Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

SophiaCheng

Members
  • Content Count

    32
  • Joined

  • Last visited

Everything posted by SophiaCheng

  1. I have a white cot for sale. Please email me for price if you are interested. sophiawongcheng@hotmail.com
  2. Just moved to y new place with Soon Seng Movers. I am extremely pleased with the movers. The round was from the storage warehouse to my place. Very efficient and careful. The second move was from my moms placecto my new house. Same efficiency and care even though different team. They may not be the cheapest, but certainly in terms of service, they get ,y vote.
  3. It was recommended by the painter. Personally, I had no preference as long as it was lasting.
  4. I am offended. I am 8 months pregnant now and simply cannot clean a three storey house myself. I also do not think it will be fair for my maid to do so. Please consider the context before you make such insensitive comments.
  5. Has anyone got company to recommend to do post Reno cleaning?
  6. Hi, is it ok to say how much they are charging for the rooms and balcony? Do you need to go to the shop or they can come over with the samples?
  7. Closer view of the MBR toilet. The floor tiles are going to be those that look like wood strips. Have used it for my previous place and loved it.
  8. Some updates over the weekend. The new false ceiling for the MBR. The only room in the house that has downlights and cove lights.
  9. hopefully the wet works can complete by next week since my carpenter is coming in with the rest of the cabinets for the rooms as well. Cross my fingers that I can move my items from the warehouse by early October.
  10. MBR shower area wall tiles almost complete. Chosen a resort theme. This is the rest of the MBR toilet wall tiles. Doing the floor tiles as well.
  11. Thanks for the tip MingzhuAng. Hubbi went over yesterday to have a look. Seems ok liao. Cant even see the gaps since the actual sink is smaller. Heng ah. Wall tiles for wet kitchen almost complete.
  12. Almost had a heart attack yesterday. The carpenter used the wrong basin for the dry kitchen. Luckily I went over to have a look and alerted him. The actual basin is too small for the hole that he had cut. Carpenter says it can be rectified with more strips of wood to 'patch up'. I dun know........ Somemore the basin is going to be undermount below the granite top. Will it affect?
  13. Definitely from CCM. Got my Schneider switches for the entire house from there and saved us a great deal. Electrician quoted us double the price, so we bought directly from CCM and passed it to him for fixing.
  14. Original 3rd floor configuration Original 2nd floor confi original 1st floor confi
  15. The wet kitchen will be 'extended' to a L shape so that the space will be maximise. Will also add the tiles so that it will be easier to get rid of the oil and grease. Remember the back fence? It's now this: Brick wall built with an additional planter box for my herb garden.
  16. The original windows on the left were not practical so decided to hack and change to sliding doors instead. Was worried the hacking would affect the marble floor but turned out ok. heng ah otherwise dun know where to get the same marble to patch back. The windows at the kitchen were original the louvers kind. Changing them to sliding as well.
  17. This was the original MBR toilet on the 2nd floor. Now converted to my girls' toilet and tiles added. The new tiles to my son's attached bathroom.
  18. The two single rooms 'opened' for the MBR. One of the toilet opening covered and changed. The MBR taking shape. We've used polycarbonate material to make 'walls' to my WIW and to separate the MBR. The walkway will lead to the toilet.
  19. Since we were not the supertitious kind, we started work in August despite being the 'ghost month'. The more urgent issue was to get the house ready in time before I pop my no.3 in Nov. Hubbi and I co-ordinating this ourselves without ID coz we know what we want and we had contacts on the various companies since we had done this before for house no.2. I think I'm seriously crazy when I'm now into my third trimester and going around is kindof difficult. But what to do, the quotations were seriously even crazier when contractors see the address.
  20. Original 3rd floor single bedrooms. Change to one MBR. The toilet was originally outside and the WC and shower were separated. Now joining them together and adding walls so that the 3rd floor becomes the whole MBR.
  21. Original master bedroom on the 2nd floor. Changing this to two bedrooms for my two girls. View of the original MBR bathroom All hacked
  22. My son's room on the 2nd floor The toilet attached to his room
  23. Dunno what happen to the previous photos. Upload again. The hacked kitchen Wet kitchen View from the back of house Common toilet at the kitchen
  24. Bathroom all hacked. Tub and tiles all removed. 3rd floor: Was two rooms originally. Now going to be the MBR. The bath was two different rooms, one for WC and one for shower. Combining to one L shape bathroom instead. Original 3rd floor two single rooms before change.
×