Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Pokz1981

Members
  • Joined

  • Last visited

Everything posted by Pokz1981

  1. Yeah either have more buffer or control ur costs as agreed in the quote. Renotalk is poisonous... U will get this and that and more after reading more...
  2. Tiling is going fast ever since toilets are done. electric wiring has also started. Heard from ID that measurement of glassworks was also done today. however, still no news of parquet laying for upper floor yet. All tiles have been finalised including the mosaic tiles for the backsplash. Selected 3 different colours to do mixing and matching on tuesday, keeping fingers crossed that end result will look good. Mosaic tiles selected Tiling for kitchen area
  3. Welcome to renotalk! so you will hack both upper and lower?
  4. like your flooring so much. Very nice!
  5. Progress has been slow but since most of the toilets are tiled up. tiling for living have started. Tiling for all areas in 2nd floor have not started and i have no idea when it would be. Tiling for lower floor should all be done up by this week. tiling for common bath Tiling for master bath
  6. ur contractor is doing things fast... post more pics!
  7. thanks dannywmp, mind posting a pic of your shutter?
  8. yeah, PM me the quote too dannywmp. Wanna know if it is motorised and blocks rain?
  9. Hi Ferddy03, Initially i wanted to use Paul Aluminium as this is the only one i can google and find. But seems like my contractor can get someone to come down and do a measurement and quote. So maybe i will let you know thereafter.
  10. Floor tiles are delivered but works are still in progress after the hollow walls are up. Cement screed on those walls and also flooring for bedroom 2 are done.
  11. Paranomic view of the lower reno
  12. Its getting exciting to see progress daily. With all tiles and walls being hacked. Restoration for new walls have begun. Almost all new windows are up except the balcony area. Hoping to see my tiles delivered soon for tiling works to start Kitchen wall tiling, the little entrance to the back in the centre is to the storeroom. While the yet to be tiled up part would be the smaller size study room with the entrance marked with no brick walls in between slightly better view here for the entrance to the store The storeroom. Not really very big but at least better than none to put all the junks here away from view. Masterbedroom toilet extended over to the common bathroom To the left of the master toilet, cement filled after all the hacking
  13. Hi tobehappy, How much did you bought this from where? I see it at one of the shop between bugis junction and bugis+. From there? Thanks
  14. Yes, they are. The first few were from "The originals" but later did i realised that Ethnicrafts were the suppliers.
  15. Thx alot, i took the advice from renotalk postings and went around searching rather than doing buit-in
  16. Hi Razzberrie, I really never enquire about that. But my aircon ledge is at the 2nd floor of balcony area so i dun think its possible.
  17. Furnitures that i have bought... Sideboard for living beside TV feature 2 x Shoe Rack beside entrance TV console for master br Queensize bedframe excluding headboard
  18. After calling for quotes we decided to go back to own relative (although many would say its a no no) but the quotes i received is really all around $115k. Have also spend the past few weeks deciding on what to cut down and remove. However, nothing cut as of now. Except that the carpentry orginally intended for will be replaced by purchased furnitures. Instead of built-in, i know that all these furnitures can go with me anytime i wanna shift out in the future. No longer will there be the cabinets at the living, the roofing at the balcony is also scraped as this would be problematic for aircon maintenance in the future. However, this would be replace with a rain screen shutter. (anyone have contacts for this? So far i have only check out Paul Aluminium) Places for shopping of furnitures.... http://emrenoblog.wordpress.com - i went down to the place after checking out the reno shopping map from this wonderful blog. Revised design from ID to incorporate purchased furnitures. Am asking for the revised quotes after tiles selection yesterday to see how things are going (one thing for sure, budget exceeded to make everything better. Hopefully tiling work can start this week.
  19. Hi Razzberrie, What do you mean by does not allow external extraction? I am not really sure what you mean. thx
