2018-09-06at03_42.09(2).jpeg.c594b879bfea244a55857e7658582d38.jpeg

 

1077933218_WhatsAppImage2018-09-06at03_42.09(1).jpeg.e04fc4d232b31be2a5221af7ac0fdd61.jpeg

 

 

 

191355191_WhatsAppImage2018-09-06at03_42.09(4).jpeg.f5ee3003dff02bb1269de3d2d0953263.jpeg

 

1732817188_WhatsAppImage2018-09-06at03_42.09(3).jpeg.d427127d4df9723343202a0fbe245e7d.jpeg

  • 1 month later...

Hi. Please continue your update. Been waiting for your next post and pictures for a while. 

  • 8 months later...

hi ,

I am now headache with my new bought inter 2 storey inter old house and just do renovation. I had budget $$$ constraint and need to find a contractor to do for me. ? Can please pm me your contractor contact and how much they qoute you? Thank you very much

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.