Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Leaderboard


Popular Content

Showing content with the highest reputation on 05/15/2022 in all areas

  1. 1 point
    Do take note of some unplanned costs which may not be known until you take over the land and performed the various checks and tests: For example, i was hit by a number of additional costs and as a result cut back on my plans to add a lift 1) Soil test results were not good, even though it was in a well-known area where piling is usually not required. In my case, the soil test results were poor and piling costs of $80K added. 2) RC Trench is needed. $35K added. 3) Significant amount of asbestos detected and removal costs of $6.5K. My land is 2100 sqf, original single storey inter-terrace built in 1960s. Planned to construct to 3 storeys with GFA 4,787. Building costs are $1.3M (inclusive of the above additional items), and do not include architect fees of $52k, 3rd party submission fees (e.g URA, BCA) $20K. Carpentery, sanitary fittings, air conditioners will be separately charged.
This leaderboard is set to Singapore/GMT+08:00

×