Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Yuooli9

Members
  • Joined

  • Last visited

Everything posted by Yuooli9

  1. Finally bought my first item from Taobao! spent a whole 8 hours surfing taobao website to select my lights, chatting with the sellers, exploring how to buy and how to make payment... I am so glad that it is done and I really felt a sense of satisfaction after it has been done. These are what I have bought The above purchases are bought by myself, with Amcon as my forwarding agent. I also bought a basin cabinet with a greece feel through 65daigou because the seller can only do 物流, ie. they only deliver item to a specific point. I am not sure if 65daigou is able to purchase for me but I just try my luck.
  2. My Hdb permit is approved! Was checking the hdb website on Saturday and realised that it was already approved on Friday. Now we will wait for Alan to start the reno.
  3. IC... so there is no such thing as to register in Amcon first before purchase. Thanks for your explanation!!
  4. ">http://> Hi OceanEleven, I saw your detailed explanation on how to go about making purchases from taobao and think of making my 1st purchase too. I went to Amcon website and saw this. got very confused.... How do I get started to engage Amcon's service? Can u advise me on which form to use if I want to buy items myself from Taobao/Tmall? TIA!!
  5. Thanks for your suggestion! I think it is better to remove it too. will inform HDB when they call for us to collect the key. If not, I will see if I can just scrap it off myself. save the trouble..
  6. I think the work done is ok, considering that it is FOC. As requested by Kenneth (the sales officer for Evorich flooring), they did leave a 5mm difference in height between the bathroom tiles and passageway, and no height difference between kitchen tiles and living room as we intend to lay HERF in the kitchen too. Between bathroom and passageway ">http:// Between kitchen and living room ">http:// Basically, I dont have much to complain about the cement work except for this... ">http:// There is a lump of cement sticking out on the floor between the kitchen and living room. Does anyone know how to remove it? Or should I get HDB to come and remove? Will it affect the HERF when placed on it?
  7. WX received an sms notification from HDB on Monday, informing us that Alan has submitted the request for HDB permit for our flat. What we can do now is to wait for the permit to be approved... Hope it wont take too long... Went alone to our house to see if the cement screed is ready. WX will be overseas for work trip till the end of Sept.. that means I will have to handle all the reno matters myself... So I went up to our unit, opened the door, and this is what I saw... ">http:// ">http:// The cement screed is done!!
  8. Hihi saw your blog, love the design of your tv feature wall! Haha. Blue is actually my HTB's fav colour. My fav colour is green, so we are thinking of having elements of blue-green (turquoise) and blue in the house as these 2 colours fit in to beach theme. Yup, I have seen Xia Xue's blog and likes the beach feel of her house. Hope mine will have that kind of feel too!
  9. After our meet up with Alan yesterday, I spent my whole day at home today working out the electrical points and amending the drawings that WX did for our home design. Need to complete them soon so that we can send them to Alan. As we are engaging a contractor, there are no 3D drawings and so we could only imagine and hope that everything turns up fine. The best we can do to visualise our ideas is to draw our concepts out using 'Paint' in Microsoft and hopefully Alan will have a clearer picture of what we want after looking at the pictures. I will share the pictures once we have finalised them. So stay tuned!! For the electrical points, this is what I have come up with. Do let me know if I have missed out anything! ">http://
  10. Alan was already there when the workers were moving the sand up to our unit. According to Alan, the cost for cement screed will increase starting from 1 Dec 2014, as sand is no longer allowed to be used for cement screeding, so cost will go up as more cement will be used for cement screeding. Not sure if HDB will start charging for cement screeding after 1 Dec. Back to our reno discussion with Alan that day... we had confirmed on the length of the wall to be hacked between the living room and bedroom 3, the overall layout of the house, and the work to be done at various points of the house. Though all these had been brought up and written on the final quotation, Alan's working style is such that he will confirm the work, design, measurement etc. with us again at the actual spot before any commencement of work. He told us that in order to minimise hiccups, he hopes that we will also make it a point to go down to our place and confirm the work when he requests for us to meet. I find his request to be fair enough, just hope that hiccups can really be minimised in this way.
