Our 3ng Flat At Amk
ya at 1st we assumed we can fix above our tap but then it looked really weird. Tat was a last min decision to place there. Thanks! (phew)
-
Our 3ng Flat At Amk
Hi no extra money to do false ceiling. just leave it alone...of cos the whole ideal look will never b completed cos can see some old trunkings and uneven walls / ceilings. today theyvarnished the parquet floors. It still smelled tho I went at night aft work.
-
Need With With Cement Screed Flooring
Of cos U may. but I feel I needed 2nd opinion on my current flooring.can't help thinking those workers screwed it all up! I do agree natural hairline cracks has it's beauty.
-
Our 3ng Flat At Amk
- Our 3ng Flat At Amk
hi lilithfiend do show me your cement flooring aft it's done. quite a few water staining marks and dents marks. they need to buffer the wall to even out everything. rainshower from hoe kee kitchen wall lights master toilet quite a few water staining marks and dents marks. they need to buffer the wall to even out everything.- Need With With Cement Screed Flooring
hi we took abt 4-5 months to consider the side effect of cement screed flooring. however we decided that nothing suits us more than those cement look therefore we went ahead with the below 1) cement screed hall flooring 2) cement kitchen table top 3) cement screed toilet walls the cement screed flooring is prob not done properly, it's overly patchy but our id claimed that aft buffering, things would look much better. if not she would get her workers to re-screed not done properly, overly patchy. they have to re-screed this they have to buffer the walls to get rid of the dents marks and water stain markings. workmanship got problem cos now is the peak period and chinese new year is coming where all the workers just want to go back to their country for holidays. they have to buffer the walls to get rid of the dents marks and water stain markings- Our 3ng Flat At Amk
- Our 3ng Flat At Amk
on friday and today the plumbing and electrical works are completed. last night after installation, none of the track lights works. and we gotta rush to chan huat this morning to verify. it turned out that the electrician did not even know how to install simple track lights. such a waste of time. took some more pictures.. hall track lights kitchen pendant lights kitchen wall lights room globe lights- Our 3ng Flat At Amk
hi gantan, if i got extra cash i'd do the following; rewiring for whole house plastering for whole house hack part of the common room down change my main door (the current main door is at least 30 yrs old) and quite a few more- Our 3ng Flat At Amk
speaking abt plastering. i need some help in plastering pricing for 3 room flat. my id quoted me 800 for my kitchen and she used plaster boards cos she said if applied plaster on the walls, the tiles may fall in future. my room, her workers only plastered 2 and a half walls (out of 4 walls in the master room) , she quoted me fir $450 for plastering the lower portion of the walls. and she used plaster boards. is that right? thanks- Our 3ng Flat At Amk
hi rondy, less than 250k. yes very serious work to be done esp the 2 toilets. i hope we can move in by 5 feb 2010- Our 3ng Flat At Amk
hi all collection of keys : 28 dec 09 (waited 5 months!) now left abt 20% work to be completed. a lot of touch up to be done, like my kitchen cement table top, cement flooring and cement toilet walls. that is quite alot! pls see renovation process pictures master toilet with white grouting cement floor still very patchy and some big area darker than the rest, need to do serious buffering before we decided to screed the floor according to my ID cement kitchen table top, need to re screed again cos very patchy master room moisac wall for the mirror and wash basin- Our 3ng Flat At Amk
hi pre renovation pictures collection of keys : 28 dec 09 (waited 5 months!) now left abt 20% work to be completed. a lot of touch up to be done, like my kitchen cement table top, cement flooring and cement toilet walls. that is quite alot!- Our 3ng Flat At Amk
hi pre renovation pictures collection of keys : 28 dec 09 (waited 5 months!)- My 3ng - Starting My Life Anew
Ya we wanted rugged, a little rustic feel. but right now feels like cave cos furniture not in yet. Today they will fix up the 2 wc and lightings finally! If not my place is always so dark to view aft work-. yes is 67sqm too? Stay tuned more updAtes- My 3ng - Starting My Life Anew
ya the door frame at the bottom is totally off. try to get them to touch up. my kitchen table top just cement, no tiles or solid table top. pretty bare. today they painted the house all white except my cement toilet walls then do up the toilet skirtings which they been pulling it off. stayed till 7pm. it's been very tiring but i certainly hope the result would make it all worthy.- My Dream House :)
hi, my place tiling works is almost 80% done up. now my place looks like a cave- My Dream House :)
hi, my place tiling works is almost 80% done up. now my place looks like a cave- Hm At Tiong Bahru C",)
hi, my place tiling works is almost 80% done up. now my place looks like a cave, 3ng flat at amk. everything shd complete by end JAN 2010- Hm At Tiong Bahru C",)
hi, my place tiling works is almost 80% done up. now my place looks like a cave. everything shd complete by end Jan 2010- Cosy Small Home In North East
hi, my place tiling works is almost 80% done up. now my place looks like a cave- Cosy Small Home In North East
hi, my place tiling works is almost 80% done up. now my place looks like a cave- My 3ng - Starting My Life Anew
hi, my place tiling works is almost 80% done up. now my place looks like a cave, 67sqm 3ng at amk- My 3ng - Starting My Life Anew
hi, my place tiling works is almost 80% done up. now my place looks like a cave, 67sqm at amk- My White House
hi, my place tiling works is almost 80% done up. now my place looks like a cave - Our 3ng Flat At Amk