  1. AH last week in Suntec had $799 with $30 delivery. Guess price will be coming down shortly.
  2. I dont have it offhand, but mine is the R410A model and has 2 GE13, and 2 GE10 as you described. It was about $3770 (or somewhere) then i added a few years warranty of the parts andi t became 4340.
  3. The $200 reduction is purely just cos of sales negotiation. I use 2*13 cos my MBR and TV Room is about the same size and the smaller ones are for common rooms. I have only gotten dismantle services which is prompt and quick.
  4. yeap will get a weekend (maybe Sunday) to knock knock the tiles to make sure they sound solid below. cant wait for that!
  5. Yeap, cos another of my fren is using Alan and he is waiting for this batch to complete, before he gets to start his tiling electrical next or carpentry next?
  6. Day 1 - 20th December: Hacking Day 1 Day 4 - 23rd December: Loading debris to truck. Day 5 - 24th December: Loaded materials (cement, sand, tiles) Day 8 - 27th December: Filling up the walls with cement before tiling Day 10 - 29th December: Completed filling up of 2 toilets, kitchen and balcony walls. Day 12 - 31st December: Tiled Kitchen (half) and Common Toilet Day 17 - 5th January: Completed Tiling for Kitchen, Common Toilet, MBR Toilet. Started Living Room tilings
  7. , Use my combi then! GainCity @ IMM - $4,340 Mistubishi System 4 Inverter with MXY4A28VA, MSY-GE10 *2, GE13 *2 Paid $150 to upgrade 1/2" insulator armaflex, and $494 of 4 years warranty for parts. However if urs is a new flat, u can try toshiba. Made in Japan. If u want to know if u can do it, call Coolserve and give them ur block number. They are able to check that for u. My system 4 from Coolserve will be $3899, GainCity gave an initial price of 3994. In the end, it becomes 3794. that why i went with GC. Yday bought it, today dismantle. Came @ 11am sharp. Good!
  8. GainCity @ IMM - $4,340 Mistubishi System 4 Inverter with MXY4A28VA, MSY-GE10 *2, GE13 *2 Paid $150 to upgrade 1/2" insulator armaflex, and $494 of 4 years warranty for parts. Served by Kelvin Lee.
  9. Day 1 - 20th December: Hacking Day 1 Day 4 - 23rd December: Loading debris to truck. Day 5 - 24th December: Loaded materials (cement, sand, tiles) Day 8 - 27th December: Filling up the walls with cement before tiling Day 10 - 29th December: Completed filling up of 2 toilets, kitchen and balcony walls. Day 12 - 31st December: Tiled Kitchen (half) and Common Toilet
  10. Toshiba can't b loaded in most hdb cos of the larger than usual compressor If u r changing the entire piping shod get r410a. Better to mother earth. Also in future if they stop the production of r22 it will b harder to get the refrigerant.
  11. Anyone tried Toshiba? RAS-4M26SACV / RAS-M10SKCV X 4 Comparing this with Daikin.. The COP actually better.
  12. Has anyone tried Daikin System 4? The specs below: 4MKD75DVM / 3 x FTKD25DVM / FTKD50FVM 3 x 5,118 Btu/hr + 10,236 Btu/hr $3,608.00
  13. Day 1 - 20th December: Hacking Day 1 Day 4 - 23rd December: Loading debris to truck. Day 5 - 24th December: Loaded materials (cement, sand, tiles) Day 8 - 27th December: Filling up the walls with cement before tiling Day 10 - 29th December: Completed filling up of 2 toilets, kitchen and balcony walls.
  14. mine cant as well. no point calling. neubie.. got updates with photos alrady =)
  15. ya... but mine is a super old flat, and they warned us if we take 2 burners, aircon and heater will be a problem! =(
  16. With all the comments... i have to convince my MIL for an exception of the time-bomb in the house. =X My place has no running gas, hence had to use the old days gas tank....
  17. Thanks Aron. I dont have the model number off hand but i need 4 aircons in my place... How much would a daikin system 4 typically cost? It includes installation too.
  18. How is Daikin? I was quoted $3899 for 3+1. Is that reasonable?
  19. *photos updated as above* Journey: Day 1 - 20th December: Hacking Day 1 Day 4 - 23rd December: Loading debris to truck. Day 5 - 24th December: Loaded materials (cement, sand, tiles) Day 8 - 27th December: Filling up the walls with cement before tiling Day 10 - 29th December: Completed filling up of 2 toilets, kitchen and balcony walls.
  20. I guess he met up with a happy problem! lol.. too many customers =) Yeap, so far so good. Whatever he has promised so far, he delivered. That day when we were there to check, we see indians clearing the debris, which we thought, were normal. Then when we peep downstairs, 2-3 Chinese guys (like those 50+ years old ah peks), are supervising them. Should be those Malaysians that you were talking about. We felt relived that these indians had someone to "look after". Cant wait to see the tiles today! Do u *knock knock each tiles?
  21. Journey: 20th December: Hacking Day 1 23rd December: Loading debris to truck. 24th December: Loaded materials (cement, sand, tiles) 27th December: Tiling Day 1 Photos to be followed on, but overall the works of Alan is fast. While there are obvious gaps of non-working days, he has communicated to us earlier that there would be delay as there is another flat that needs to be handover within 1 mth. We are cool with that, prefer him to work steady @ our home instead.
  22. How do u go about choosing it? Pros and Cons of brands? Cant seem to find enough documents on induction hobs to make an intelligent buy =(
  23. Anyone using an induction hob?
×