  1. Hi boringgal, who is yr contractor? Name? Thanks :-)
  2. Defects that i have raised, already 3 weeks, they still ask me to give the workers 'somemore time'. I am getting impatient actually. One of the defect - or is this considered as a defect? Install dustbin also will crooked. They left out those 'difficult to reach' corners when plastering. Dunno careless or lazy.
  3. Alright. This is my glass door - finally. Kitchen view: Living Rm View: Box-up cutted to make way for the track, but the glass door installer also go and cut the track to make way for the box-up, dunno what they doing.
  4. Haha.. i will find a time to go Universal Studio. I am taking things slow now. I raised a few points/defects and 2 weeks already still no news. Nevermind. i keep the 5% first....
  5. Pay cash also must see how much.... As i mentioned, this is mentally very draining, got to manage family, work, and this lousy contractor sometimes is just way too much for me to handle...
  6. The last 5% is abt $1000+, definitely worth more than the cabinet that they proposed. I will keep this blog going until my house is fully done up, sofa bought, TV bough, tidy up, take nice shots and post it up. Although now a bit not so active in here coz got to work and stuff like that...
  7. U looking for job? Review on web archi (security) is one of the many things that we do. When u mention CASE, u rekindle the furious flame within me. The AM said even if i go to CASE, he will still win. But i dun think i will want to go to CASE because CASE very inefficient, after months of investigation and mediation, the result/compensation may not even worth me going thru the hassle of logging a case with CASE. I really suck thumb this time. Dunno if i should hold back the 5%. I wan to move on and get on with life...
  8. Update on my kitchen cabinet: I have talked to the boss, apparently they dun seem to be interested and willing to redo the cabinet. But they offer compensation by offering to do up a seperate cabinet in the kitchen for me. I requested for cash compensation (cos' i have lose confidence in them, not willing to ask them do more things) but they have not get back to me yet. I decided to move on, before i get more drained out more because of this kitchen cabinet issue. They will be in my blacklist. Update on my kitchen entrance glass door: Still not done!!!!! They came and take measurement, increase the width of the side partition wall. They also cut the partition (second time already) to see if there is wood support inside for holding the glass slide track). I am worried if the partition wall is still sturdy enuff to hold the weight of the glass - after they cut up the partion wall 2 times (they mend it back using plastering only). Was told today the workers will come to install the glass door, but never come. WTF. As of today, it has been 3 months plus already, including the CNY delays, house not handed over yet. Glass door not installed and they dun see the urgency. Very bad.
  9. I see i see... so u r familiar with web architecture?
  10. Cannot keep it clean and nice. Now quite messy. Maybe it is not messy, but disorganized. Cos accessories not fixed up yet.... Pinkydot... ? Got to look for her blog...
  11. At least you r in charge of your own work. You dun feet the sore of delays. Why wait so long to do up yr cabinet?
  12. Sorry i made a mistake. Anyway, if you look at my kitchen cabinet top now, very messy, cos i temporary place everything on the top. Have not fix up those accessories yet.
  13. Which part of it is messy you mean? The thing on top of my hob is the packaging stuffs. This pic is taken when the hob has not been secured to the ktichen top - simply cut and hole and put it there first. Those moden pull out system drawer etc i opt out. This pic merely show the design of the cabinet but not exactly functional yet because i have not fixed up those things for me to put my sauces, pepper and cooking stuff. I opt out the hood also because it is going to be a white elephant for me. The cabinet is humane, as long as the basics are there - storage space, hob, sink and hood. But given a chance to pay and customise a cabinet, it can be much better....
  14. I am considering to do this. But i have still some other rectification works and the kitchen glass door not done. If i hold back the 5% will they stop all work altogether? Before i make any decision, i will talk to the boss first.
  15. Talking to the AM alone is draining me out, I got so tired. I want my life to go on. They did proper measurement but did not discuss with me on the design. A 3D drawing is only perpsective in nature and they think if i am ok with perspective means i am ok with anything. Worse, now the end product is not even the same as perspective drawing.
×