Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

yhanie_17

Members
  • Content Count

    115
  • Joined

  • Last visited

Everything posted by yhanie_17

  1. Electrical will be assessed once they see the unit on 13th Sept.
  2. By the way, here's the quotation from my ID as of our last meeting last Monday: HACKING & HAULAGE Hack Existing Master Toilets' Floor and Wall Finishes Hack Existing Common Toilets' Floor and Wall Finishes Hack Existing Kitchen's Floor Finishes Hack Existing Skirting for Overlaying of Laminate **** Room Remove Existing Carpet Finishes at Bedroom 3 Haulage of New & Raw Materials Clearing of Debris HACKING OF WALL(s) (Subject to Approval) Hack Existing Wall at Common Toilet PRELIMINARY WORKS Make Good Hacked Skirting Area(s) & Plaster Smooth Make Good Hacked Doorway & Plaster Smooth (Existing Doorway; TM Preparation Work for New Doorframe) Seal Up Existing Doorway w/ Hollow Blocks & Plaster Smooth C/w Lintor WET WORKS COMMON TOILET Supply & Lay Homogeneous Wall Tiles > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Supply & Lay Homogeneous Floor Tiles > Selection of Tiles: Up to $2.50 psf Waterproofing MASTER TOILET Supply & Lay Homogeneous Wall Tiles > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Supply & Lay Homogeneous Floor Tiles > Selection of Tiles: Up to $2.50 psf Waterproofing BATHTUB SUPPORT Construct Tiled Cement Support for Bathtub KITCHEN Supply Labour and Material to Plaster Smooth Kitchen Wall Supply & Lay 600 x 600 Homogeneous Floor Tiles > Selection of Tiles: Up to $3.00 psf Waterproofing Construct Tiled Cement Base (Sides Only) for Kitchen Cabinets Construct Tiled Cement Base for Refrigerator Construct Tiled Cement Base for Washing Machine CEILING WORKS Construct False Ceiling ****/Dining Room Construct Curtain Pelmet ****/Dining Room (Window Areas) Construct False Ceiling at Master Bedroom LAMINATE FLOORING Supply & Install Laminate Flooring ****/Dining Room (Includes: Skirting) Supply & Install Laminate Flooring at 2x Bedrooms (Includes: Skirting) PARQUET FLOORING REPAIRS of EXISTING PARQUET FLOORING Re-Grind & Re-Varnish Existing Parquet Flooring at 3x Bedroom 3 room WALLPAPER WORKS Supply & Install Wallpaper at Master Bedroom Bedhead CARPENTRY WORKS NOTE: Unless otherwise stated, all Carpentry Works quoted herein are constructed using Solid Plywood w/ Laminate/Veneer Finishes only. Where design/specifications include materials other than Solid Plywood w/ Laminate/Veneer Finishes, relevant charges will apply subject to further quotation(s) & confirmation. LIVING ROOM Supply & Install Full-Height Feature Wall For TV Console 7 feet Supply & Install Suspended TV Console 7 feet MASTER BEDROOM Supply & Install Built-In Full-Height Walk-In Wardrobe Carcuss (Interior: Colour Polykem) 10 feet KITCHEN Supply & Install Built-In Kitchen Counter Top 7 ft run Supply & Install Built-In Kitchen Cabinets 40 ft run > Includes: Choice from FULL RANGE Latest Laminates (Excludes: Metallic Laminates) > Includes: Selected Designer Handles/Knobs > Includes: 1 Pc Aluminium-Framed Frosted Glass Door > Includes: 1 Set Drip-Dry Dish Rack Supply & Install Solid Surface Top 21 ft > Includes: Standard Back-Splash & Front-Edge Profiling PARTITION WORKS Construct Partition Wall at Bedroom 4 288 feet Construct Waterproof Partition Wall at Kitchen GLASS WORKS Supply & Install Full-Height Clear Tempered Glass Panel(s) (10mm) at Master Toilet 21 sq feet DOORS, SCREENS & WINDOWS ROOM DOORS Supply & Install Nyatoh Doorframes 2 nos. Supply & Install Classic Room Doors w/ Lockset 2 nos. Supply & Install Toilet Bi-Fold Doors - Aluminium Frame w/ Acrylic Panels 1 nos. Supply & Install Swing Door at Kitchen Entrance 1 nos. SHOWER SCREENS Supply & Install Frameless Tempered Glass Shower Screen (Includes: Towel/Hand-Rail) 1 unit PLUMBING WORKS Supply & Connect Copper Piping for Whole House ( 2x Toilets) (for HDB Exposed Piping Only) Labour to Install Instant Water Heater & Shower Labour to Install Toilet Wash Basin & Mixer 2 nos Labour to Install Pedestal W.C.. 2 nos Labour to Install Bathroom Accessories (5 pcs) 2 nos Supply & Connect Water Point for Bathtub 1 nos Labour to Install Bathtub 1 nos PAINTING WORKS Painting Works for Whole House > FULL RANGE of Paints from NIPPON > Note: Painting Works is Subject to Max. of 2-3 Coats. Any additional coat(s) OR surface preparation required due to condition of wall(s) will be charged based on On-Site Assessment. OTHER WORKS Supply & Laying of Floor Protection w/ Corrugated Paper (Single Layer) Washing of Whole House (Twice: 1 Acid Wash + 1 General Cleaning) Thanks.
  3. Hahahahaha it's really HUGE! We have finalized the design last Monday and I am now waiting for their final quotation. I am so so excited to start this project.
  4. how much is the damage for the whole renovation? very nice!
  5. Yes. I am planning to change that door into a sliding one...
  6. 30K all in all...it may go up if I still add some more things.
  7. Yes MBR Bathroom is quite big...i'm looking forward to see the real thing as well.
  8. Here's some of the 3D pics from my ID. I have some revisions to be made especially in the kitchen area and walk in wardrobe. Common Toilet Kitchen MBR Toilet MBR TV Console with small study area Walk in Wardrobe
  9. Hi. You can contact this number. Her name is Yvonne (she's my ID) - 84485997. Please tell her that Lelani has referred her.
  10. We have already decided not to put the bed under the window because we also have plan to put a small computer table near the window.
  11. Here's the 3D (JPG) copy of my house...just received the copy from my hardworking ID. Enjoy!
  12. Yes it's a glass one. The tv console can be swinged to the dining area.
  13. Yes the floors on each room is already Parquet so we will not touch it. We'll just do some polishing to make it look new.
  14. Yes 3D is really good...i am optimistic that the atual will be roughly the same if I follow the furnitures that they have added here. ** is really good and very professional.
  15. I have just finished the discussion with my Interior Designer Yvonne at Diana. They have shown me the 3D pics of my living room and MBR. Actually the purpose of this is to check whether I am okay with the concept. This is really the design that I've been looking for...cozy, relax and hotel type of environment. Sorry if the pictures are a bit blurred coz this is a scanned copy from a paper print. My Living Room My Master Bedroom with 2 proposed look I will repost the JPG copy once my ID send the copies to me. Thanks.
  16. how big is your unit? 70K is for reno only not including the furnitures?
  17. I have just completed my 1st appointment yesterday and have paid the following amounts: (I am applying for a BANK loan) 1. Payment for Stamp and Legal Fees 2. Lawyers Fee (little amount since my Bank subsidized the bigger amount) Then I have issued a post dated cheque (dated 1 week before my 2nd appt) amounting to the remaining balance that I need to pay.
×