Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Pokz1981

Members
  • Content Count

    183
  • Joined

  • Last visited

Everything posted by Pokz1981

  1. Yeah either have more buffer or control ur costs as agreed in the quote. Renotalk is poisonous... U will get this and that and more after reading more...
  2. Tiling is going fast ever since toilets are done. electric wiring has also started. Heard from ID that measurement of glassworks was also done today. however, still no news of parquet laying for upper floor yet. All tiles have been finalised including the mosaic tiles for the backsplash. Selected 3 different colours to do mixing and matching on tuesday, keeping fingers crossed that end result will look good. Mosaic tiles selected Tiling for kitchen area
  3. Welcome to renotalk! so you will hack both upper and lower?
  4. like your flooring so much. Very nice!
  5. Progress has been slow but since most of the toilets are tiled up. tiling for living have started. Tiling for all areas in 2nd floor have not started and i have no idea when it would be. Tiling for lower floor should all be done up by this week. tiling for common bath Tiling for master bath
  6. ur contractor is doing things fast... post more pics!
  7. thanks dannywmp, mind posting a pic of your shutter?
  8. yeah, PM me the quote too dannywmp. Wanna know if it is motorised and blocks rain?
  9. Hi Ferddy03, Initially i wanted to use Paul Aluminium as this is the only one i can google and find. But seems like my contractor can get someone to come down and do a measurement and quote. So maybe i will let you know thereafter.
  10. Floor tiles are delivered but works are still in progress after the hollow walls are up. Cement screed on those walls and also flooring for bedroom 2 are done.
  11. Its getting exciting to see progress daily. With all tiles and walls being hacked. Restoration for new walls have begun. Almost all new windows are up except the balcony area. Hoping to see my tiles delivered soon for tiling works to start Kitchen wall tiling, the little entrance to the back in the centre is to the storeroom. While the yet to be tiled up part would be the smaller size study room with the entrance marked with no brick walls in between slightly better view here for the entrance to the store The storeroom. Not really very big but at least better than none to put all the junks here away from view. Masterbedroom toilet extended over to the common bathroom To the left of the master toilet, cement filled after all the hacking
  12. Pokz1981

    Reno @ Kovan Maisonette

    All pics about renovations of the place
  13. Pokz1981

    Tiling2

    From the album: Reno @ Kovan Maisonette

  14. Pokz1981

    Tiling1

    From the album: Reno @ Kovan Maisonette

  15. Hi tobehappy, How much did you bought this from where? I see it at one of the shop between bugis junction and bugis+. From there? Thanks
  16. Yes, they are. The first few were from "The originals" but later did i realised that Ethnicrafts were the suppliers.
  17. Thx alot, i took the advice from renotalk postings and went around searching rather than doing buit-in
  18. Hi Razzberrie, I really never enquire about that. But my aircon ledge is at the 2nd floor of balcony area so i dun think its possible.
  19. Furnitures that i have bought... Sideboard for living beside TV feature 2 x Shoe Rack beside entrance TV console for master br Queensize bedframe excluding headboard
×