-
Content Count
1,277 -
Joined
-
Last visited
-
Days Won
2
Content Type
Profiles
Forums
Gallery
Everything posted by Yang Guo
-
ohhh hehe u saw it from my door pic not really bright la..its just that day is a sunny day ba
-
yup there is lock provided if i not wrong,its solid door,not hollow
-
can can..no prob,hehe
-
yup,u r right. the shoe cabinet is facing the main door. er,regarding the stove,my fsm recommend me to swap the position of my sink and stove..(so the sink will be about 3-4feet away from the fridge. although will ended up the sink facing window,he says its ok to let the sink face the window, the main impt thing is the stove. its has to be there cos of me and my wife's bazi) anyone place the sink beside the fridge? (abt 3feet away)? main door pic bedroom door
-
hehe binzz, all ur dates are quite similar to mine..my estimated completion date is also b4 xmas.. fridge and washine machine delivery date abt that date too
-
tiles was delivered last wed(7th Nov). The workers are fast, did some knocking already. i cant use "dong tu" date given by FSM.. nobody at fault. my fault cos initially i dont want to see fengshui,so ask my ID to start work. Then 2 days later,changed my mind and look for FSM. requested my ID to stop work for a week. they are going to start tomorrow again
-
its not beside the kitchen wall, its the side at the living room entrance but now, my FS master says we cannot do this way cos this will make us "xin xiong xia zhai"
-
ops, my shoe rack cant place beside the door already. my Fengshui master told me to put in front of the door (at the Foyer there)..hmm..there may be a change of alot of design already lol My kitchen going to be a L-Kichen instead my dining area initially wanted to put L-mirror,but was told to put mirror on 1 side only my bedhead direction also need to be changed now i know where is my wealth location and water location..hehe. but think cost a bomb to buy those fengshui stuff, hai
-
my fengshui master is located at tiong bahru plaza level 3. they have another branch at imm also. i dunno if they r good or not, but their main shifu is the guy who always appear in the tv during chinese new year. i got his disciple to do the fengshui for me. his bookings for the fengshui is quite pack, think shld be ok bah
-
thats a good idea
-
Hi Happy, this shoe cabinet is beside the door..(i didnt place shoe cabinet facing the main door,cos heard that its not good for fengshui)
-
i cant move in ah,need to wait till customary then can move in..my customary is on Sep08..still have long way to go. but cant wait to see my hse finished with all the furniture in.hehe
-
Jasch, congrats! when do u intend to start ur reno? earlier than expected or start next year? hehe next time i can peep at ur reno already
-
heard that money will go out easily if place directly the window (meaning whatever money comes in will goes out fast), tmr i am seeing my fengshui master, will double check with him
-
hehe sparey u have the same question as mine (and same floor plan too )
-
gadgetgal, agreed with you totally
-
ya..most probably is 1feet away from the fridge, but its still near to the fridge, sigh..
-
yup yup i am also waiting for this IT fair to buy the LCD tv
-
hi gadgetgal, no reason la, actually thought of doing a built in oven in tall cabinet, but afraid that i dont have much work space.. so do a oven mounted on the wall will do, at least at the bottom of the oven i still can have some workspace oh ya the layout of my kitchen may change. ie my stove will be shifted to near the fridge..cos i think fengshui shifu dont allow the stove to be there cos its facing the window
-
Hi Happy, the pull out table can only pull in and out, cant push to the other corner de,hehe
-
thanks for ur help my living room my shoe cabinet
-
just started my blog. anyone feel free,can go there see see,hehe,but not many pictures yet la (btw,anyone can teach me how to post the pictures in the blog in a picture style? i dont like url style..)
