Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

guy

Members
  • Content Count

    8
  • Joined

  • Last visited

Community Reputation

0 Neutral

About guy

  • Rank
    Member
  1. Not all the case like that lar...... maybe some will be arrogance when they become well known... ironically for some, due to the good reviews, their biz increase, they got too many projects to handle.... they do not want/dont know how to reject new biz..... the fella is after all still a human being..... so many work, the level of attentiveness will not be there..... thus leading to problems.... this partly got to do with the fella experience...... so if you catch them at the bad time, either go for somebody else, if die die must use the fella, then got to bear with it lor.....
  2. wah wah wah... long time neber come in look see the forum full of gun powder I did my reno with lynn and although cannto give 100%..... too much to ask for 100%....we are satisfy with her work.... we choose her because we feel that we can work well with her....... Like choosing wife/husband, not your type, choose another lor... One man's meat is another man's vegetable...errrrr poison........ not happy with this one, choose another one.... it's your $$$$, your choice..... why need to like that leh... relac lar..... life already veri stress, got reno even more stress...... spend more time doing more meaningful thing then come here shoot here shoot there..... peace.....
  3. Well really depend on the agreement you have with the seller........ for my case, I sell and buy.... so I am doing contra..... in this case, on the 2nd appt, I cannot move out yet cause I need to reno my new hse..... so before hand, have an agreement with my buyer.... I sell them lower (take it as a rental of sort) but they need to give me a month or so to reno my new hse........... so base on the compromise, they agree and all put in black and white..... so no issue here.... Try discusiing with the seller and come to a compromise.... this will be win win situation....
  4. Hi All Thank you for the advise and recommendation. I have since found my ID.... apprciate the kind advise....
  5. Hi there, I guess it is never too early to find an ID bah.... for reno, believe it is better early then late.... For our case, we are getting our hse in ard 4months time, we are already looking out for IDs....... and we did settle for one eventaully..... now waiting to look at 3D drawing and very sure will have some changes here and there..... so better to prepare early.... so along the way got change of idea and so on, at least got time to amend.... imagine last min want to make changes.... .....
  6. Hi All Will be doing reno for our 5 room resale flat sometime around july this year. Need advise on any good id to recommend.... saw a few like Tau, U-home, A&D, Plush Living..... Also need advise with a budget of about 30k, is it enough to cover the following: A) Common Items 1 Re-wiring for whole house c/w new switches , socket outlets , SCV points and Tel points 2 Replace stainless steel piping for whole house (Hot & Cold) 3 Re-painting of whole house using ICI paint 4 Chemical Wash of whole house 5 Supply labour for installation of lighting, WC, wash basin, ceiling fans and misc 6 Supply and install Window Grill for whole house 7 To provide haulage and clear debris from site 8 To plaster the wall if necessary B) Recess Area 1 Hacking off floor tiles 2 Remove existing gate 3 Supply & lay heavy duty mat homogenous tile 4 Design & construct hanging shoe cabinet 5 Supply and install Main gate C) Hall/Living/Dining Area 1 Hacking off floor tiles ****/dining area 2 Remove existing cabinet at dining area (non built in) 3 Design and construct TV Console with feature wall 4 Construct Cabinet for storage (to act as a store room) near dining area 5 Supply & lay heavy duty gross homogenous floor tile D) Kitchen 1 Hacking off floor tiles & wall tiles 2 Remove existing kitchen cabinet, rubbish chute 3 Construct base for kitchen cabinet, fridge, washing machine 4 Apply Waterproofing 5 Supply and lay non-slip homogeneous floor tiles 6 Supply and lay wall tiles till ceiling high 7 Design & construct Kitchen Cabinet (L Shape)- Top and Bottom (with anti-slam mechanism) 8 Supply & install solid surface/ Granite for kitchen worktop area (L shape) 9 Supply and install stainless steel rubbish chute (flush to wall) 10 Install 1 set stainless steel Dish drainer 11 Supply & install 2 pair of Bamboo Stick holder E) Master Bedroom 1 Remove existing built in wadrobe 2 Design and construct Built in wadrode integrated with TV Console 3 Overlay with laminated flooring 4 Supply & install naytoh door & door frame with lockset / stopper finishing F) Bedroom 2 (Parent Room) 1 Design and construct