  11. What a busy weekend!! Was rushing from one point to another these few days from meeting friends to meeting up with Alan. Only now do I have time to update my t-blog... Anyway, what had happened these few days was WX received a call from HDB on Saturday morning asking us if it is fine for them to start doing the cement screed. We were surprised by the request as we were expecting to wait for at least 3-4 weeks. We only applied for the cement screed about 10 days ago. HDB told WX that their schedule is actually very packed but they happened to have a slot for us, and if we agree, they will start work immediately..Of course we said Yes! So WX quickly called Kenneth (Staff from Evorich that we signed our flooring with) to liaise with HDB about the thickness of the cement screed that they should do. As we had an appointment with Alan at our house on the same day, we were able to see the commencement of the cement work and at the same time, confirm with Alan on certain details of our renovation work so that he can apply permit. The workers were moving sand to our house when we arrived that day. ">http:// "> http://
  12. Hi Jiawen, May I know which agent did you choose for Taobao purchases?
  13. U are right! Have already been looking at Taobao to see what are the things that we can buy. But I am still indecisive about which agent to choose from and how to calculate shipment costs....
  14. ">http:// ">http:// "> ">http://
  15. ">http:// ">http:// "> ">http:// "> ">http://
  16. ">http:// ">http:// ">http:// ">http:// ">
  17. Pictures that we got our inspiration from ">http:// ">http:// "> ">http:// ">
  18. Thanks! I am keeping my finger crossed! =)
  19. This link below shows you the different choices of HERF available http://www.youtube.com/watch?v=5zsCmBqDegY
  20. If you have been reading the detailed works line by line, you will have noticed that flooring is not included. Initially, WX and I wanted to use wooden-looking tiles for our flooring. We felt that tiles can last longer and do not have issues such as prone to scratches, not resistant to water, termites attack, emission of fumes..and so on. We went to two tile suppliers, namely Hafary and Soon Bee Huat and had actually set our mind on the tiles that we like. However, at the back of my mind, I still prefer the feel that vinyl or timber flooring gives and this is one thing that tiles do not have. Have heard a lot of ppl who uses HERF (High End Resilient Flooring) from Evorich and I like the physical and aesthetic feel that HERF gives. My only concern for HERF is the emission of fumes as it is also considered a type of vinyl flooring. WX is fine with either tiles or HERF. Therefore, just before our 2nd meet up with Alan, we decided to take a look at Evorich showroom. We were served by James who is very patient and helpful in explaining to us the benefits of using HERF, and also to clear our doubts on the concerns that we have. He even burned a sample of the HERF in front of us and I remembered sniffing around for the smell that is emitted. Strangely to say, there isnt much smell from the HERF except for the smell of the thinner that James used to start the fire. And so, our doubt was cleared and we were more or less determined to sign our flooring work with Evorich, especially when we were told that we can get it at expo fair price as they are having a fair at expo now. In the end, we went to Expo last Sunday and had placed a deposit of $500 on HERF flooring. Yeah! Now we just have to wait for our turn for HDB to do the cement screed, which may take about 3- 4 weeks. For those who are interested in HERF, Evorich is having a fair at Expo from now till 7 Sept (Sun) They are selling at $6.50/sqf (excluding GST) at Expo price but they can give a lower price than that if you bargain for it.
