Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Clementi_PR

Members
  • Content Count

    280
  • Joined

  • Last visited

Everything posted by Clementi_PR

  1. In my humble opinion, silver or gray colour will match industry style better than gold
  2. "Modified" means you have to changes the circuit or something like that? I know some car horn have this "modified" sound, but not sure if that can be implement on door bell. At least you can try to search on car forum too
  3. Day 23 Some of the lighting already installed MCB half installed Tomorrow schedule is to install toilet bowl and bathroom accesories and finisihing the electrical work.
  4. Maybe you can have a DIY project to have similiar wall later. Just make a brick pattern and some gray paint
  5. Not really translucent enough to get a glimpse of the person inside Installation might be a matter of hours, but today, they did not bring the master bathroom door yet Maybe it is fast for you, but i really feels that they could do it even faster actually. Cos they often work half day only. I hope they will not miss the deadline
  6. Jasper told me that the kitchen will be a little bit late. Scheduled to be done on 20th but now can only be done around 22th
  7. Just keep holding the 20%, consider as a punishment to the painter Very good idea, match-ing concept with the wall texture.
  8. Day 22 Cable work 25% done Common bathroom door installed Problem with master bathroom door, the supplier brought wrong colour
  9. Finnaly we bought it at Harvey Norman, as we found the nice dining table there. And we got persuaded to get the matress and a wardrobe over there too
  10. Is the paint job perfectly done now? Wish u all the best
  11. Day 20 Went out looking for sofa, dining table, tv consel, wardrobe, etc. But only can get sofa, dining table and wardrobe plus a matress bed. Don't have time to go to my house. So, no picture for today
  12. I just know there is such kind of door bell How you can find the good quality one soon. It will be totally "Mickey Mouse Club House" If you need anything, just say "Ohhhhh Toddleeeeee...."
  13. Yes, now they start to do the electrical work. Not so soon, the kitchen cabinet still not started. Jasper already do the measurement, but the design seem a bit ackward. The width of each door is different Still waiting for the updated design. Will keep updating the blog daily
  14. What is icq? Somekind of cabinet type? LOL
  15. Day 19 All is clean Drill in process Cable are ready
  16. (1+2+8) + (3+8+8) =30 (3+0) + (1+4) = 8 HUAT AH
  17. Day 18 No photo for today. Acid wash is done. A bit of electric work also started.
  18. Day 17 No photo for today. They started work from 2 pm, to prepare the place for acid wash tomorrow.
  19. 128 and 388 seem really good luck Hope it was at 8th floor
  20. Hope they will do it properly this time. It is realy waste of time getting this kind of contractor.
  21. We use the same hobs T333TG Black, and TB98T for the hoods. Got from Court at $771 with a free electronic oven. Haven't install yet, will post the pic once it is installed.
  22. Good idea to "warm up" for the mag? Stomp - Disneyland-themed HDB flat took three months to do up I think your place is much much more better than this one
×