  20. Ok, finally back. A period of madness and more to come... It all started with the place i bought have some ceiling cracks and we were told by the contractor who inspected the house that these were structural which makes me all the more scared and cannot sleep well. Spend some time in the forum to search on topics on spalling concretes and etc. In the end, the only way was to call HDB officer to come down for an initial inspection. It was a saturday on 24rd August when after completion and collection of keys i inspected the whole place with the contractors and HDB dun work 24/7. I had to endure for 2 days before giving HDB a call on the following monday which I highlighted the cracks around the place and managed to push for an inspection the very next day. Good job on my HDB Technical officer for being so responsive. The following day when he came down for inspection. He just mention that they are normal cracks which he sees it quite often around the area but i was quite skeptical. End day, we requested for structural engineer to come down for inspection. Within the same week, the engineer came down and inspected both my place and my neighbour place living on top. The ceiling cracks seen in my upper floor staircase area was also found on the living room's floor of my neighbour side. Anyway, nothing i can do but to continue to wait for the engineer report which was supposed to be send the following day (not that efficient though as it came after 6 working days after countless calling to haunt my HDB Technical officer - once again a very helpful person) While waiting for the engineer report to come. HDB permit for hacking was applied and we will given the go ahead to start hacking since the cracks present were already notified to HDB and hence protecting ourselves if HDB were to complain that the cracks were caused by the hacking of existing walls and tiles. Anyway received the email from HDB technical officer that the findings by the structural engineer was that the cracks found were not structural and advise us to find a registered contractor to do the repairs for those crack lines since under "the lease ageement, flat owners are responsible to maintain the initernal of their flat, including repairs to cracks. You are required to engage own contractor to carry out the repair on your own. To assist you, we enclose a list of HDB term contractors whom you can engage on a private basis should you have any difficulty finding one". - I find this acceptable only in the case that the owner upstairs have to mend their floor cracks as any repairs done on my side which is only on half the concrete would be fruitless and what if the cracks appear again 3 months down the road because of the expansion of the upper floor cracks. Anyway, I have reverted the matter to HDB today and will call them again back on monday. In the meantime, hacking has started yesterday. Hope everything turns out well and the reply is from HDB is also well. Below are the pics for this major and tiring reno. Window and grille installations will be next week follow by tiling. Selection of tiles will be tomorrow. Hope everything goes smoothly.... Master BR 2nd Br 3rd Br Living Kitchen
  21. Just received the keys yesterday after 2nd appointment and now the house is all empty and ready for demolition. Contractor has been engaged but costs is still in the midst of discussion. Permit for hacking just got applied for today (anyone knows how long it takes to be approved?) Changes and changes to consider. The original idea to use 2 separate compressor unit seems impossible unless miracle happens since my block is not upgraded and overall consumption of power from "all" compressor cannot exceed 8.5A. However, I did see someone in the same block have 2 compressor installed. Spoke with the salesperson at Gain City and they mention that the owner must have done it illegally. Aircon installation aside, after conversation with the Gain City salesperson. He mention that it would be better not to put a roof over the balcony area as future maintenance would be difficult and even the overhaul of the compressor might require the roof to be remove before the compressor can be change. With the above in mind, we decided that perhaps we should not cover up the balcony and use a roller shutter instead. Anyone has use rainscreen shutter before? Any companies to recomment? Lastly, on a side note. The much recommended Kraus sink has arrived. The thread on kitchen sink really help in making this decision.
  22. I have also made order for this Kraus after all the great reviews. Was thinking about whether it is 30 or 32 but since no difference in price. I go for the big one.
  23. This frame is one of those that caught my eye at the show. Good choice!
  24. Amended drafts and furnitures consideration Dining area backsplash will be amended to the black/grey mosaic type. Haven really went to pick and select material but should be able to find. Balcony/yard area Waterfeature will be put at the waterspot. Washer/DB will be cover up. Plus some extra storage. ID recomment installing Haiku fan at this area but warn that its not cheap. Masterbed room Most tricky part on my mind is to have something pink in the room due to fengshui requirement. ID have selected some Japanese wallpaper but i am looking at cherry blossom sakura wallpaper. The TV feature wall in the room will be discarded. Since we have decided to get Muji Storage bed. We will get Muji cabinet to put the TV. A little Japanese theme in the room with 2 dropdown Japanese lightings. The final jigsaw piece is of course the scenary wallpaper (if that can be found then the pink concept could blend neatly into the design)

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.