-
Our first impression of Baroque is.. From their website, reno looks v pricey.. First appt with Baroque @ Joo Chiat, we are a walk in customer. Was attended by Lawrence. Told him our budget and what we want. Find that he is a cheerful and experienced guy. 2nd appt, we went back to see him in 2 weeks time. He provided us 4 pieces of 3D drawings. V impressive cos this is the only company that provides so many 3D drawings and didnt even request for any deposits. While we are discussing through our first quotation, i was telling myself that if this quote is $18k, i will sign up on the spot. (at that time, our first quote is $18k). My wife was thinking abt the same thing also. If 18k we will sign. After discussing the quote, we are all shocked to see the price..lol, really $18k. er...but we didnt sign on the spot eventually la. Cos some other ID companies we have visited still havent get back to us. Signed with Baroque in another 2 weeks later after visiting a showflat done by them. My ID - Lawrence Tan
-
Here is my quotation from Baroque Re : Design Package For HDB 4 Rooms New Standard Flat A Professional Services 1 Design & site co-ordination 2 Space planning layout plan 3 Perspective drawings on all carpentry works 4 Warranty of workmanship & after sales services for 5 years 5 Arrangement for PUB gas pipe installation 6 Consultation on selection of lights, furniture & accessories B Masonry Works (max. Tiles rate S $ 2.50 to 3.00 per sqft ) 1 Supply & lay homogeneous tiles @ living & dining hall flooring c/w cement screeding & skirting. 2 Supply & lay homogeneous tiles @ household shelter flooring c/w cement screeding & skirting. 3 Supply & lay homogeneous tiles flooring @ 03 bedrooms c/w warranty, cement screeding & skirting. 4 Supply & lay heavy duty ceramic floor tiles @ kitchen c/w cement screeding & waterproofing. 5 Supply & construct base for kitchen cabinet, fridge & washing machine with matching floor tiles. 6 Supply & construct shower kerb @ master bathroom 7 Haulage loading of sand, cement, material to unit C Plumbing Works 1 Connect inlet & outlet piping for kitchen sink & washing machine 2 Supply labour to install storage heater or 02 nos. of instant heaters 3 Supply labour to install accessories @ both bathrooms 4 Supply labour to install kitchen sink, hob & hood D Ceiling Works 1 Supply & install false ceiling or light box @ living & dining hall 2 Supply & install false ceiling @ bedroom passageway E Painting Works 1 Supply & apply 03 coats of ICI Dulux pentalite paint to all internal walls & ceilings (max. 8 colours) 2 Supply & apply ICI gloss paint to all water piping, gates, doors, door frames, & sewage pipe F Miscellaneous 1 Supply & lay protection sheet 2 Clean up whole unit with chemical 3 Clearing off debris G Custom Made Build-in Furniture Master Bedroom Area 1 Design & fabricate full height wardrobe in laminate finish c/w swing door (max. 6ft L) Kitchen Area 2 Design & fabricate top & bottom kitchen cabinet in laminate finish c/w 04 side ABS trimming swing door, cutlery tray, 02pcs of glass panels & designer handle ( max. 24ft L ) 3 Supply & install stainless steel dish rack with hydraulic lift-up 04 side ABS trimming door & glass panel ( max. 3ft L ) H Free Item 1 Free solid surface worktop ( 12ft L ) worth S $ 1200.00 Package Total : $12,333.00 I Additional Items 1 Design & fabricate 01 no. of 7ft L suspended TV console cum feature wall in laminate finish c/w glass panels & drawers @ living hall - $1,470.00 2 Design & fabricate 1no of 3ft x full height shoe cabinet @ main entrance in laminate finish - $660.00 3 Design & fabricate 1no of 2ft x low height cabinet c/w mirror @ main entrance in laminate finish -$440.00 4 Design & fabricate 1no of 7ft x full height feature wall @ household shelter area in laminate finish c/w magnetic swing door & shelving - $1,120.00 5 Design & fabricate 1no of 5ft x full height feature wall c/w mirror @ dining hall in laminate finish - $1,100.00 6 Top up existing wardrobe @ master room to sliding door - $375.00 7 Supply & install 1pcs of wall to wall glass panel @ kitchen cabinet area - $480.00 8 Supply & install 1pcs stainless steel backing @ cooker area - $230.00 9 Supply & install 1 set of 10mm thick clear tempered glass fixed panel @ master bathroom w swing door - $520.00 10 Supply & install aluiminuim grilles for living, dining hall ,kitchen area & 3 bedrooms room - $1,380.00 11 Top up existing solid surface top to Black galaxy 2.5ft width @ upper portion kitchen cabinet - $1,080.00 Grand total $21188 less rounding discount($88) = $21100 Electrical works = $1050 Total reno cost with electrical works = $22150