Built in wadrode 2 Overlay with laminated flooring 3 Construct tv console (subject to space) 4 Supply & install naytoh door & door frame with lockset / stopper finishing G) Bedroom 3 (Study Room) 1 Design and construct Built in wadrode 2 Overlay with laminated flooring 4 Supply & install naytoh door & door frame with lockset / stopper finishing H) Toilets (Master & Common) 1 Hacking of floor tiles & wall tiles 2 Remove existing WC 3 Supply and lay non-slip homogeneous floor tiles 4 Supply and lay wall tiles till ceiling high 5 Design and construct top cabinet 6 Design and construct Solid surface/ Granite Vanity top with cabinet at the bottom 7 Supply & install tempered shower screen / Half height Wall divider (subject to space) 8 Apply Waterproofing 9 Supply and install PD door 10 Supply and Install louvre windows with wire glass panels TIA
  7. Hi All Will be doing my reno sometime early July for my 5 room resale. Been reading through the forum and kind of zero in (for now) the following ID: 1. Tau Interior 2. Plush Living 3. U Home 4. A&D Anyone is welcome to recommend their ID who has done a good job for them. Also need advise if a budget of 30K is able to cover all the following: A) Common Items 1 Re-wiring for whole house c/w new switches , socket outlets , SCV points and Tel points 2 Replace stainless steel piping for whole house (Hot & Cold) 3 Re-painting of whole house using ICI paint 4 Chemical Wash of whole house 5 Supply labour for installation of lighting, WC, wash basin, ceiling fans and misc 6 Supply and install Window Grill for whole house 7 To provide haulage and clear debris from site 8 To plaster the wall if necessary B) Recess Area 1 Hacking off floor tiles 2 Remove existing gate 3 Supply & lay heavy duty mat homogenous tile 4 Design & construct hanging shoe cabinet 5 Supply and install Main gate C) Hall/Living/Dining Area 1 Hacking off floor tiles ****/dining area 2 Remove existing cabinet at dining area (non built in) 3 Design and construct TV Console with feature wall 4 Construct Cabinet for storage (to act as a store room) near dining area 5 Supply & lay heavy duty gross homogenous floor tile D) Kitchen 1 Hacking off floor tiles & wall tiles 2 Remove existing kitchen cabinet, rubbish chute 3 Construct base for kitchen cabinet, fridge, washing machine 4 Apply Waterproofing 5 Supply and lay non-slip homogeneous floor tiles 6 Supply and lay wall tiles till ceiling high 7 Design & construct Kitchen Cabinet (L Shape)- Top and Bottom (with anti-slam mechanism) 8 Supply & install solid surface/ Granite for kitchen worktop area (L shape) 9 Supply and install stainless steel rubbish chute (flush to wall) 10 Install 1 set stainless steel Dish drainer 11 Supply & install 2 pair of Bamboo Stick holder E) Master Bedroom 1 Remove existing built in wadrobe 2 Design and construct Built in wadrode integrated with TV Console 3 Overlay with laminated flooring 4 Supply & install naytoh door & door frame with lockset / stopper finishing F) Bedroom 2 (Parent Room) 1 Design and construct Built in wadrode 2 Overlay with laminated flooring 3 Construct tv console (subject to space) 4 Supply & install naytoh door & door frame with lockset / stopper finishing G) Bedroom 3 (Study Room) 1 Design and construct Built in wadrode 2 Overlay with laminated flooring 4 Supply & install naytoh door & door frame with lockset / stopper finishing H) Toilets (Master & Common) 1 Hacking of floor tiles & wall tiles 2 Remove existing WC 3 Supply and lay non-slip homogeneous floor tiles 4 Supply and lay wall tiles till ceiling high 5 Design and construct top cabinet 6 Design and construct Solid surface/ Granite Vanity top with cabinet at the bottom 7 Supply & install tempered shower screen / Half height Wall divider (subject to space) 8 Apply Waterproofing 9 Supply and install PD door 10 Supply and Install louvre windows with wire glass panels
  8. Hi All Will be doing our reno for our resale 5 room(119sqm) end Jun or Jul... now doing homework first..... after reading through, we have zoom in on the following: 1. Tau Interior 2. U-Home 3. Plush Living Welcome anyone to recommend ID firm that they have engaged and have got a good experience. Just to check, is 30K to 40K budget enough to do the following: 1. Homo tiles for living, kitchen and 2 toilets 2. Overlay laminate for 3 bedrooms 3. Built in wadrobe for 3 bedrooms 4. rewire whole hse, re-piping (hot and cold), painting, hacking, haulage etc 5. tv console for living and master bedroom 6. window grill 7. solid top for kitchen 8. kitchen cabinet for top and bottem 9. wall tiles for kitchen and 2 toilets 10. vanity top for 2 toilets 11 storage cabinet for 2 toilets 12. storage cabinet **** room (act as a store room)... me hse no store room.... TIA
×