  21. Detailed renovation works as below: 1 PRELIMINARIES 1.1 To apply HDB renovation permit 1.2 To provide design concepts and site co-ordination 1.3 To provide chemical wash(2 times) 1.4 To upload materials and clear all debris off site 1.5 To supply labour & materials to lay cover sheet protection. 2 KITCHEN 2.1 Cabinet base for both side. 2.2 Cement screening for one side small kitchen wall. 2.3 Top/ bottom kitchen cabinet with dish tray/ drawer/ soft closing hinges and ABS trimming for sink and stove area, including full height cabinet. 2.4 Bottom kitchen cabinet with drawer/ soft closing hinges and ABS trimming including bar counter support. 2.5 Solid surface work top for new kitchen cabinet including bar counter support 2.6 To supply labour to install sink and connect sink. 2.7 To supply labour to install hob and cooker. 2.8 Tempered back splash glass in between top/bottom kitchen cabinet. 2.9 Tempered swing glass door for kitchen entrance. 3 LIVING ROOM 3.1 4 nos. of top ceiling pillar strips at foyer area. 3.2 full height laminated shoe cabinet at foyer area. 3.3 Full height feature wall. 3.4 T.V console 3.5 Low storage cabinet seatee with side table 3.6 L box for living room area. 3.7 Lay brick wall tiles up to ceiling height. 3.8 Change and extend cabinet at foyer area 4 COMMON BATHROOM 4.1 To supply & install wall to wall mirror. 4.2 Dismantle existing washing basin 5 MASTER BATHROOM 5.1 To construct 50mm shower kerb. 5.2 Low suspended storage cabinet. 5.3 Hollow block wall between dry and wet area with cement screening. 6 PLUMBING WORK 6.1 To supply labour & materials to ran add pipe to connect to gas heater. 6.2 To supply labour to install 02 nos of hand spray tap. 6.3 To supply labour to install accessories for 02 bathroom and kitchen. 7 MASTER BEDROOM 7.1 To supply & install gypsum board to level uneven wall 7.2 To supply & fabricate laminated finish full height alum sliding frosted glass door wardrobe 7.3 To supply & fabricate laminated finish dressing table with drawer and mirror. 8 BEDROOM 2 8.1 To supply & fabricate laminated finish full height alum sliding frosted glass door wardrobe 9 BEDROOM 3 9.1 To hack off existing wall between living room and bedroom 3. 9.2 To make good smooth surface with cement screening after hacking wall. 9.3 False beam support in order to install glass. 9.4 Tempered L shape fixed panel glass . 9.5 Tempered swing glass door for bedroom 3 entrance. 9.6 To supply & install L box design . 10 PAINTING / PLASTERING 10.1 To supply labour and material to paint with ICI/Nippon emulsion paint for whole unit with max 06 colors. Includes : Doors, doors frame, piping, ceiling and wall. ( with 01 layer of sealer coating) 11 GENERAL 11.1 To supply & install alum window grilles for whole unit. Total cost: Around 32.5k
  22. The next thing we did was space planning. We actually had a few rounds of changes before the final one. Our greatest headache is finding a place to put our dining table. Initially wanted to put the dining table at the behind the sofa, however, we changed our mind as we felt that there may not have enough space there for us to have our meal comfortably. Our next choice is to put the dining table next to the shoe cabinet. However, we changed our mind after an ID told us that usually people will not put their dining table there as they do not like the sight of the dining table when they return home and open the main door.... we also agreed to his view.... so another change again... Our last decision is to place the dining table in front of the bomb shelter. We didnt want it there at the very beginning because we think that the dining bench/chair may obstruct the swing of the bomb shelter door... talking about this bomb shelter.... I seriously suspect that HDB has made a mistake in designing the position of the bomb shelter door for the entire project!! Cos by placing the bomb shelter door there, it is as good as wasting the entire space that is in front of the door bcos hardly anything could be placed there without blocking the swing of the door.... Moreover, the other project (Woodlands Dew) that is launched at the same time as ours has its bomb shelter door facing the passageway, unlike ours! This allows the resident to place their dining table in front of the kitchen entrance, against the bomb shelter wall, without blocking anything. Another point about the bomb shelter, notice the 2 air ventilation holes there? Most of my friends had only 1 hole facing the living room. The other is usually in the kitchen so that it is not noticeable by guests. However, our project has 2 ventilation holes facing the living room! Therefore I have all the reasons to think that this is a wrong design by HDB. Ok, think I have complained enough about the bomb shelter... We eventually decided to place our dining table in front of the bomb shelter door as drawn in the pic below as we cant find a better place to put it. Anyway, we usually wont open the bomb shelter door when we are having our meal, just that we have to push the dining chairs in diligently everytime we finished our meal... Enough said, here is the picture of our space planning. Please ignore the crosses and circles in red. Those are actually the locations of the power sockets and switches which are not drawn accurately... "[http://www.renotalk.com/forum/gallery/image/6224-space-planning/]

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.